1
00:00:00.000 --> 00:00:17.119
Please stand and join me in the pledge of allegiance. [clears throat] >> I pledge algiance to the flag of the United States of America and to the republic for which it stands. One nation under God, indivisible, with liberty and

2
00:00:17.119 --> 00:00:35.840
justice for all. >> All right, everybody. Thanks for being here. Uh number three, we're looking at the agenda. We do have a revision to the supplemental letter of agreement with SE under 7A. Do we have any other changes?

3
00:00:35.840 --> 00:00:51.200
And if not, we'd entertain a motion to approve the agenda as revised. >> Make a motion we approve the agenda as revised. >> Second. >> We have a motion by Mike and a second by Rick. Is there any further discussion? >> Hearing none. All in favor of approving

4
00:00:51.200 --> 00:01:08.960
the agenda, please state I. I. >> Anyone opposed state no. Agenda is approved. Number five, guests in open form. Is there anybody here tonight that would like to address council? All right, let's move on to number six, committee reports, presentations, and

5
00:01:08.960 --> 00:01:25.600
awards. We'll start out with police committee. Police try that police committee. We met on July 10th, 0700 like we always do. Um we talked uh the staff uh the sergeant position which the interview started last week and that

6
00:01:25.600 --> 00:01:43.040
process is ongoing. Uh and then just we had a current updating on the um where we're sitting at for staffing right now. Um uh we do have the item on 7B on our agenda tonight. Uh the um the emergency response unit JPA. So we'll talk about

7
00:01:43.040 --> 00:01:57.680
more there. Um uh we we I mentioned quite a bit about part-time employees last time, so um won't go into that much more uh detail now, but we had more discussion on that. Uh we also had the department rifle purchase, which is on our agenda for

8
00:01:57.680 --> 00:02:14.319
tonight as well. Um just a quick update on the codification and then also on the um the uh time sheets uh which we're in the process of moving that over um with the scheduling system that is in progress. And then we had laser tag. Did

9
00:02:14.319 --> 00:02:28.879
we have laser tag? Even though it was screaming hot. That was >> Yeah. It turned into a also a >> pool >> splash pad. There you go. >> So So with that, so we had that that was coming up. So um uh and then National

10
00:02:28.879 --> 00:02:45.360
Night Out of course is August 4th. Um we will have uh plenty of participation from the city there. And then cones with the cops is September 1st. Uh, and just to update, the uh, squad cars um have been ordered. So, that's what I got for police. >> All right, any questions for Rick on

11
00:02:45.360 --> 00:03:01.920
police? All right, we'll move on to public works. >> Public works, we met on the 8th. Uh, Christine Jacobson presented us with a petition for crosswalks on Bank Street. Uh we spent quite a bit of time

12
00:03:01.920 --> 00:03:19.760
discussing it and pros and cons etc. But we made the decision to hold off until the country lumber property has been developed so we know where where where things are going to be before we get too excited about putting in new crosswalks. So that's on

13
00:03:19.760 --> 00:03:35.760
hold. We also discussed uh the street signs. They're they're not labeled southeast, which all the addresses in Becker are southeast. And rather than replacing the street signs with southeast on them, we just are going to replace them as we need to

14
00:03:35.760 --> 00:03:53.760
as time goes on rather than spending a bunch of money for no reason. Uh recycle day, we've decided to cut it to two hours >> and give it a try. And if it doesn't work out that way, we can always change it back the next year. Uh and then uh

15
00:03:53.760 --> 00:04:09.200
wastewater and water treatment. We have a 7A and 7E which will be talked about later. >> All right. Any questions at the mic on public works?

16
00:04:09.200 --> 00:04:26.720
All right. Personnel, we met on July 10th and uh first thing we discussed was the program coordinator restructuring which is under 7D. Bry's going to talk about that tonight. And then uh one item was a reclassification of of one

17
00:04:26.720 --> 00:04:42.880
employee that's on the consent agenda tonight. And that was about all we talked about at personnel. [snorts] All right. Move on to park and wreck. >> Park and wreck met last night. Uh we talked about doing some mosquito

18
00:04:42.880 --> 00:04:58.320
treatment at the city park. They're pretty thick out by where they play disc golf. Um, we're going to give it a try and and see how it goes, if it makes a difference. Uh, we talked about the new Sand Hill Park. We're looking to get the site work started out there and we're

19
00:04:58.320 --> 00:05:13.600
going to be looking at different play equipment ideas. And the horse trails out at the city park. They're not really being maintained by the horse rider groups anymore. That number has dwindled. So, we're gonna gather more information and

20
00:05:13.600 --> 00:05:30.160
see what we want to do with that. That's about it. >> All right. Any questions for Robin on parks and wreck? All right. Move on to EDA then. >> Excuse [cough and clears throat] me. EDA met Monday, July 13th. We talked about

21
00:05:30.160 --> 00:05:46.000
uh property at Liberty and Highway 10. There's been some interest in it. The mayor has talked with that interested party and they are still working on getting their thoughts together on what they want to do with that. Uh the housing study is still not final, but

22
00:05:46.000 --> 00:06:00.880
it's coming along. They hope to see it in the next 30 days. And a market update. There were 29 homes for sale in our zip code um last month, which is up quite a bit. >> Yeah, >> that's all I've got.

23
00:06:00.880 --> 00:06:17.199
>> All right, questions for Robin. All right, we will move on then to board committee and consultant report 7A. We have the supplemental. Oh, sorry. What did I miss? >> Fireboard. >> Oh, I didn't see fireboard on. >> I don't think we had it on there.

24
00:06:17.199 --> 00:06:34.720
>> Oh, yeah. Let's do fireboard. Sorry. Sorry about that, Chris. False start. Five yard penalty. [laughter] >> You can still start you start rotation early if you do a delayed uh call here. >> Sorry, my fault. Forgot about fireboard. Sorry about that. Um so fireboard uh

25
00:06:34.720 --> 00:06:51.039
yesterday was all fire all the time. So um so we uh so we met yesterday at 5:30. Uh we of course discussed the budget which was approved uh which we'll talk about at the next for the special meeting. Um so we had gone through the budget gone

26
00:06:51.039 --> 00:07:06.639
through the CIP again and um just finalized everything there and uh did motion to approve to forward that to the uh uh joint combined meeting there at 8:00. um brief discussion about uh about 4M funds and um just discussion at that

27
00:07:06.639 --> 00:07:23.120
point. Um the air handling unit uh the um that is in progress. And then um let's see chief's items. The yeah the roof the roof repairs were done. Um and the uh basically we're looking at the different ideas for the roof as to

28
00:07:23.120 --> 00:07:38.319
whether you know we didn't replace the whole roof. So we said okay there was a 10-year roughly um fix that was put on it. You know you could repair it and then it would get roughly 10 more years out of it. So, um, so that is done and then, um, looking to get quotes kind of

29
00:07:38.319 --> 00:07:52.560
more for the CIP to say what would a rough cost and then try and, um, put it out 10 years and make sure it's on the CIP for that. Uh, the computer is, uh, in the process of being ordered. Um, I think they have one picked out. I don't think they've actually uh, ordered it

30
00:07:52.560 --> 00:08:08.479
yet. Um, that's what I got there. And then should you write in the special meeting? Yes. So, special meeting uh of course last night uh we meet once a year as a joint body and we approved the well we had the report from the chief on the

31
00:08:08.479 --> 00:08:23.120
calls uh for the year and then we approved the uh proposed fire budget and the proposed uh CIP. Uh the budget uh was approved with all the um struggles that everybody's having in budgets this year. We still approved a budget with a

32
00:08:23.120 --> 00:08:40.880
2% only a 2% increase. So, uh happy for that. All right. Any questions for Rick on fire? All right. Now 7A supplemental letter of agreement with SE for wellhouse number

33
00:08:40.880 --> 00:08:58.000
one. Mr. Listen. >> Good evening, mayor and councel. Uh tonight I have an RCA and resolution 2667 for your consideration. It says for updates to uh the Riley Wellhouse or wellhouse number one. Uh it's located on Riley Avenue, ironically. And um it's on

34
00:08:58.000 --> 00:09:14.480
the same campus as Carly Johnson Park, so that that helps people realize where it is. Um the wellhouse number one, uh wells two and four uh go through that wellhouse, and it accounts for approximately 850 gallons of our per minute of our daily production for the

35
00:09:14.480 --> 00:09:30.240
city. Uh well four is our largest largest producing well. Um, so we've kind of been looking at this project for a couple years, but because of the inability to operate, especially during irrigation season without well for timing has been kind of a something

36
00:09:30.240 --> 00:09:47.279
we've been trying to wrap our heads around. Um, so the wellhouse was built in 1976, putting most of the equipment in it at the 50-year range. Uh we worked with SE uh to get this SLA that would outline uh

37
00:09:47.279 --> 00:10:02.480
the design work that's needed um so we can get plans and specifications that we could take out for bid when the timing is right for the city. Uh the project would address aging process equipment, electrical controls, HVAC, uh the building systems to improve the

38
00:10:02.480 --> 00:10:19.279
reliability, maintainability and safety and long-term operational performance of that wellhouse. uh the bidding assistance and project management if the design work is approved tonight would come at a later date when we're ready to to move forward with that as a city. Again, timing is kind of critical

39
00:10:19.279 --> 00:10:35.120
because we just can't be without this wellhouse in the summer. So, uh the idea would be if we get the design work done, we have those plans and specs ready and then as things work out well, we can move into the next phase as needed. Uh we did discuss this uh project with public works and it was discussed with

40
00:10:35.120 --> 00:10:50.800
the council at an executive session. Uh the costs for uh this work would be in our water CIP. Um we kind of planned for that already. And so tonight I'd be looking for a motion and a second to approve resolution 2667

41
00:10:50.800 --> 00:11:07.000
which is a resolution authorizing staff to accept and execute a supplemental letter of agreement with for design work for the wellhouse number one update. And with that I can stand for questions. All right. Any questions?

42
00:11:07.519 --> 00:11:23.760
That's something we think we could get back by would it potentially this fall would that assuming you take it off in a buffer season. So >> yep it'd be something we would try to coordinate with our well house or our water treatment project and kind of see how those can align. Um yeah the the I

43
00:11:23.760 --> 00:11:38.800
know engineering talked about kind of the biggest factor would be once we decide to move forward with the project getting some of the supplies and things for the project might be the longest runway. So again, that's where that timing thing is critical. So we'll [clears throat] if it's approved, we'll

44
00:11:38.800 --> 00:11:54.320
get our design work done so we kind of have that ready and then we can kind of as we need to pull that trigger and go. >> So and then just let her keep running for now. >> Yep. >> Mhm. >> Well, 50 years is pretty impressive. >> That was pretty good. Yeah, we've done I

45
00:11:54.320 --> 00:12:10.240
mean we've done a little work along the way to kind of keep her going, but >> it's a good run. We'll take it. >> All right. a picture of Gerald Ford in the there [laughter] >> it's in one of the blocks the time cap so we can open up and see what was here when it was built.

46
00:12:10.240 --> 00:12:26.880
>> Yeah. The 300 residents of Becker. [laughter] I'm very happy that this well. >> All right. >> I make a motion we approve resolution 2667 uh supplemental agreement with for wellhouse one design. All

47
00:12:26.880 --> 00:12:42.399
>> right. We have a motion from Mike. Do we have a second? >> I'll second. Robin seconds. Is there any further discussion? Hearing none. All in favor, please state I. I. >> Anyone opposed, state no. That motion carries. >> Thank you. >> Thank you, Chris. Good luck with that project. >> Thank you.

48
00:12:42.399 --> 00:12:57.839
>> All right. Next up, we have the Sherburn County ERU, JPA, Chief Lindloom. >> Thank you, Mayor and Council. Uh the Sherurn County Sheriff's Office operates a emergency response unit, the ERU unit.

49
00:12:57.839 --> 00:13:14.800
And as part of that, um, it's a kind of a select group of people who have additional training in entries and force combat and things like that that, um, are utilized in situations where, um, maybe there's a concern for, uh, for weapons, um, or higher stakes

50
00:13:14.800 --> 00:13:30.560
situations. Some people might think of like a SWAT team. Essentially, that's what they are. They just call themselves the emergency response unit. Um, we have utilized this emergency response unit occasionally within the Becker Police Department, but it's always been uh staffed by the sheriff's office. Um, the

51
00:13:30.560 --> 00:13:45.839
sheriff's office approached us about um wanting to potentially open that up and allow for officers from the Becker Police Department to apply to join the emergency response unit. And so uh before you tonight for uh resolution

52
00:13:45.839 --> 00:14:03.760
2664 would be a joint powers agreement with the sheriff's office for that emergency response unit. Effectively what it would allow is for uh members of the Becker Police Department to apply for positions on the team. Uh there is a very extensive uh testing process that

53
00:14:03.760 --> 00:14:20.000
requires a lot of physical testing, firearms training. Um it includes an interview and then um ultimately it will come down to myself and the commander of the ERU team if an individual should be selected to be a part of the team. Um if

54
00:14:20.000 --> 00:14:34.880
selected and we had a member on the team, that member would be um under the command of the Sherburn County Emergency Response Unit when out on a detail. They run on a standard operating procedure. um they would be employed by the Becker

55
00:14:34.880 --> 00:14:50.560
Police Department and um paid by the police department in the city. All insurance and things like that would carry over for their employment here and then any costs incurred through overtime and things like that for callouts would be would be covered by us. Um there is some additional training requirements

56
00:14:50.560 --> 00:15:06.880
that would be required. Uh we would use our scheduling system to schedule um those trainings in with their normal schedule. So we wouldn't really incur much of a cost there. However, there will be a benefit to the department and the city to have um members on that uh team because they're receiving a lot of

57
00:15:06.880 --> 00:15:22.079
um extra training, a lot of extra knowledge and tactics and operations that then they can bring back to the rest of the officers and team and uh in turn have available to us for calls that maybe wouldn't reach the threshold of an emergency response unit um response. So,

58
00:15:22.079 --> 00:15:37.760
uh, that being said, um, looking for a motion to approve, uh, us entering into that joint powers agreement with the Sherman County Sheriff's Office for the ERU team. >> Is that going to take officers off

59
00:15:37.760 --> 00:15:55.440
your rotation as far as being on patrol? >> So, only so training days potentially could have an impact on a patrol day if it's scheduled. Um the if they're off duty um and there's a call out then they could respond. If they're on duty and we

60
00:15:55.440 --> 00:16:11.680
have road coverage then they could respond to an on if they were on duty they could respond to assist in that manner. Wouldn't ever put us in a position where we didn't have the road covered or we weren't at minimum staffing to allow them to go. >> So kind of like an on call firefighter.

61
00:16:11.680 --> 00:16:27.279
If they're available and they are are able to go, they can. If not, then they wouldn't be able to. >> And potentially we would have to pay potentially overtime. >> Yep. So there if they get a call out on a on a day off um and they are on a

62
00:16:27.279 --> 00:16:43.360
scene for a few hours um then that would be something that we would pay the the the wages for if they're out on that. Yes. >> So they're not paid at all by the response group. >> Correct. Yep. The emergency response unit wouldn't wouldn't provide any any

63
00:16:43.360 --> 00:17:00.320
pay there. So the benefit to to us obviously is having that that that additional training for some of our officers, that knowledge and things like that that they can bring back here and then we have somebody with a lot of that experience able to be on staff here. >> They also have to be selected for that.

64
00:17:00.320 --> 00:17:15.280
>> Yes. And that is a very important part of this. The the selection process is very extensive. So um at this point in time the initial um this is the first time this has happened. Um this uh also is being done with Big Lake as well. So

65
00:17:15.280 --> 00:17:31.360
they uh have signed the joint powers agreement as well. And so to start they were going to offer one position to to both of our agencies if we had somebody that wanted to to join um and then see how that works with adding the officer

66
00:17:31.360 --> 00:17:46.960
from that agency. And then there's a potential that as we go we could you know they could open it up for for other officers as well depending on what our needs are and their needs are as well. So, >> and if this doesn't work out for you, is there do you have an easy out or?

67
00:17:46.960 --> 00:18:02.640
>> Yep. The the JPA says we can withdraw at any time. >> Okay. >> Yep. And I do I'll I'll make a note to you. Um so, this is obviously too dependent on people wanting to be a part of that. >> That's what I was hearing. >> So, um we when this process kind of got started and we were working through

68
00:18:02.640 --> 00:18:18.400
this, we we did put out to our team, hey, if if there's an interest here, this is an opportunity. So, we have some interested people that right now wasn't the right time. So, this they they're in the process right now of starting a um a testing procedure for the ERU team. We

69
00:18:18.400 --> 00:18:33.360
don't have anybody from Becker right now who is ready to step into that role. So, effectively right now this will be uh a joint powers agreement, but we actually won't have anybody from the Becker PD on the ERU in 2026 for sure. So J [snorts]

70
00:18:33.360 --> 00:18:49.840
>> we uh at police committee we um had we had asked how many times obviously you never know but how many times historically uh the ERU gets called out. Can do you remember that? >> Yeah, I think it was I think they average seven of actual call outs. I think it was it was under 10 of of call

71
00:18:49.840 --> 00:19:05.039
outs. It does vary. They said it es and flows. So some years or some months they'll go three four months without callout and then they'll have three in a month. Um, so that that does vary, but it's not usually a a huge time commitment. Again, it's it's reserved

72
00:19:05.039 --> 00:19:23.120
for those isolated incidents where they just need that extra that extra help. So, >> technology-wise, [clears throat] equipment wise, do we use stuff similar to the sheriff's office? >> No. And so, that Thanks for bringing up that point. So, the the cost for the

73
00:19:23.120 --> 00:19:38.960
overtime and things like that is kind of our ongoing cost. the upfitting portion, there is a fee, a cost, and it' be right around $11,000. Um, if we had somebody that was selected, we do have funds in our CIP for tools and equipment that would cover that. Um, but that is because they do have some specialized

74
00:19:38.960 --> 00:19:54.559
equipment um that would need to get purchased to meet their standards. So, that officer would be assigned um that equipment. Any transferable equipment we could transfer if somebody wanted to leave the ERU and join later, but there would be some costs there for some of the extra vests and things like that.

75
00:19:54.559 --> 00:20:10.160
Um, interestingly enough, my next agenda item will cover the that portion of it because, um, the rifle that would need to get purchased for somebody for you, um, if approved later, that would meet their standards because it comes into what the norm is for them, too. So there

76
00:20:10.160 --> 00:20:25.360
would be a little bit there that we could could have. But in general, like I said, that that onboarding is a little bit more of a cost to us, but um again, the amount of the training and um skills and tactical abilities that that person's going to carry with them and

77
00:20:25.360 --> 00:20:43.200
bring back and have on the streets here every day um is is pretty important as well. >> Yeah, for sure. And they're not charging us for the training? >> Nope. >> That's just part >> uh there would be an annual um I think it was pretty minimal. I think it was uh u I think like $3,000 or $2,000 annually

78
00:20:43.200 --> 00:20:58.640
and that covered like some of the ammunition. Um they do an annual training up at Ripley. They cover some cost with that. So >> Yep. >> overall the cost of training for that and the amount of training they get is uh far less expensive than a day of training for most of our trainings that

79
00:20:58.640 --> 00:21:14.480
we go to. So >> for sure. >> Yep. >> Well, I just think this is great. I think it's a huge step forward in county and local agency uh relations. So, I'm super happy to see this happening. I think that's wonderful.

80
00:21:14.480 --> 00:21:30.880
Any other questions for Chief? If not, would someone like to offer a motion on resolution 2664? >> I'll make that motion. >> We have a motion by Robin. >> I'll second. [clears throat] >> We have a second by Mike. Any further discussion?

81
00:21:30.880 --> 00:21:45.440
>> Hearing none. All in favor, please state I. >> I. >> Anyone opposed, state no. >> That motion carries. >> All right. Thank you very much, Chief. And you're up again for the rifles. >> I am. Uh resolution 2665 uh presenting

82
00:21:45.440 --> 00:22:01.760
um is for a patrol rifle update for the department. Our current patrol rifle cons uh consists of four fully operational rifles that are in our patrol vehicles. Um we have a total of six patrol vehicles. Um, so we were looking at trying to get all of our

83
00:22:01.760 --> 00:22:18.640
vehicles upfitted with rifles. Um, there was a spare. However, we've had consistent problems with the rifles that we've had for these um, many years. Uh, including breaking stocks, uh, malfunctioning when we're doing our rifle training. Um, we've had a lot of problems with the optics um, like the

84
00:22:18.640 --> 00:22:34.320
sights that we selected for them back when we purchased them um, to include falling off during training. So, we kind of just reached the point at which um if we're going to add rifles, they all need to be the same. So, when we set up a squad car and our guys and gals go to work, every car, every piece of

85
00:22:34.320 --> 00:22:50.880
equipment in there is the same. Um and it didn't make a lot of sense to do like for like when we've been having so many problems. So, uh we took a look at at the rifles and um staff kind of thought that the a full refresh would would make more sense. We'd have reliable equipment

86
00:22:50.880 --> 00:23:06.559
then that we could have for many many years um to come. Uh that being said, we reached out to some other agencies. We did some research with local agencies. Um we pe uh pinned some of our like the chief's association and things looking at what type of rifle is is common place

87
00:23:06.559 --> 00:23:23.679
and some good vendors. Ultimately got a lot of referrals um for Alex Pro firearms um in Alexandria. >> Supply a lot of law enforcement in Minnesota. Uh key for them was their customer service. So, one of the things we talked about at police committee was uh we had looked at having a spare rifle

88
00:23:23.679 --> 00:23:39.840
um uh just to have. But Alex Pro um is really good customer service. So, if there's any type of failure or something that happens, even situations where if an officer would have like an officer involved shooting um and that gun needs to get taken as evidence, um they will

89
00:23:39.840 --> 00:23:56.720
come down and they'll replace that until we can get it back. So, um that was really nice to see. Right now, we don't have any type of warranty or customer service um with our rifles that we have now. Um they would be a 5.56 caliber um rifle. Nothing too crazy that um like

90
00:23:56.720 --> 00:24:11.600
difference. It's a rifle. It does the same thing. The the current uh ammunition that we have, magazines would be um able to go between them. It's got a shorter barrel. Very common now um to have that. A lot of our entries and things like that where we're using

91
00:24:11.600 --> 00:24:26.159
rifles are in residences, hallways, and things like that. So, having the shorter barrel is is more beneficial. Also, ease of removing from the squad car. Ultimately, uh Alexandria or Alex Pro Firearms was able to supply us with six

92
00:24:26.159 --> 00:24:42.640
rifles. Uh the cost was $7,200. Um and then we had also reached out to them to get the items on the rifles that we have. Um their quote was a little bit higher. So, uh, we reached out to Keysler's Police Supply. That's who we purchased our Glock, um, handguns from a

93
00:24:42.640 --> 00:24:58.000
few years ago when we did our big handgun upgrade. They've been really good to deal with. And one of the nice things about Keyslers is they've always been really good about doing buybacks. So, um, we have our current rifles. We also have our old old rifles from before

94
00:24:58.000 --> 00:25:14.640
our last rifle upgrade that have just been um, collecting dust in uh, in the um, evidence room. And then we also have a bunch of old shotguns that um were identified as less lethal um like bean bag round shotguns. It's not something that the department utilized or has

95
00:25:14.640 --> 00:25:30.080
utilized and doesn't intend to. Um so they were willing to kind of we took that and said, "Hey, we've got all of this. Would you be willing to buy it back from us essentially?" And they um agreed to that and we're willing to uh do a buyback of all of our old

96
00:25:30.080 --> 00:25:46.400
equipment. Um, and therefore, uh, Keyslers would be able to supply us, uh, with the accessories for the the all six of the rifles. Um, total for that was 6,700. Um, and then they offered us the $4,270 for tradein. Um, which brings all of our

97
00:25:46.400 --> 00:26:04.159
accessories to about4 $2,400, which was uh, pretty nice. Uh, we we got a a really good deal from them um on the buyback, much more than we thought we would for some of the rifles. So, um, all in all, we're looking at a cost to replace all of our department rifles and accessories at about $9,600.

98
00:26:04.159 --> 00:26:21.120
Um, we do have funds available in our CIP tools and equipment line item for that uh this year that we would be able to utilize. And then again, um, in my world who maintains the evidence room, I'm going to have some more space because I'm not going to have a bunch of

99
00:26:21.120 --> 00:26:37.919
old stuff, um, occupying space in there. So that's >> getting rid of the musketss. >> But yeah, the bayonet attachments that are on the end of some of those. Nice. >> Yep. Nope. [laughter] >> So, a little bit of house cleaning and uh these would be like I said, I feel like the the reliability here was the

100
00:26:37.919 --> 00:26:53.520
key. And it uh it was frustrating at a lot of our trainings trying to do our rifle qualification and have things break and we just kind of can't have that. So, um, we anticipate that these, uh, as long as they're maintained, which we have a a great firearms, uh, coupled

101
00:26:53.520 --> 00:27:10.240
firearms, uh, instructors and armorers who clean them and take care of them, that, um, we'll get many, many years out of them. So, so my only question, Chief, would be, was the price difference between APF and Keieslers enough? Because it it seems like you really like

102
00:27:10.240 --> 00:27:25.760
APF's, you know, warranty work and all those things. Now it's kind of like you're putting two companies onto that gun and if we had to ship them for work or anything, was it a >> significant enough amount of funds to

103
00:27:25.760 --> 00:27:42.159
>> Yeah, it was several thousand difference um in the markup. Um I will say so the the accessories from Keyslers aren't aren't a specific it's not their company. So they're just outsourcing. Uh, so the the the optics for instance,

104
00:27:42.159 --> 00:27:57.520
they're a Vortex product. APF and Keysler's both sold them. >> Got it. >> APF's markup on them, I think probably just a smaller company. Um, Yep. >> was much higher. Got it. >> And I had reached out to uh to the individual companies as well to kind of

105
00:27:57.520 --> 00:28:14.799
say, hey, law enforcement agency purchase. Um, and they were right in line with what Keysers had quoted us. But obviously the benefit here is Keyslers will do the buyback. Yep. So we would have got similar prices if we had gone out and bought them individually. It just was way easier going through key >> list. So it's not proprietary to

106
00:28:14.799 --> 00:28:34.320
>> not. All right. Anybody else have any questions for chief on the rifle purchase? >> If not, we would entertain a motion for resolution 2665 for the rifle purchase, the buyback, and all the goodies.

107
00:28:34.320 --> 00:28:49.440
I'll make a motion to approve resolution 2665. >> Second. >> We have a motion by Rick, second by Mike. Is there any further discussion? Hearing none. All in favor, please state I. I. >> Anyone oppose, state no. >> The motion carries. >> Okay. Thank you for your time.

108
00:28:49.440 --> 00:29:05.039
>> Thank you. All right. Miss Thomas is here for the program coordinator restructuring at Becker Community Center. Welcome. >> Thank you. Good evening.

109
00:29:05.039 --> 00:29:21.039
Um, so I'm re I'm requesting the approval to restructure the Becker Community Center's current coordinator model um from three part-time program coordinator positions to two full-time program coordinator positions. Uh we currently have a vacancy in the

110
00:29:21.039 --> 00:29:36.240
adventure zone program coordinator position which gave me the opportunity to evaluate um and consider where I wanted to go with that. um using this as a good opportunity to pretend potentially restructure. So um upon

111
00:29:36.240 --> 00:29:51.520
review, my recommendation is to eliminate that vacant position and redistribute responsibilities and increase the two remaining coordinators from part-time to full-time. Uh so if you're not familiar, we have currently we have an aquatics coordinator, an adventures zone coordinator, and a

112
00:29:51.520 --> 00:30:08.240
fitness and special events coordinator. Uh these are all part-time positions. So I again would move to consolidate those into two full-time positions. One of the reasons being that I after evaluating uh I learned I looked further

113
00:30:08.240 --> 00:30:25.440
into it and saw that aquatics and adventure zone that would be the primary consolidation there. Um those are they complement each other very well. When aquatics is slow in the summertime because that's our slowest time of year. the adventure zone program ramps up with

114
00:30:25.440 --> 00:30:41.520
the kids being there all day. When adventures zone slows down in the school year, aquatics gets a little busier. So, it complements each other as far as the workload. It's a very seasonal position. Um, beyond that, I think the PR it would promote [snorts]

115
00:30:41.520 --> 00:30:57.840
efficiency meaning that rather than having three separate part-time positions that all have to communicate and parents sometimes have to go between multiple parties, they can now we have two people who will collaborate, provide coverage for one another and share responsibilities based on what the

116
00:30:57.840 --> 00:31:15.039
facility needs at the time. Um, one of the things I would like to do with the increase in hours for the special events and fitness program coordinator is add more youth programming to her plate with with special events and again youth fitness programming. Uh, after doing

117
00:31:15.039 --> 00:31:32.399
some data, we learned that 30 three% of our membership is people ages 0 to 18. So with a third of our membership, we should probably be doing a little bit more youth programming to accommodate those members. Um, with this transition, I would also look

118
00:31:32.399 --> 00:31:49.200
to develop strong lead positions. We already have that position, but really work on growing our leads so that we can help the coordinator in that role uh be more admin related. They're helping with the billing. They're communicating to parents. They're handling disciplinary

119
00:31:49.200 --> 00:32:06.000
action and less of the rotating between activities and and doing snack time and things like that. So, we would improve our lead structure. Again, that wouldn't be anything new. That would just be part of what we're already doing. But I [snorts] also believe that this would be a good improvement for recruitment and

120
00:32:06.000 --> 00:32:22.559
retention because two full-time a full-time position tends to be a lot more attractive to uh the employment market than a part-time position. And we've heard that over the hiring process. I was a part of this hiring process for the adventure zone program coordinator last year. And that was one of the biggest things for feedback with

121
00:32:22.559 --> 00:32:38.720
not getting highlevel candidates to even apply because of the the position being a part-time non-benefit eligible position. And we were very fortunate to end [clears throat] up with the candidate we did have for the year. Um and then so one of the nicest features

122
00:32:38.720 --> 00:32:55.760
here is also the restructure is financially beneficial. So going into if we if this is approved for the remainder of this budget cycle 2026, we're looking at 9,794 in savings for the remainder of the

123
00:32:55.760 --> 00:33:14.559
year. Looking ahead to the 2027 budget with this restructure from three part-time coordinators to two full-time coordinators, we're looking at a savings of $24,797. So either way, we're looking at a savings with this restructure. There's

124
00:33:14.559 --> 00:33:29.919
efficiencies, um, more consistent leadership in our in our department and al of course making it a more attractive position down the road if we ever do have to rehire. So do we have any questions?

125
00:33:29.919 --> 00:33:49.519
>> Have you taken into consideration the cost of benefits? >> Yes, that is included in that calculation. Are you not increasing the salary of the two people that you're keeping >> their their step they're still going to be on the same step the same scale um

126
00:33:49.519 --> 00:34:06.240
they're just getting an eight extra hours a week so their wages wouldn't increase other than getting more additional hours >> which should wash with the two positions versus three but the cost of the I'm

127
00:34:06.240 --> 00:34:23.520
concerned about the cost of benefits Mhm. >> And what that's going to do to your budget. >> Well, yeah, we discussed that at personnel and it the the 25,000 I'm rounding up a little bit cuz that sounds really good. Um that is inclusive of of all benefit costs as well because

128
00:34:23.520 --> 00:34:39.839
the three positions, none of them were benefit eligible, >> right? That's what I'm getting at. >> So even with that, we're going to be saving this. If it's just wages alone, it looks like it's a $42,000 savings, but then when you factor benefits in, it's $25,000

129
00:34:39.839 --> 00:34:56.000
savings. >> Yeah, it seems kind of too good to be true when we started, too. >> That's why I'm questioning it. >> Yeah. No, I know what you're saying, but yeah, when we looked at it, it's like, wow, this that's significant. >> Yep. And we worked with with finance on that and calculating those numbers and

130
00:34:56.000 --> 00:35:12.560
and pulling the accurate information. And so, again, if this is approved, you'll >> that's using our step system. >> Yes. Yep. >> Yep. >> So, you'll see if this is approved, you may see some of this in the in the budget meeting as well. >> Okay.

131
00:35:12.560 --> 00:35:29.680
>> Both the current employees are interested in staying and going part or full-time. >> Yes, they're very excited. >> Oh, good. >> Yes. Very relieved and very excited. >> Good. >> Excuse us for the shock. We just don't get a lot of [clears throat] >> everything is on the positive side of

132
00:35:29.680 --> 00:35:45.520
the procon chart. So, you had me at saving $25,000. So, >> great. >> Awesome work. Thank you for your creativity. >> Yep. >> And thank you for providing all that detail, too, cuz that's cuz of course I'm reading through I'm going, "Okay, what's what's the what's the math wash out?" I was like, "Oh, look at that.

133
00:35:45.520 --> 00:36:02.400
There's a chart." So those >> two. [laughter] >> So if there's no more questions, I would um request a motion to approve resolution 2668 to restructure the Becker Community Center program coordinator roles from part-time to full-time.

134
00:36:02.400 --> 00:36:17.040
>> All right. Anybody want to make that motion? >> I'll make that motion. >> Motion by Robin. Do we have a second? >> I'll second. >> Second by Rick. Is there any further discuss discussion or questions? Hearing none. All in favor, please state I. >> I.

135
00:36:17.040 --> 00:36:34.800
>> Anyone opposed, state no. Motion carry. Thank you very much. All right, Mr. Kudson's up with the SLA with SE for the WTPD. [laughter]

136
00:36:34.800 --> 00:36:50.560
Well, I'm hoping those uh warm fuzzies you had with that cost savings carry over into the uh investment that we're looking at in a water treatment plant. Um, good evening. [laughter] This isn't a new topic. It's a kind of an uncomfortable topic, but it's

137
00:36:50.560 --> 00:37:06.480
something we've been wrestling with for several decades right now. I know the last couple of years, we really ramped it up and having uh conversations at work sessions and uh with staff. Uh water is has been top of mind for for many many years. [cough] So, uh, in 2019, uh, the council

138
00:37:06.480 --> 00:37:22.800
approved land purchase and, uh, we used some some, u direct bonding to put in wells seven and 8 on the former Olsson property out on K County Road 24. After we got [clears throat] those wells into production, the water quality wasn't what we anticipated it to be and uh a

139
00:37:22.800 --> 00:37:38.560
surprise came along in the in the form of CO2 in there as well, which pulls some of the uh um the sediment in solution uh out uh kind of gave us a little bit of a tinge and also the manganese quantities in the uh those wells was a little bit higher as well.

140
00:37:38.560 --> 00:37:55.280
when we tried to blend that water together, uh it was a little bit cloudy, uh it was a little bit orange, and we've we received immediate feedback from our citizens, uh what's going on. So, [clears throat] we've taken those those wells offline. Uh we've not used them, and we've looked for solutions the past

141
00:37:55.280 --> 00:38:11.359
two and a half to three years. Uh we've studied everywhere we can look for water. We've done test uh uh drills everywhere. We've talked to countless farmers. Uh we've done uh residential samples in in the township as well. Um most recently after our last work

142
00:38:11.359 --> 00:38:26.160
session, I I had a farmer reach out uh through a council member and uh we immediately went out there. They were going to vacate one of their irrigators. Uh we looked at that. We were concerned about uh nitrates and nitrates were uh registered at 10.6. MDH levels are are

143
00:38:26.160 --> 00:38:43.359
10 and and below. Anything five and above we have to monitor as well. So it's just not a viable option for us to treat that. Um, so we kind of pulled that one off the table. But, um, the process, like I said, we've we've talked to anyone that would listen and, uh, what we finally ended up at is with some

144
00:38:43.359 --> 00:38:59.599
reluctance was using well 7 and 8 for a site for a future water treatment plant. It's not new to the area. Big Lake is going through this right now. Monaceel is starting on their their water treatment plant as as well. Um, so what we're recommending tonight is for uh us

145
00:38:59.599 --> 00:39:16.160
to enter into an agreement with SE to do design work for a water treatment plant. Uh, the design work would get us to uh plan ready and bidding documents. They would carry us through should you want to go that way to uh to bid layout and that would be brought back to you likely

146
00:39:16.160 --> 00:39:33.520
in in uh February, March of next year to start construction at next year's time. So, obviously the financial burden that comes with this is is pretty extensive. Uh, Greg and and myself have met with with Mark and Lori to walk through the uh preliminary numbers. Uh, the SLA cost

147
00:39:33.520 --> 00:39:50.480
is is not to exceed uh 9 and $32,000, sorry, 942,500 uh for this first phase. those funds. Uh what we talked about was taking money out of the uh reserves and the water fund as well as some of the PIFA

148
00:39:50.480 --> 00:40:05.920
settlement money that we've got uh to pursue this. Uh in doing so, uh if you should move forward tonight, we'll continue to work on long-term funding as we get through the phases of of uh going out for bid, selecting a contractor, going through construction. It's likely

149
00:40:05.920 --> 00:40:22.480
a 24-month process from start to finish uh to get it there. A lot of levers that we would need to pull. This is obviously the first big one. so we can move forward with it. And uh the 942,000 isn't all at once, right? It'd be phased as they go through 30-day payments just like all the other work that we do with

150
00:40:22.480 --> 00:40:38.240
them. Um so it wouldn't it'll be a slow bleed as we come through the the payment on it. But I think it's a crit critical critical next step for us to secure our our water future. So and with that, there's a lot of information out there. Uh like I said, we've had several in-depth meetings on this, but I can

151
00:40:38.240 --> 00:40:54.000
stand for any questions if you have them. Any questions for Phil? [clears throat] >> So, if we built nothing, added nothing, currently we would still need this. >> We've been in a water deficit since I was on council when I started in 2002.

152
00:40:54.000 --> 00:41:09.599
Um, and nothing's changed. We've we've grown. We've added businesses. We've added rooftops and we've not not added to our our water supply system. So, yes, we've been running deficit. Uh the water guys, uh they this time of year, that last uh 7-day stretch, 10day stretch,

153
00:41:09.599 --> 00:41:25.200
>> that's stressful for these guys cuz they're just like we're we're one fail away from having a watering ban of zero exterior water use, no lawn watering, things like that. So, yes, we've needed this for for many, many years. And uh I

154
00:41:25.200 --> 00:41:41.040
feel good. Staff has done a great job of trying to turn over every rock and find any opportunity. Uh we've been very fortunate. Um, you could say we're unfortunate because we've never had to treat our water. Um, 15 years ago, this would have been a treat a cheaper alternative, but we've been fortunate to

155
00:41:41.040 --> 00:41:55.680
have decent water quantity. We just don't have enough of it. Yep. All right. Any further questions? If not, we're looking for a resolution or a motion on resolution 2666 for the S

156
00:41:55.680 --> 00:42:11.839
SOA with for our water treatment plant. I'll make the motion to approve that resolution. >> Have a motion from Rick. Do we have a second? >> Second. >> Robin seconds. Do we have any further discussion? I would just say thank you. I know

157
00:42:11.839 --> 00:42:27.599
you've put a lot of work into this and uh all the water staff and public works staff and um I went back and looked at the study that was presented and it's thorough. It explored every option. Um, so I'm very

158
00:42:27.599 --> 00:42:43.200
comfortable and just want to thank staff for all that work. >> Yeah, you bet. I mean, we appreciate it and and it's a full group effort. I mean, budget and finance, we we met six weeks ago when we first started talking this. Their wheels are already turning on on all the opportunities. I know we're going to work through budget and finance as far as long-term planning and

159
00:42:43.200 --> 00:42:59.520
how that's going to work out. So, we'll we'll have uh future work sessions as well as the finance team continues to dive into what the best options are for the long-term impact of the of the plant. And like you said, I mean, we've been trying test walls for years. I mean, it's not like we just went, "Oh,

160
00:42:59.520 --> 00:43:15.440
let's just do this." I mean, we've we've been trying. >> Yeah. Our our primary engineer, Chris Larson, who's working with us from uh said Becker has invested more in trying to find water than any community he's ever worked with. So, uh it's not for for lack of trying. So, again, I thank

161
00:43:15.440 --> 00:43:30.640
you for recognizing that. We appreciate all the things the staff is doing, but uh this is a I think our our most confident next step. It's a big hurdle, but it it's going to give us results. You know, we we're feeling a little bit worn out and defeated because we've just not been able to uh land anything, but

162
00:43:30.640 --> 00:43:44.960
this is going to give us what we need. So, >> awesome. Any further discussion? If not, we'll call a question on resolution 2666. All in favor, please state I. I. >> Anyone opposed, state no. My motion

163
00:43:44.960 --> 00:44:01.119
carries. Thank you. Thank you very much. Uh then it looks like you're up again, Mr. Mr. Kudson for uh the Edgewood Street improvements. >> Yes. Uh we've started the project. We've got a change order request coming through. It's for a water connection. Uh it was in a mission when we first

164
00:44:01.119 --> 00:44:18.160
started talking through it. We when when the Luen u infrastructure improvement, the grant was was offered. Um we were looking at potentially uh capturing a sanitary line uh under Edgewood for future developments on on a farm field over there. um the cost of that and just

165
00:44:18.160 --> 00:44:34.400
looking at that and do we need a lift station and and all of that just didn't seem feasible for us to do something like that. Um we didn't pursue looping that water system. Currently the the the uh water infrastructure is fed from the I'll call it the southeast portion Luan

166
00:44:34.400 --> 00:44:51.280
current Luan drive and feeds upward. Uh what we would recommend uh and again kudos to our our water team for seeing the plans and calling it out. uh if we can loop [clears throat] the system, anytime we can loop the system and backflow if we need to, it's a benefit for us. So the water man right now runs on the north side of of of Edgewood. And

167
00:44:51.280 --> 00:45:06.800
for us to do this work, this change order would call out that we would we would take that water line, tie into it, and bring it basically to the south edge of the rightway of of Edgewood Street right now. So if Lann Street does get improved, which we anticipated it will,

168
00:45:06.800 --> 00:45:22.960
we'll be ready to tie into that. So then we can loop all of that development on Luan Drive. um better service long term. If you've got any issues, you can gate it off one side and fill from the other side. So, it's it's the right thing to do. It was just an omission as we we got to together on the uh design originally.

169
00:45:22.960 --> 00:45:37.920
So, with that tonight, I'm looking for a movement on on change order number one in the amount of $25,430. Uh we did get this from our our contractor did vet this through because of the quantity pricing. It's in line with what we would have would have done

170
00:45:37.920 --> 00:45:54.361
originally. Um, so feel comfortable with the change order even though I don't like change orders, but >> makes sense to build in the redundancy. And Brandy paid for it, >> so we we appreciate that. >> She won't give up her funds that easy. So, [laughter]

171
00:45:55.760 --> 00:46:11.599
>> all right. So, we're just looking for a motion on change order number one for Edgewood Street to loop the water man. >> I'll make that a motion. >> Okay. We have a motion from Mike. Do we have a second? >> Second. >> Second from Robin. Is there any further

172
00:46:11.599 --> 00:46:27.359
discussion? Hearing none. All in favor, please state I. >> I. >> Anyone opposed, state no. >> The motion carries. >> Thank you. [clears throat] >> Uh do you know how long will that close that end? >> That should be a day project. >> Okay. >> Yeah, they'll be able to shut that down.

173
00:46:27.359 --> 00:46:43.119
We're going to try and a meeting with Greg this morning. We're going to try and isolate some of these things. Uh we should find out where are we? Tuesday by Thursday at the uh east end of of of Edgewood with the the storm sewer coming in. If they get their shipment where it's scheduled for Thursday, uh they'll

174
00:46:43.119 --> 00:46:58.079
start doing work either the end of this week or early next week. So that'll kind of bottle up what we're dealing there. We'll try and get better messaging out even if we got to put some door knocks out on like Woodland Court. They're going to be isolated as we come through with this. We'll work with Shepherd of Grace or those neighborhoods. U but just

175
00:46:58.079 --> 00:47:14.079
encourage everybody. We'll Tony does a really good job of taking any information we can and posting it. I we'll use Facebook and and our website to try and direct everybody there because it's very fluid. So, we'll try and keep those things going. But if anybody has any questions, they can call city hall. We'll we'll work with them. But this shouldn't shut it down too

176
00:47:14.079 --> 00:47:30.800
much. The uh the storm collection is going to make a mess of Edgewood. So, anybody who lives in um um Nature's Edge, >> your best bet, get to Brenda. Just cross over Brenda and and keep it moving and stay off of Edgewood if you can. So, >> perfect. Thanks.

177
00:47:30.800 --> 00:47:46.880
>> Awesome. Thank you. All right, Mr. Larude is up with the consent agenda. >> Mayor Cobinger, city council members, items for review, approval, or adoption on tonight's consent agenda include the hiring and termination report authorized the Tuesday, July 21st, 2026 payment of

178
00:47:46.880 --> 00:48:05.920
claims as presented. The claims listing has been provided to the city council as a separate document and is available upon request for public view at city hall. The total claims are $389,312.14. authorized electronic transactions as presented in the May 31st, 2026 journal.

179
00:48:05.920 --> 00:48:21.839
The journal has been provided to the city council as a separate document and is available for public view at city hall upon request. Approve the minutes of the July 7th city council meeting. Approve the minutes of the July 14th budget workshop meeting. Approve pay number one in the amount of 320,00

180
00:48:21.839 --> 00:48:40.319
320,12324 to capital paving for the 2026 street improvement project. approve the update to the community development administrative technician job description and I'll be happy to answer any questions. >> All right. Any questions for Greg on the

181
00:48:40.319 --> 00:48:56.960
consent agenda? If not, would anybody like to make a motion to approved the to approve the consent agenda? I'll >> make the motion to approve the consent agenda as presented. >> Got a motion by Rick. Do we have a second? >> Second. >> Second by Robin. Is there any further

182
00:48:56.960 --> 00:49:12.079
discussion hearing? Hearing none. All in favor, please state I. >> I. >> Anyone opposed? State no. That motion carries. All right. Anybody else have anything for tonight?

183
00:49:12.079 --> 00:49:26.960
>> No, I do not. >> If not, we would entertain a motion to adjurnn. >> So moved. >> Have a motion by Robin and a a second. >> Second by Rick. All in favor of adjourning, please state I. >> Anyone opposed, state no.

184
00:49:26.960 --> 00:50:22.240
Meeting's adjourned at 5:49. We'll take a brief break and we'll come back to talk about the governmental funds preliminary budget. Thank you everybody. So I get to read your >> what?

185
00:50:22.240 --> 00:52:08.599
Oh >> What? But we have we're designing [laughter] >> okay Cool. >> Yes. >> Yeah. No, we haven't >> Lance,

186
00:52:12.880 --> 00:54:13.839
>> but but I but here's I You know, I didn't I don't know. >> He did look back. [clears throat] which is good. You guys won't watch. >> [laughter] >> No, no, I'm not. I just realized without

187
00:54:13.839 --> 00:54:29.760
>> Gary. I mean, Greg, [laughter] >> that's a little >> Did you see that letter? >> Which letter? >> I'll tell you later. >> Sure. >> All right. We're going to call the uh

188
00:54:29.760 --> 00:54:46.079
executive session of July 21st, 2026 to order. And we're going to start out with the governmental funds preliminary budget. Uh we did a special meeting last week for the CIP and now we're on to

189
00:54:46.079 --> 00:55:00.720
this fun stuff. So Lori, you're going to start us off. >> I'm going to start you out. >> All right. >> Here we go. All right. We're going to um start out by running through a couple of the assumptions. I think um if we go through those, it'll lay some of the groundwork, answer a few questions ahead

190
00:55:00.720 --> 00:55:16.880
of time. So um first of all I was want to thank all the budget managers. Um we are using the my viewpoint tool again for budget workflow. Um it works works really well for input and review. Um all that data that goes in there pulls down

191
00:55:16.880 --> 00:55:31.520
into the review formats that you're looking at. So um all that data has been reviewed all the way through Greg. Everything you're going to see tonight has um been through that level of review. So, um, thank you to everybody for your work in doing that, for all

192
00:55:31.520 --> 00:55:47.280
your feedback and, um, the process, um, works fairly well. So, I just want to thank the folks that have all that input. Um, a couple data points. Um what you'll see in the budgets tonight um we are using a wage input assumption of a

193
00:55:47.280 --> 00:56:02.880
3% increase plus any step and grade changes that would be scheduled for people um on our normal DBM ratings. Um couple data points. The consumer price index right now is at 3 and a half% for

194
00:56:02.880 --> 00:56:18.880
everything uh for all items through June of 26. So, we did just get that update and incorporate that into um this kind of just for a data point of of where things are at. Um we do have a compensation study in progress with

195
00:56:18.880 --> 00:56:35.200
Flity and Hood. Um we have had to make preliminary wage assumptions and so we put that 3% in there um because we won't have that data back in time to uh really get to the finish line if we don't put some put something in there. So, thanks

196
00:56:35.200 --> 00:56:51.359
to um budget and finance and uh other groups for kind of helping us kind of get to what where we wanted to start for wages. Um from a benefit standpoint, I think it's important to understand that when we budgeted um health care for 2026,

197
00:56:51.359 --> 00:57:08.000
we budgeted an assumption that healthc care was going to go up 8%. That was the cap that we had at the time that we put budgets together. Um initially um when we renewed our benefits we actually received a 10.8% decrease which

198
00:57:08.000 --> 00:57:25.280
relatively unheard of. We had gone out for bid. We had excellent um usage data. We were we are we were and are a very um attractive candidate for the groups who were bidding on our healthcare options. And so we ended up with a reduction.

199
00:57:25.280 --> 00:57:40.160
We did not at that time push all that reduction back into the budget. And so when you look tonight at how we're budgeting healthcare, it is going to look a little strange when you compare last year's budget to this year's budget because we didn't push all that detail

200
00:57:40.160 --> 00:57:57.760
back into all the budgets. So we are budgeting for um the premium cap that they quoted us when we accepted last year's reduction. That cap is a 15% increase. So, everybody's healthcare line is going to look a little odd because we did not push some of those

201
00:57:57.760 --> 00:58:15.520
details back into everybody's line items. So, um you'll see that. Um hopefully that helps to explain that. If we have if you have specific questions, we can certainly look at them in detail and respond. Um but that will look a little bit strange. Um, we also have

202
00:58:15.520 --> 00:58:32.640
projected assumptions on what plans we think people will choose based on what they have chosen for this year. That's another pretty big difference. We had some people who chose um to forego or wave coverage when we had originally assumed they would take a family plan.

203
00:58:32.640 --> 00:58:48.960
So for budgeting for this coming year, we've been a little bit stuck a little bit closer to um what we think people are going to choose consistent with what they have taken this year. So that also doesn't quite jive with budgeting a 15%

204
00:58:48.960 --> 00:59:05.520
increase in healthcare, but we are budgeting a 15% increase um in our premiums. Just kind of the way it lines up looks odd. Um overall we're also recommending um a 4% increase in other benefit costs. We haven't received any

205
00:59:05.520 --> 00:59:21.680
renewal information yet from our broker. It's too early in the process. So we're just having to make some assumptions about what's going to go in there. So um that is what is in there for that. Including um an increase also of 15%

206
00:59:21.680 --> 00:59:38.559
assumed for a Minnesota paid family medical. Again don't have any quotes back. don't know what's going to happen. Um, we know there is a cap on the state plan. Um, but the state also hasn't released their data on what's going to happen with their plan. So, we've tried

207
00:59:38.559 --> 00:59:55.359
to be conservative um and put in an increase for that as well. Um, other cost categories just to keep in mind um we do not have [snorts] um taxable market value data yet. So really we are

208
00:59:55.359 --> 01:00:11.760
only talking tonight about dollar value levy. So don't have any impacts on what that does to our tax rate yet. So we're just kind of um you know the county takes their time as they should and so does um the department of revenue um

209
01:00:11.760 --> 01:00:27.760
when they're evaluating the share co- plant. So those are items we just don't have data on yet and those will be a little further down the line. You'll see for interest earnings that we are planning less conservatively for 2026. Um interest rates and investment

210
01:00:27.760 --> 01:00:43.440
balances both are outpacing our 25 numbers and we really um even though we have a few big items that we know we're going to spend on. We don't see a huge decrease in our cash balances uh at

211
01:00:43.440 --> 01:01:00.480
least for the next 12 months. So, we're going to plan a little bit less conservatively, put some additional interest income in to all the budget funds that have cash. So, you'll see um stronger interest for the general fund, for EDA, and for golf because those

212
01:01:00.480 --> 01:01:16.880
three funds um carry uh cash balances, so they get interest allocated to them. And then we're not going to cover um water or sewer at all tonight, but just so you know, plenty of things going on in the background on those two budgets

213
01:01:16.880 --> 01:01:33.119
as well. So, especially on the industrial side, we have several meetings with LPI during the process to keep them informed and to kind of collaborate on where we want to land on a on a few things. So, um so those things are all happening as well.

214
01:01:33.119 --> 01:01:50.559
>> Any questions on the assumptions? >> Any questions for Lori? Y >> makes sense to me. [clears throat] >> All right, then I'm going to uh talk through the next page. We're going to be on page four. Um part of this will look

215
01:01:50.559 --> 01:02:06.160
familiar because part of it you saw last week when we talked about CIP planning. So those blue um tabs under capital improvement levy, we've already covered. We looked at those in a good level of detail. So tonight we're going to be looking at the general fund, the

216
01:02:06.160 --> 01:02:24.079
community center, and the EDA. Um golf um detailed budgets um will be presented on August 5th along with their CIP. So we're not going to cover them tonight, although we do not anticipate that they would be looking for an operational levy. So I don't anticipate anything on

217
01:02:24.079 --> 01:02:40.640
this page would change when we present the golf budget. Um, so if we just walk through what you're going to see tonight, you will see the detail of the general fund levy. You will see the detail of the community center levy. And um, I will just point out on this front

218
01:02:40.640 --> 01:02:57.440
page because it's um, nice to talk about great things with the staffing changes that are being proposed. You do see a decrease in the community center portion of the general levy. Uh, so that's running all the way through. We also at

219
01:02:57.440 --> 01:03:14.559
this point you'll we'll talk about EDA tonight and you'll you'll get some information from Jacob, some options we have on the EDA levy and what's happening there. But right now this is rolling up with a with a reduction in the levy for EDA. So if we get all the way to the bottom, the total levy um

220
01:03:14.559 --> 01:03:33.039
amount that this level of detail would roll up to would be um 10,751,000 and that is a 2.41% 41% total dollar levy increase over 2026. And again, plenty of details to go

221
01:03:33.039 --> 01:03:52.880
through, plenty of places you can um have questions or or make recommendations or changes. Um but just to give you an overview of what you're going to see tonight, we like to tell you what we're going to tell you before we tell you. So, >> sounds like one of my lesson plans from

222
01:03:52.880 --> 01:04:08.319
school. Oh, [clears throat] you've heard that [laughter] before. Okay. Well, I am married to a teacher, so >> I figured he helped you on that. >> Right. >> Good. >> Right. Okay. Any questions on the overview before we move on to the detail? Okay. So, we're going to start

223
01:04:08.319 --> 01:04:23.440
with general fund revenue. We'll be on page five. Um, again, the first couple lines here are the tax lines, and you'll see all the detail tonight that rolls up to where those uh first two numbers come from. So, um I'm not going to spend a

224
01:04:23.440 --> 01:04:39.440
lot of time on that right now. We'll run through some of the other things. Um when we look at other revenue items, one of the items, um that we budget for is the mid-continent franchise fees. We're recommending that we reduce those in the budget plan just based on the trend.

225
01:04:39.440 --> 01:04:56.160
Those are franchise fees that they pay us um relative to how much they collect for cable. And so, obviously, that is not a trend that's increasing. And so we think it's um best to really plan that a little more realistically. The next line item to cover is the

226
01:04:56.160 --> 01:05:12.559
building permits for the city. That's a significant increase in revenue. You will also see when we get to the expense side, a significant increase in expenses for that item. So those two things are linked. We changed the fee schedule for building permits earlier this year when

227
01:05:12.559 --> 01:05:28.640
we switched our business model for how we provide um building inspection. And so you will see that on both sides of the ledger, revenue and expense. So that is really a flow through of making that change. Uh fire relief aid. This item we budget

228
01:05:28.640 --> 01:05:44.400
and it's a 100% pass through. So the number is different than last year on both the revenue side and the expense side. There is no change to the levy for what's happening with fire relief aid. The next item is police aid. We did

229
01:05:44.400 --> 01:05:59.760
increase our revenue budget for police aid. Um we're typically trying to go um on a 2-year lag to what we've gotten. So 2024 would be our base year. We got $100,894.

230
01:05:59.760 --> 01:06:15.359
So we are planning $100,000. It is totally uh a state number. We won't get the number until uh hold on. We just looked today. What was the date for police aid? >> Oh, it was uh September and it's paid out October 1st.

231
01:06:15.359 --> 01:06:31.599
>> There we go. So, we won't actually know the number uh for 26 until September [clears throat] >> of this year or next year. >> This year for for 26. So, for 27, that's why we just we do it on a bit of a leg, but we don't want to let it get too far

232
01:06:31.599 --> 01:06:47.200
behind because then we're levying for money that we we don't need. So this 100,000 that we would budget for potentially here, we won't even collect potentially till >> October of 2027. Yep. >> Okay.

233
01:06:47.200 --> 01:07:03.200
>> Um the other one to note on this page um local grants, the score grant dollar value um that we will collect as revenue has gone down significantly as has the expense side. So again, just making those two things um correspond to how

234
01:07:03.200 --> 01:07:18.319
they're really going to flow through. That grant has been restructured and so we only expect that we'll recover what we what we spend and we no longer spend for the grinding. The county is going to pay that part directly. Um the final one to note, we don't have

235
01:07:18.319 --> 01:07:34.880
any dollars um offsetting our levy budget at this point for electric generation transition aid. We do have some dollars in the general fund reserve for that that we have not applied to this budget at this time. So that's a discussion item that you guys can have

236
01:07:34.880 --> 01:07:50.960
as we go through the process of of where [snorts] we where we want to uh end up or what makes the most sense. On the next page, page six, um just to note, I know it's it's um something that we talk about every year. The BAC

237
01:07:50.960 --> 01:08:07.440
charges for services. Um, typically we have gotten um, money from the township um, to help defay the cost of the BAC. We do not we do not plan that as revenue. If it comes in, it is upside and we have not planned that as revenue

238
01:08:07.440 --> 01:08:24.719
again for 2027. So that's consistent. Um, but we do see other charges um, other collections are higher than they have been. So, we did plan an increase in revenue, but not um based on the township. The next section is community center

239
01:08:24.719 --> 01:08:39.759
charges for services. That's the revenue that the community center takes in based on their memberships. I'm not going to cover that in detail here cuz um Brandy is going to cover that when she goes through her detailed section on the community center. So, we're going to

240
01:08:39.759 --> 01:08:55.440
forego that discussion at this point and move on to page seven. um interest. You'll see on page seven, we are increasing the um revenue amount for in for interest in the 2027 budget.

241
01:08:55.440 --> 01:09:11.600
And that um is just trying we don't need to be as conservative as we have been in budgeting that because we see our cash balances through next year will still be strong and interest rates have continued to hold. So, we're we're going to be a

242
01:09:11.600 --> 01:09:27.759
little less conservative um on that item. And then um overall you'll see a total revenue um including including levy. This is the total revenue for the general fund increasing 4%. So as we go

243
01:09:27.759 --> 01:09:44.480
through the next uh couple of pages and we get to the bottom and it says general fund expenses are going to be an increase of 4%. So just to give you a baseline of where where we're starting the budget process. Um, I think that just kind of helps uh set the stage for

244
01:09:44.480 --> 01:10:02.159
what you're going to see. All right. Any questions on the general fund revenue at this time? >> We got the 4,800 for special assessments. What do what do we we typically don't special assess, I guess. What is that for? >> That is uh typically for um snow

245
01:10:02.159 --> 01:10:19.920
removal, weeds, things like that. >> That kind of special. Okay. >> Okay. Very good. >> All right. Thank you. >> All right. Thanks, Lori, for kicking it off. Good summary of things to expect.

246
01:10:19.920 --> 01:10:36.880
So, I will start out on the expenditure side. Um, I'll cover just uh kind of the starting point of general government. I'll really hit on the admin and finance. Um, so I'll try to make this part as fascinating as possible since it is the finance piece of the budget. Um,

247
01:10:36.880 --> 01:10:53.520
mayor and counsel really, uh, straightforward. Um, not much of a change there. Only $100 overall. So, went down.2% from 461 to 40, a little under 40 4647. So, not much of a change there. Uh, ad

248
01:10:53.520 --> 01:11:09.040
administration. Um, they're really just changing with uh step and cola increases. So, 3.5% up to 203,207. Um, no real changes in allocations um there from prior years. So, um, overall

249
01:11:09.040 --> 01:11:26.000
admin increase 3.4% really just on the wage side. Flipping the page, um, starting off with finance, personal services really there, 1.8%. Um, no change in allocations on that

250
01:11:26.000 --> 01:11:44.239
side. And then, um, really just some of the health insurance just follows uh, based on the prior year selections. So, you see the decrease, but just some changes in selections there. Um yeah, overall total finance up 1.6%.

251
01:11:44.239 --> 01:12:01.280
And then professional services that kind of falls under this bucket. Um some slight changes kind of just within the buckets within um the other services and charges overall. Um very minimal change. Um but we did rightsize legal fees. We were we we had it at 75,000 for multiple

252
01:12:01.280 --> 01:12:17.920
years. um brought that down to 55 just to be more in line with, you know, prior year trends, but also leave some room for things that might um might jump up. Um well, I'll touch on line 158 on the accounting fees. That's a significant uh

253
01:12:17.920 --> 01:12:34.800
increase. Um but we are planning for the intersection project with TKDA. Uh we should have federal fund uh expenditures over 750,000. So we will expect a single audit that's around $5,000. um for that single audit. Um as well as we do have

254
01:12:34.800 --> 01:12:50.320
some of the required um gazsby 75 and and 87. 87 is the lease standard where they evaluate our leases. Um 75 is our oped. So it's our other post-employment benefits. They have to do an actuarial just to prove what our liability um

255
01:12:50.320 --> 01:13:06.800
could be. So those costs um in there as well. And they're um not every year. They kind of um you have to do a more in-depth study uh every other year for those. So that bumped up um the cost there. And then uh insurance on line 167 um

256
01:13:06.800 --> 01:13:23.760
really that's just 8% increase from uh the prior year. So um you know based on um where where we're currently sitting with some of our modifiers, we felt that 8% was a good starting point um based on uh and always good to reset our our 206

257
01:13:23.760 --> 01:13:39.600
actuals kind of reset with the building and some of the other changes where we're at. So we took the current year actual and just um added 8% for that. So overall professional services were were really consistent um with the prior year.

258
01:13:39.600 --> 01:13:55.840
Um gosh and then I'll just touch on the next page. Um just on the cemetery, we do budget for a contribution to the cemetery of $6,000 uh annually. So we'll um [snorts] continue to budget for that. Have they

259
01:13:55.840 --> 01:14:12.080
ever um [clears throat] expressed I mean I know I think it was 5,000 for 13 years ago and we you know we bumped it to six. I mean have they ever cuz I know it's one of those things we're constitutionally required to do is you know if they ever say throw us the keys

260
01:14:12.080 --> 01:14:28.239
and go we're out of here it would fall to us and public works or whoever to you know have to go take care of it. So, have they ever said >> I actually talked to >> one of the people once and they were very happy with what we've given them

261
01:14:28.239 --> 01:14:44.640
and they they literally said it was enough. [laughter] >> Okay. Well, >> heard the same thing. >> All right. That's one of those things that's always scared me that, you know, it would cost us probably a lot more than $6,000 to to if we were ever given that

262
01:14:44.640 --> 01:14:58.400
responsibility. So, I wouldn't I don't want I want to make sure I want to make sure they're happy. If it's if $1,000 was needed or something, I was okay. But no, if they're happy with six, that's that's fine. >> Okay. Otherwise, any other questions

263
01:14:58.400 --> 01:15:22.960
just on those few departments. All right. That I'll turn it over to Shannon to cover city hall. Good evening. Um, starting with wages, Lori went through the assumptions. Um, our department gets to see a decrease of

264
01:15:22.960 --> 01:15:37.840
2.6%. Um, for supplies, we did increase the general operating just simply because of inflation. Um, we're anticipate that to go up. We did reduce tools and minor

265
01:15:37.840 --> 01:15:53.360
equipment by 50%. Um, a lot of that again has to do with the renovation of the building and um replacing a lot of items. Conferences, conferences and training, we increased that by 21% because we want to stay

266
01:15:53.360 --> 01:16:10.800
smart and we're going to training. Um, credit card fees, we reduce those. Uh the credit card fees that are in the general fund are only credit cards that or payments that are made for um oh gosh

267
01:16:10.800 --> 01:16:26.880
>> building permits or >> and like compost cards come through. Miscellaneous credit card fees get charged here and we don't get miscellaneous payments very often through PSN anymore. Most of them will come through as an a. Um, some of the

268
01:16:26.880 --> 01:16:42.400
bigger ones that we used to collect through PSN come as an a now and we don't pay credit card fees on those. >> We have some um, mobile food unit permits that come through on the credit card. So, there isn't a whole lot of fees there anymore.

269
01:16:42.400 --> 01:16:58.960
Um, telephone that has went down because we have um, transitioned to teams for um, that communication. And then utilities, we did bump that up just with the size of the building. Um,

270
01:16:58.960 --> 01:17:20.199
we've indicate or there's indicators that it's going to cost more for heating and cooling and at the end of the day it the budget expenses for this section go down 1.4%. Does anyone have any questions?

271
01:17:23.840 --> 01:17:55.840
Thank you very much. Now talk about planning. Everyone's favorite subject. Okay, maybe just mine. >> [clears throat] >> So, in the budget this year, there's a couple of things that I'll I'll note uh for planning. General operating, we've

272
01:17:55.840 --> 01:18:10.480
kept that kind of the same for quite a while. We don't generally exceed any of that, but in there just for tools or other equipment that we may need. So, that stayed at a thousand. Um you'll notice on conferences and training that stayed flat this year as well. So that

273
01:18:10.480 --> 01:18:27.520
includes a number of our APA, Minnesota APA conferences, uh some of the LinkedIn learning, prior learning that are online learning modules. And then one thing [clears throat] that you'll see in here that's a little new is the GIS LIS. Um so we do quite a bit with our GIS systems. And so that consortium is in

274
01:18:27.520 --> 01:18:43.360
there as well. Uh, professional services again stayed flat just as needed for land use applications is noted in there or if there's other legal or other grant writing that come up [clears throat] throughout the year. Publications, you'll notice that just as a reminder,

275
01:18:43.360 --> 01:19:01.360
we increased that a couple years ago. Publication dollar amounts have increased um the cost for that. So again, kept [snorts] it at 2,000. That's seems to be fairly uh kind of in the right category. So you'll notice in 2025 is around 1,700.

276
01:19:01.360 --> 01:19:18.000
Uh the one item I wanted to note that actually increased a little bit at 4.8% was the dues, licenses, and subscriptions. So by a,000. Our GIS software does increase every 3 years. So in [clears throat] 27 that'll come up for another renewal. It was more of a

277
01:19:18.000 --> 01:19:33.760
substantial increase due to some of their licensing restructuring. So but that spread across three different categories. of public works. Um, and I think that's across four different ones. Communication, which covers some of it in this. So, it's split three different ways, but that's why you're also seeing

278
01:19:33.760 --> 01:19:49.440
an increase in the dues, licenses, and subscriptions. And in addition to some AICP stuff for Austin as he's working on that and then we did include this year what's called D5 renders, we're going to start working on the frontage corridor.

279
01:19:49.440 --> 01:20:06.000
So that works in collaboration with some of our um CAD and SketchUp software as we do some more of the modeling. So it's three-dimensional imaging software. And then you'll notice that SmartGV so thing with licensing is they they never seem

280
01:20:06.000 --> 01:20:20.000
to decrease. They always just increase. So SmartGov increases as well. And that's in line with our contract that we've had with them. So [clears throat] um those are the increases there. And generally what you're seeing is that $1,000 increasing

281
01:20:20.000 --> 01:20:37.760
for 2.3% for planning. And with that I'll answer any questions >> for general operating. I mean we I know we kept it at a,000 there but you know looking back at 24 we did $105 for the whole year $493. >> This year we're at 190. So if you double

282
01:20:37.760 --> 01:20:53.920
it and say you know we're just round up a little bit call it 400. I mean, I don't sound like 500 bucks, but would we consider going to 500? >> We could. A lot of times, it's just in there as a contingency. I don't foresee any major things that come up this upcoming year. Some of the things we had

283
01:20:53.920 --> 01:21:10.000
in the past were some equipment for carin that she uses pretty often in her office. Just the treadmill that's used, it's pretty regular thing. So, but if it's that's of interest to you, I don't have an issue knocking it down. It won't really hurt our bottom line from [snorts] a planning standpoint.

284
01:21:10.000 --> 01:21:28.480
Well, help 500 bucks is what it'll do. >> So, it's all noted on here. We can do that. But again, I don't anticipate we don't have a lot of major expenses. Is there anything now that we've taken over or, you know, changed the

285
01:21:28.480 --> 01:21:46.000
permitting thing? Is there [clears throat] as far as like internal? [snorts] No, a lot of it still again works through smart gov. Um, Kin does a really good job with that. software-wise, she has what she need. A lot of it's in spreadsheets and and within SmartGov itself. So, I don't foresee any sort of

286
01:21:46.000 --> 01:22:06.080
those tools. And a lot of the paper and stuff has gotten reduced quite a bit because we don't use paper stuff anymore. So, yeah. Any other questions? And there questions for Jacob. Okay. >> All right. Thank you, sir.

287
01:22:06.080 --> 01:22:21.920
Oh, yeah. Hey, stick around. Sorry, I'm missing the other packet with the order. So, that's my fault. [clears throat] Um, building inspection. So, a couple of things to note. Again, this has a general operating. To your point, Rick, if that's something that council wishes

288
01:22:21.920 --> 01:22:38.400
to to reduce, you can. Um, the fuel and transportation, we knocked it down to 200. And again, that's for code enforcement. So, if we use the staff vehicle for enforcement visits or as we drive around for other uses, that's where that 200. So, it went from a,000 down to 200 because we don't have a

289
01:22:38.400 --> 01:22:55.440
full-time in-house building official anymore. Uh, the other ones to mention are, you'll notice a deduct or a reduction in conferences and training. Again, uh, we left a thousand in there cuz Karen does do stuff with that. And so, leaving some money in there for some

290
01:22:55.440 --> 01:23:11.120
trainings as they come up in her eyes to keep her up to speed. This is what Lori mentioned on the contracted services. So Karen does an awesome job of keeping our records uh really well. And again with Smart Good, that's made it much easier to know where we're standing on our our

291
01:23:11.120 --> 01:23:28.239
financial amounts. And so uh we averaged uh we took an average of $22,000 um a month for the next year cuz we did a look back at about 15 months. Karen did that was it average monthly. Some months were way less, some months were way more. For example, I think in June

292
01:23:28.239 --> 01:23:44.480
we'll have like a 40 something,000 invoice from Rum River. So if you average that out over annually, that's where that $264,000 is coming from. And that's 80% of the total fee. Um, we do see 85% on some of

293
01:23:44.480 --> 01:24:01.440
the bigger projects like if they're a school or if they're a delegated project like some of the industrial ones that may be 85% but 22,000 is 80% which is an average for the year. So that's what you're seeing. That's why the big increase in contracted services and then

294
01:24:01.440 --> 01:24:24.280
dues [snorts] licenses and subscription again increase uh related to smart gov. And that's it for building inspections. All right. Any questions there? >> All right. Thank you very much. >> Thank you.

295
01:24:30.159 --> 01:24:47.760
>> All right, police time. Um, starting kind of at the top, personnel. Um obviously the the bigger increase there was due to our addition of the sergeant position there for wages. So you'll see an increase there. Um some of the nice follow through from uh the work with our

296
01:24:47.760 --> 01:25:02.960
health insurance. Um you can see they're following through like Lori had mentioned on the um wages side of it. Overall supplies no changes there operating with the same uh same funds as we did last year for that type of

297
01:25:02.960 --> 01:25:19.679
equipment. Um and then other charges and services. Uh the biggest impact that we had to look at this year was uh for contracted services with the uh police remodel. In addition, there were some uh costs that were taken on for contracted

298
01:25:19.679 --> 01:25:36.719
services. We now have service plans with our birectional antenna that we added last year. Um that system. We've got service contract for our new um interview and recording uh system. We have the new scheduling software that you've been hearing about throughout um

299
01:25:36.719 --> 01:25:52.000
and then some additional fees with some like um printer company. Pretty pretty minor there. But those increases alto together um was why you see the increase in contracted services. Um cleaning fees too obviously bigger building takes longer to clean. Cleaning fees went up a

300
01:25:52.000 --> 01:26:08.000
little bit. So we tried to um grab onto all those and include those in that and that's why you see the increase there. um a safety budget uh we brought down a little bit that um is identified as safety in here. I'll call it community engagement that was developed when we

301
01:26:08.000 --> 01:26:23.199
did um safety camp. That was a little bit more of a financial um project for us. Um so we were able to take a little bit off of that line item. Uh we still do, as you're aware, a a lot of community engagement events, but we've worked really closely with our partners

302
01:26:23.199 --> 01:26:40.480
at the community center um as well to help facilitate some of those so that we're not using as many many funds to to host those events. Um um everything else carries kind of along. Um dues and licenses, just a minor change there, just with some some

303
01:26:40.480 --> 01:26:59.159
uh licenses that we didn't need anymore. That covers all the officers licenses. So that does eb and flow a little bit uh depending on the year that they renew. So uh that being said um that's what I have for police. Any questions?

304
01:27:02.080 --> 01:27:20.480
No. >> Okay. Thank you for your time. >> Okay. So on the bottom of page 14, you'll see the fire budget. Um that is consistent. I believe with your um budget that was approved last night. So

305
01:27:20.480 --> 01:27:39.120
that is that is in here. >> I'll just touch on it may look unique, but we did confirm um sorry lawyer for jumping in. Uh the fire relief contribution at 146. So the fire relief did transition to the state plan. So the state will now submit those supplemental

306
01:27:39.120 --> 01:27:54.639
benefits directly to them, but for accounting purposes, we're required to record them on our books. So you'll continue to see the revenue and the expense within our budget even though we're really just going to record the the the total amounts, but the funds

307
01:27:54.639 --> 01:28:09.280
will go directly to the state. >> So just more of an FYI on how it works with the system. >> And that's the 2%. >> Yeah. >> Yep. >> Okay. >> The state can do a better job of

308
01:28:09.280 --> 01:28:27.920
handling that. [laughter] >> All right. streets and parks. >> Um so as a taxpayer myself, my goal is always to keep the numbers as flat as possible. Um goal being maintaining all the infrastructure that falls under the

309
01:28:27.920 --> 01:28:42.880
title of public works and doing it uh effectively and in the mind of the taxpayer so that the dollars that are entrusted us are spent wisely. >> Yeah. Um, street side, public works side, personnel services saw a modest

310
01:28:42.880 --> 01:29:00.159
increase, $838 from 26 to 27, so less than 1%. Lor's kind of alluded to healthc care cost savings, uh, being a help in that area. >> Um, under the supplies section, uh, saw a slight decrease of $500. So again,

311
01:29:00.159 --> 01:29:16.320
less than 1%, 26 to 27. Couple areas to note. line 351, general operating. Um, we have an asset management program that we use to track and uh all the maintenance that we do for all the assets within the public works department. Um, we originally were in

312
01:29:16.320 --> 01:29:33.920
with one company, that company was purchased and the new company kind of as Jacob alluded to, they seem to always kind of change things. So >> [snorts] >> uh originally we're our original set we had a set number of users and um we were grandfathered in and now uh to get an

313
01:29:33.920 --> 01:29:48.320
unlimited number of users so we can expand it to maybe other departments within the city um we we'll move to enterprise fund. So uh accounted for an uptick to do that and then that is spread between all areas of public

314
01:29:48.320 --> 01:30:05.840
works. So, uh, parks, streets, su, uh, sanitary, so domestic and industrial, water and storm. And then line 352, fuel transportation. I decreased that slightly just based on our annual average spending over the

315
01:30:05.840 --> 01:30:23.679
last I look at least five years back. I have further back, but um, so we've been spending less than what we've been budgeted for. So, just pulled that down a little bit. And then other services and charges. The final section. Um again, I didn't put a

316
01:30:23.679 --> 01:30:39.920
little note there. A couple areas to look at with that line 374 repairs and maintenance for storm. Um I did not dedicate any money for that asset management program to storm previously. Um so because we do also track storm assets with that, I did add some money

317
01:30:39.920 --> 01:30:56.480
in there to help cover that cost. uh line 380, our compost site. Uh so the yardway site did change. Lori kind of alluded to that. Um with discussions last year with the county, um the county has changed uh how they handle those

318
01:30:56.480 --> 01:31:11.840
funds. They now do the bidding for the grinding. Uh they coordinate the grinding with the the contractors and then they pay the invoices directly. So um more of the money is staying with the county and they're handling more of that part of the work. We still get score funding that'll help cover some of our

319
01:31:11.840 --> 01:31:29.679
costs at the site. Um, you know, if there's control work that we have to do with the gate, electrical costs, internet. So, we're still getting uh funding, but having enough money in the budget to help cover the costs that the score funds that we get do not cover. And then line 3D1, our recycle day. I

320
01:31:29.679 --> 01:31:44.880
just decreased that a little bit based on just what we've spent over the last five years. It's the annual average. So, again, that one we get score funding for that. the score funds have covered the majority of those costs. So, just trying to keep that in line with what we actually spend.

321
01:31:44.880 --> 01:32:00.960
>> What caused the So, 2024 on cleanup day there, we have 11, you know, almost $12,000. What caused it to go from 12,000 to 4,000? Was it just grants or was it like moving out to Northern Metal or what caused that big drop? >> Northern Metal was a big part of it. So

322
01:32:00.960 --> 01:32:16.719
they were able to take things and defay costs that we used to have to pay for just because it's on their site and or things that services that they can provide as far as processing some of the recyclables. So yes, that was a >> Well, one of the things that they did

323
01:32:16.719 --> 01:32:33.280
was I think we used to have to pay for batteries and Northern Metal takes them >> last year. They took batteries for the first time. Yep. >> At no charge. >> Yep. >> Because they get money for them. It's a win for us though. Yeah. Yep. So,

324
01:32:33.280 --> 01:32:52.920
no, it not only is it a great site to have it, there are added benefits. So, so overall the the budget for uh public works, you see a difference of about $61,000 decrease from last year or 4.4%.

325
01:32:53.280 --> 01:33:08.719
>> That's what I like to hear. >> So, most of that is the >> sticker. Yeah. Sweet. >> So most of that is the compost. So, right, that's 60,000. So, >> yeah. And I mean, the healthc care benefits, too, is a big part of that shift, too. So, Yep.

326
01:33:08.719 --> 01:33:25.360
>> Yeah. 30,000. Yeah. >> Still get a sticker. Yeah. >> Take it. Better than kick in the pants. All right. Parks. Uh, so the overall operating budget for parks in 27 will be up slightly from 26. Uh it is good to

327
01:33:25.360 --> 01:33:41.199
note that we did add a park here starting in 26. So Sand Hill Park is now part of our park system. Um this will add some additional maintenance uh and repair duties for public works. Uh overall the budget um operational budget spending in 27 will only slightly

328
01:33:41.199 --> 01:33:57.440
increase from what it was in 26 even with that added park. Uh if we look at the first section uh personnel services personal services uh remain flat 26 to 27. Um Lori kind of alluded to why that stayed that way. Uh

329
01:33:57.440 --> 01:34:13.120
under our supplies section, uh we'll have about a $10,000 increase from 26. So that's overall about 17%. Uh line 416, general operating, that went up about $1,400. Again, that's to account for moving to the enterprise uh version

330
01:34:13.120 --> 01:34:30.719
of Open Gov for asset management. Uh line 418, landscape materials. We did increase that by $8,500 or 28%. Um, when Phil went through the park cip, we had several line items in the park cap that were covering turf and or irrigation at

331
01:34:30.719 --> 01:34:47.840
parks. What I struggled with was I felt like almost like you'd have to try to create a project when there wasn't one that needed to be done. Uh, a lot of turf maintenance and irrigation repairs we do operationally as needed. So, uh, we took those out of the CIP and then we

332
01:34:47.840 --> 01:35:05.199
increased some of the money we have in the landscape materials to account for, uh, those items for either irrigation repair, maybe added seed, added black dirt, those kind of things. If we need to do that, we would do it, uh, as it comes available. We wouldn't plan a big project out of our CIP.

333
01:35:05.199 --> 01:35:21.040
And then we also uh, with Jesse's addition, he was a landscape in his background. So, uh, we did add a little money for some colored wood chips as well cuz he likes to, uh, round trees and things instead of using the ones that we create when we grind trees up. He wanted it to be a little more

334
01:35:21.040 --> 01:35:36.639
appealing to the eye, especially in parks. So, we did add some money for that just for trees. So, like at at the park at the BAC, it's uh the chips now are a little more presentable than what we used to use in the past. So, um, and then we're also accounting for fertilizer and weed control and then

335
01:35:36.639 --> 01:35:51.760
field paint. And we do have, you know, the usage at the BAC is very strong. So, just wanted to make sure we have enough funding to make sure we can paint all the lines that are necessary for all those users. So, uh, next section, other services and

336
01:35:51.760 --> 01:36:07.360
charges. We have an increase of about $12,900. So, it's about 11% increase from last year. Uh, telephone was one area that we increased. Um, it's quite a bit. So we do have internet that we use for parks at public works itself but we also have

337
01:36:07.360 --> 01:36:23.440
internet at cobar and city park buildings. Um so accounting for the charges we get for that we do uh charge some of the cell phones that we have for public works staff to the parks budget and also the streets budget. Um and then there was some costs related to going to the teams calling and things. So that

338
01:36:23.440 --> 01:36:40.560
was worked into that line item. Uh line 430 refu and sanitation. Um we did see an inc or we increased that by 6,000 I increased that by 6,000 which is about 35 uh% just to kind of meet what our average spend has been for both

339
01:36:40.560 --> 01:36:56.320
garbages throughout our park system and then our rental of of the portable toilets. So um you know we added archery parks, there's another one there and then just going through and we have quite a few. We will add one at the BAC um before youth baseball starts to

340
01:36:56.320 --> 01:37:13.040
accommodate like the school ball when they use those fields. So there's some uh movement and things with different uh with those portaotties. So just accounting for those costs. Uh line 432 repair and maintenance equipment and vehicles. Just a slight

341
01:37:13.040 --> 01:37:30.239
increase there. Kind of looking at what our average spend has been. And then obviously no nothing related to parts is getting cheaper. So we with with costs going up there just trying to account for that and make sure we're prepared. So again, overall the operational budget for parks in 2027 saw an increase of

342
01:37:30.239 --> 01:37:49.159
about $23,000. So again, 4.4%. So pretty happy with trying to keep her where it was, especially with adding a park. And with that, I can answer any questions. Any questions for Chris on parks?

343
01:37:51.440 --> 01:38:20.800
>> All right. Thank you very much. >> [snorts] >> Nice to see you again. Um, so I'll talk about the community center budget. Um, first thing you might notice is that the levy has decreased by $27,37753 um, from 2026. So, as I work through

344
01:38:20.800 --> 01:38:35.920
this, I'll note a combination of increased revenues and cost-saving adjustments that con contributed to that reduced levy. Um, starting on page 17, line 22, uh, increased revenue source. We started that Becker clothing line that you may

345
01:38:35.920 --> 01:38:52.719
have seen with the Snuffy's Landing shirts and sweatshirts and stuff. So, we've seen a revenue increase on that. Anticipate more as we continue to update that line and sell those products. Um we're working on a few different things right now. So line 24, our seasonal user

346
01:38:52.719 --> 01:39:08.080
fees, that's our memberships. Uh we are pacing really well, anticipating to end this year above the 2026 goal. Um so we adjusted that for 2027 to reflect that. Line 206,

347
01:39:08.080 --> 01:39:24.239
program revenue. um just decrease that line to show based on past trends in 2026 pacing. Line 28 is another fun one. We have been seeing a increase in building rental revenue. Um so we

348
01:39:24.239 --> 01:39:40.320
adjusted the 2027 goal to reflect that. That's possibly we're guessing from um Civic Rex streamlining the rental process, making it a little bit easier for people just to go ahead and go online and book. Also collecting fees has been a big part of that. um because

349
01:39:40.320 --> 01:39:56.320
we're collecting everything on site right away before booking rather than having to hunt people down and up and down losing rentals and whatnot. So, so that's a nice update. Um 2020 or line 34, the Adventure Zone program revenue.

350
01:39:56.320 --> 01:40:11.040
Uh since I've been involved in Adventure Zone, we've taken on more students than they have taken before. And so that increased revenue just from more students paying daily tuition fees. We also raised the rates in Adventure Zone

351
01:40:11.040 --> 01:40:28.080
um effective June of 2026 based um just to make us a little bit more competitive with the programs in the area. We are still quite a bit less than a lot of the area programs in the area. Um but so that can contribute to that increase as well. So the 2027 target shows uh an

352
01:40:28.080 --> 01:40:44.719
increase to reflect the rate increase and more students based on pacing. on the next page now under expenditures you'll see right away on uh lines 68 and 69 the wages that would reflect that

353
01:40:44.719 --> 01:41:00.880
from so 100% of the special events and fitness coordinator was being coded to the part-time wages which is line 69 and that was 50% of those wages were reallocated to the full-time scale or

354
01:41:00.880 --> 01:41:16.800
full-time line on line 68. So you'll see that line will is now a combination of myself, the admin technician, and 50% of the special events and fitness coordinator. Um, so you'll see that increase and decrease

355
01:41:16.800 --> 01:41:33.840
on those two lines. Line 75 will also show the health insurance adjustment with 50% of the special events and fitness coordinators health insurance on that line as well. Um line 85 uh is eliminating the general operating line

356
01:41:33.840 --> 01:41:50.639
and consolidating it into contracted services. Uh that's just because I don't I usually I can code everything into other categories that I haven't used general operating and don't prefer to use it. So consolidating that into contracted services where it is most

357
01:41:50.639 --> 01:42:07.440
more often used. um line of 106 uh utilities. We decreased that by 15,000 due to past trending usages and upgrades to more efficient equipment leads us to believe we'll continue to stay on track with that. Um the next page under

358
01:42:07.440 --> 01:42:23.760
maintenance, one of the big things here is you'll see um an increase in the wages for part-time. So line 125 uh we we terminated the contract with the cleaning services that we were using and

359
01:42:23.760 --> 01:42:39.440
went to an internal cleaning model similar to what was done years ago at the community center uh just due to performance issues and not not working out for us. So we went back to hiring internally. So you'll see on line 150 that we had a reduction in the

360
01:42:39.440 --> 01:42:56.080
contracted services and then was reallocated into the line 125 wages to compensate for the the staffing. Now, [snorts] um, next page under aquatics, page 20, aquatics,

361
01:42:56.080 --> 01:43:12.800
similar to what you saw on the last page, uh, lines 168 and 169 in increase. Actually, that's an addition the full-time uh, line item that wasn't there before. So, we added a full-time line item for the new full-time

362
01:43:12.800 --> 01:43:29.199
program coordinator. uh and 50% of their wages is coded to that line. So you'll see a decrease from the part-time and then an increase into the full-time under adventure zone lines 206 and 207. Similar thing there where you'll see an

363
01:43:29.199 --> 01:43:46.000
increase in the full-time and a decrease in the and full-time again wasn't there prior to this. So that was added for this >> question on adventure zone. Um so I know of as we in because we show an increase in revenue. So, as we've increased in revenue that we start

364
01:43:46.000 --> 01:44:01.679
having to add more people, I guess do we think we got that uh covered for as far as additional staffing? >> Yep. Yep. So we operate at a ratio and we calculate based on that. But um because also just a note because we're not a licensed or certified program, we we try our best to stay within a 1:15

365
01:44:01.679 --> 01:44:17.360
ratio which is standard, but we can fluctuate a little bit outside of that too as needed just cuz we're not a statelicicensed program and we're a recreational camp. So we can accommodate >> within a little bit of reason on that. But yeah, but we stay to that 115 1 to

366
01:44:17.360 --> 01:44:34.000
15 the best we can and that is reflected. Um, so yeah, uh, we were on adventure zone and then lines 218 and 219, same thing. Uh, eliminating the general operating and consolidating it into the supplies

367
01:44:34.000 --> 01:44:50.080
budget in that case. Page 21 under fitness, same kind of concept across the board. We added a full-time wages line. So that is new and that is 50% of the special events coordinator and fit fitness coordinator's wages and then 50%

368
01:44:50.080 --> 01:45:08.639
of the insurance on line 242. Um and then we adjusted the line 249 to increase program supplies. That looks like a substantial increase, but you can see over the past year's trends that that's a pretty steady uh usage. Um, so

369
01:45:08.639 --> 01:45:25.600
we increased it to actually show that the large majority of that budget is the wipes that go towards cleaning the fitness equipment. And so we're just kind of right now exploring different opportunities for that that maintain the life of our equipment and then also uh are easy to use and convenient. So

370
01:45:25.600 --> 01:45:42.320
hopefully we can reduce that a little bit too. But that is what we have spent in previous years on those. >> Oh, so we spent $8,900 in 2025 actual and our budget was a thousand bucks. [clears throat] >> Yes, correct. So, and you can see that in I think previous years too. It was quite a bit of a jump from what we have

371
01:45:42.320 --> 01:45:58.800
spent in the past on those wipes. Um, and that is the primary expense in that line. There's very few other things. So, those wipes can be pretty spendy. Um, and then lastly, you'll see the Freedom Days budget. Uh,

372
01:45:58.800 --> 01:46:15.600
so line 272 holds the city donation. That's the donation that the city contributes to Freedom Days. And that's just being uh as a group we agreed to consolidate that down into the Freedom Days Entertainment Fund which you can see below just because that's how we

373
01:46:15.600 --> 01:46:29.679
processed the donations this year and that's where it went this year and it just makes sense that it's all in the same to instead of having extra line items. So again overall um the levy for

374
01:46:29.679 --> 01:46:51.320
2027 has decreased by about $27,000. >> [snorts] >> So, do we have any questions? >> Another sticker. >> Yeah, I want a sticker. >> Okay. >> Thank you. >> Thank you very much.

375
01:46:53.199 --> 01:47:09.760
>> All right. So, I'll touch on just a a few more items or I'll touch on the I'll touch on the general fund uh kind of the summary. Then I'll have Jacob touch on EDA and then I have a few just remaining items. But um page 23 just takes all that information that we just talked

376
01:47:09.760 --> 01:47:27.520
about and just puts it into a nice um a nice summary there. So um starting on the top of page 23 have the revenues there showing that 3.1% increase in the property tax levy on the general fund side. um see some you know adjustments

377
01:47:27.520 --> 01:47:43.760
within some of those other categories but overall total revenue increase of uh 4% up to 7.8 million. [snorts] Um going down there um into the different departments, we have general government. They're increasing $14,000.

378
01:47:43.760 --> 01:48:01.440
Um little less than 1%. Public safety. That's where with you know really driving the change on the building inspection side. I have that increase of 13.4%. A little over 300,000. Um next page 24.

379
01:48:01.440 --> 01:48:16.239
Public works. Chris and his sticker decreased 4.4%. Um, good there. Culture and wreck on the park and wreck site increased right around 4%. And then Brandy, a lot of great strategy there on the community

380
01:48:16.239 --> 01:48:33.119
center um at 1.7%. So total uh culture and wreck or really the park system as a whole uh increase of 2.3 and then overall expenditures of 4%. So, it gives you a nice summary of of all of that data that we talked rolled into a a nice

381
01:48:33.119 --> 01:48:55.440
little summary chart. So, with that, uh, with no questions there, I'll turn it over to Jacob to touch on EDA. >> Sounds good. Thank you. >> I don't know if there will be a sticker for this one, but we'll have some robust discussion.

382
01:48:55.440 --> 01:49:12.159
>> Um, robust discussion. >> I don't know. tired. [laughter] >> Maybe it won't be robust. Sorry. >> Seat belt. >> Clearly, I'm choosing good words tonight. I said bottom line when I meant material. Anyway, um all right, EDA. So,

383
01:49:12.159 --> 01:49:27.440
generally, not there there's a number of changes that I want to touch on just related to um the expenditure side. You know, Rick, to your point on the supplies piece, if you know, general operating and tools are

384
01:49:27.440 --> 01:49:43.440
sitting at a thousand each. We haven't spent that over the last couple years. So, if that's a reduction, again, it won't we don't have major expenses coming up this year. Um, so those are some spots you could reduce if you would wish to, and that's on the general

385
01:49:43.440 --> 01:49:58.560
operating tools. So, rather than,000, you go to 500 as well. So, they're set at 1,000 for now. Um, again, it leaves us some breathing room should something come up. On the legal fees, we bumped to just a,000. We didn't need use any in 25, but that's one of those areas that

386
01:49:58.560 --> 01:50:15.520
we don't know when something might come up. So, we want to leave funds in there even outside of the general legal funds. Um, conferences and training. So, you'll notice that remained flat. Uh that also includes some stuff for Karen as well um

387
01:50:15.520 --> 01:50:32.480
in her position and then uh some bleed over into Austin as well for elders. The biggest parts are on this contracted services professional services promotion. So you'll notice a bunch of numbers. One says it increased 239% but another decreased by 100. So there was

388
01:50:32.480 --> 01:50:48.239
some shifting around of funds for this and this is related to the use of EDA reserves and um the 212 acres for so the EDA reserves uh assumes 50k of that would be used to fund the AU update. So

389
01:50:48.239 --> 01:51:03.360
if you recall that was adopted back in 2023. It needs to be updated through 27 so it can be adopted again at the beginning of 28. So first quarter of 28 sometime statute requires those be updated every

390
01:51:03.360 --> 01:51:19.840
5 years to remain valid. 50k we got um the quote from the firm who did that previously which again is um they have a lot of efficiencies they could pick up should they take this on and again 50k was what they would

391
01:51:19.840 --> 01:51:35.520
anticipate for updating an AU. The other piece to this is uh we got a couple of different quotes for the EAW for the 212 acres. So statute requires if we're over a certain amount number of units on a

392
01:51:35.520 --> 01:51:50.800
property. So in this case for cities of our size uh that don't have certain comp plan requirements that statute details which ours doesn't uh the maximum number of attached units that you can do

393
01:51:50.800 --> 01:52:07.360
without doing an EAW is 100 uh un unattached excuse me and attached is 150. So it's not a very high threshold and you have to consider all of the land that you own adjacent. So it's not as if you can just plat a portion and say, "Hey, we only have 25 units." The

394
01:52:07.360 --> 01:52:23.599
statute requires that you include every single piece of land that you own >> as if it were fully. >> Correct. As if it were fully developed. So in order to give us even though we don't have a developer on this property, it helps to the marketability of the property by completing the EAW in

395
01:52:23.599 --> 01:52:41.520
advance and having it finalized. It's a big benefit um economically. So, and it reduces a number of, you know, it's a five or six month time frame to go through that EAW. So, you're also reducing that timeline. >> 40K do an EAW without having a project

396
01:52:41.520 --> 01:52:57.360
right in front of you. >> Yeah, you can. So, we've got proposals concept-wise, but if you don't, what you do is you take the minimum um what do you call that? The minimum density under your zoning code. Um there is a trigger point for an EIS, but yeah,

397
01:52:57.360 --> 01:53:13.199
I think we do have a conceptual layout for this. It contemplated 200 and something units. So if you were to utilize that, you could. Otherwise, it would be to this. Greg, were you going to say something? >> I was going to say the other thing that's that's putting this on on for next year is we have those lots on Jade.

398
01:53:13.199 --> 01:53:28.320
We have city property on Jade that got improved this year. We will rope those in. So we can sell those. We can't do anything with those until we do the AW because we can't look at those lots in isolation because we own 212 acres next to it. So, we're just going to look at

399
01:53:28.320 --> 01:53:43.920
the whole thing and then we'll be able to sell those lots. >> Okay. >> Thank you. >> Yep. >> Okay. But because it's close enough to what we >> Yeah. >> a project would be it's we think it's going to be housing. It's going to be housing. We think it's going to be roughly x amount of units. It'll come in pretty close. So, because of that, we

400
01:53:43.920 --> 01:54:00.480
can close enough to do an AW and not a AU. >> Yeah. you would you we talked about doing an AUR. The issue with the there was an AUR out there previously from 2004 for Riverbend. It was never updated. Um the reason a lot of these development projects have been able to come through without doing them is

401
01:54:00.480 --> 01:54:15.599
because they're under the density that was contemplated by that entire development when it went in. It also included, I believe, some of the Hammer property. We discussed whether to do an AUR, but where are the limits? How much land are you going to include? Is it city-owned property? Is it also a number

402
01:54:15.599 --> 01:54:32.719
of private development properties? Um, it's also more time extensive and it has to be updated every 5 years versus the EAW which doesn't. Yeah, good point. >> Right. On that AUR, will we look at I know another community was sued over there and the the courts was is that

403
01:54:32.719 --> 01:54:47.119
applicable to us? Is there something additional we're going to have to do with our AUR? >> On the AUR, no, I think the it's a standard update. Again, the one quote we got was from Stantech who did it before. They're very aware of the statutory requirements. Ours was one of the first

404
01:54:47.119 --> 01:55:03.760
ones to include um G greenhouse gases, GHC, which was a mandated requirement added about 5 years ago, four years ago. Um there's also a couple other things that they did include in this on they recognize

405
01:55:03.760 --> 01:55:20.639
kind of public engagement and those things that are more substantial because they have gotten more substantial. I think the one that I'm thinking of the one you're referring to where they got sued. I think it was because they they omitted or they it was the was it the greenhouse gas where they

406
01:55:20.639 --> 01:55:37.280
used a really really low number. It was um very uh like like we're talking like I think it was like 90% and they said 2% or something like I mean it was huge. Yeah. >> My point being if we needed to spend a little more to make it more defensible

407
01:55:37.280 --> 01:55:52.719
later I would >> Okay. you know, >> and that's good to know because the other discussion we had is I mean we could certainly one of the questions I asked is um on the EAW and the AU, you know, I think the AR they were pretty comfortable with

408
01:55:52.719 --> 01:56:08.719
the 50k. We do have substantial reserves in place in the EDA. So you're sitting on around a million dollars and we've talked about that even with some of the stuff that we're talking about using it for. Should there be additional costs? They're like, you should probably include this. There

409
01:56:08.719 --> 01:56:24.080
is the EDA reserves to use. One of the questions for you tonight was, well, you could increase the levy. Um, so on the EAW specifically, 40K was kind of their baseline. If there are other like a traffic study or phase 1 ESA or

410
01:56:24.080 --> 01:56:40.080
those like a wetland delineation that we required, you'd have to include those. Again, we're reviewing our own EAW. It's a little interesting. So, somebody's creating it. we're reviewing it as the RGU. One of the things Greg and I talked about today is maybe bumping that to 50K

411
01:56:40.080 --> 01:56:56.480
for the EAW. And then if there's again additional expenditures that come out of the state reviewing because anytime you do an EAW of these, it has to go to the departments of the state and a certain list for review. So if there are additional items that come out of that,

412
01:56:56.480 --> 01:57:11.599
use of the reserves would be a possibility. Otherwise, you could increase the levy. But your reserves are in such a place that >> it's a good use of it economically >> for sure. >> Makes a lot of sense. >> It's kind of a one-time almost a capital

413
01:57:11.599 --> 01:57:28.960
but not capital type of purchase. So >> So you'll notice that money has been shifted a little bit. We reduced like the promotion line by quite a bit because we don't use that as much. A lot of that's just for swag and materials. It was it was kind of maxed for a number of years because maximizing the levy. At

414
01:57:28.960 --> 01:57:45.520
this point, it's shifting some of those dollar amounts around to put more in the professional services line as well for EAW and other items. And then um you'll notice on dues, licenses, and subscriptions again an increase of a,000 smart gov that

415
01:57:45.520 --> 01:58:04.320
includes and just some other of the membership dues that increase on an annual basis. So generally not like huge increases in all the other categories. It's just shifting around and trying to tackle these environmental documents that we have to do. >> Sure,

416
01:58:04.320 --> 01:58:26.159
sounds good. Any questions for Jacob on the EDA? >> All right. Thank you. >> Thank you very much. >> All right. Um I'll touch on debt service. Uh so that's the chart with the

417
01:58:26.159 --> 01:58:42.480
nice um bar graphs on there. Um so we currently have the two issues of debt outstanding. The 2021A which was primarily related to the street reconstruction projects and then a 24A lease revenue um that relates to the uh

418
01:58:42.480 --> 01:58:59.599
building uh police and city hall building. So, uh, for pay 27, um, just a slight increase up to the 1.5 million. Um, we do have, um, we are sitting really good on the legal, uh, debt margin side.

419
01:58:59.599 --> 01:59:14.639
Um, the 21A bond is the only one that applies to the margin. So, um, your debt limit is set at 3% of your taxable market value. So, um, as of last year, uh, we were at 38 million total, offset [clears throat] by the 5 million. So

420
01:59:14.639 --> 01:59:31.280
still have around 33 million of legal uh debt margins. So really good for a city of our uh of our size. Um I think really the story here is we do have capacity as we roll out to 2032. You know as that 21A looks to um get

421
01:59:31.280 --> 01:59:46.960
paid off. uh we would have the ability to either issue additional debt or um kind of restructure where those levy dollars are are levied and used for as we really focus on um you know kind of solidifying our capital improvement

422
01:59:46.960 --> 02:00:03.280
plan. So looking at streets and some of the others where we could reposition some of that levy um and and be strategic on it but have some have some levers to pull. um really as we looked at even with the 21A issuance the fall off in 2031 was very strategic on you

423
02:00:03.280 --> 02:00:20.148
know the current circle plans and what was happening across the street. So um depending on where that all navigates we might have some additional time there but um good to have that opportunity um out there in the future. So really the story there looking really good um

424
02:00:20.148 --> 02:00:34.880
[clears throat] on the debt on the debt service side. So currently uh after 2026 there'll be 5 million outstanding for the 21A and then another 5 1/2 um on the lease revenue. So both um very um some

425
02:00:34.880 --> 02:00:53.040
some nice short structures for that debt we paid off soon. All right. So then just to wrap up um the overview summary. So there's that smaller the smaller chart that Lori had touched on on the front really that's you know that's the you know circle back

426
02:00:53.040 --> 02:01:10.080
from what um Lori had initially um discussed. Um so they're looking at an operating levy um within the general fund. Um actually I won't call it within the general fund but um we did I I will note the EDA we did switch that. You would have seen it on your tax

427
02:01:10.080 --> 02:01:25.440
statements this last year. we we switched that from a special um levy to just part of the general levy and that was strategic um because of transition aid that special levy would not qualify under the transition aid bucket. Um so we do issue that just under our general

428
02:01:25.440 --> 02:01:43.040
levy um even though it is outside we do allocate those funds directly to the EDA fund. It does come in through that levy. So overall looking at increasing from the uh 6.2 2 million up to 64 uh and then the overall at the 2.4 uh%

429
02:01:43.040 --> 02:01:58.000
at least the way it's structured now. Uh and then we will be revisiting um just the remaining uh capital uh items within there that are not identified in blue. So that'll be um the pieces that we bring back the streets community center

430
02:01:58.000 --> 02:02:16.239
uh and then Pebble Creek Golf. So the insurance, so last year when we saved the 10%, we didn't apply all that to the um budget last year, we kept some of that knowing that we were going to

431
02:02:16.239 --> 02:02:31.840
see an increase it. We didn't want to see it, you know, ski hills and cliffs, but um so we did not account for that. Then this year, that part that we put aside last year, that's not accounted for in this current budget then.

432
02:02:31.840 --> 02:02:48.320
Correct. >> Correct. So, you know, the the underrun last year that we would have had say on healthcare um would have been um transitioned over the future improvements fund. So, any excess over our minimum fund balance threshold. Um

433
02:02:48.320 --> 02:03:05.280
but it also allowed for the steady levy. So without without carrying forward those that that additional budget, we would have seen some much steeper increases in our current levy. >> That makes sense. >> It move Okay. >> Yeah. Future improvements.

434
02:03:05.280 --> 02:03:22.480
>> So So it allowed us to set some additional funds aside. Um, so if we did have some overruns, we can always bring them back from future improvements, but also allowed us to keep that levy a little more steady because if we would have if we would have um included that 10%, our levy would have dropped and

435
02:03:22.480 --> 02:03:37.520
then we immediately would have said, "Oh, here we go again um and and pull that in. So, um you know, if we did have some budget pressures and you know, there there would be options to pull some of those reserves and offset um some of those, but you know, based on

436
02:03:37.520 --> 02:03:54.480
where the levy is currently sitting, you know, there's not a lot of, you know, need to offset some of those changes with with those set aides. But there may come a time where, you know, we could pull from those with future if we had some future pressures

437
02:03:54.480 --> 02:04:12.880
on on some of the levy, right? So really theoretically we we're just looking at a actual 4.2% increase because that 10.8 was left there. >> Otherwise, we would have saw a

438
02:04:12.880 --> 02:04:30.440
legitimate budget number at 15% higher. >> Yep. Oh, you're talking just for health insurance. >> Yeah. Yes. >> Yeah. >> Yep. That's a good way to think of it. >> 15 assuming they come back in at table max, >> right?

439
02:04:30.719 --> 02:04:47.920
>> Which >> we get that number next month. You said >> healthcare. Forget timing of that. >> August, September maybe. >> Yeah, September. But if we got it set at the max, it the only place it can go is down from what

440
02:04:47.920 --> 02:05:04.320
we budgeted for or equal or down. So >> yeah, we're hopeful. They they prepared us for the full 15 when we met with Gallagher just to kind of walk through mainly because they were really competitive on getting us in and with

441
02:05:04.320 --> 02:05:19.760
healthc care costs the way they're at. But still let that it's not we were able to kind of that compounding effect. we're able to absorb so much of that decrease that it it it really take multiple years. Um really puts employees in a good position and the city I mean

442
02:05:19.760 --> 02:05:36.719
it is a big number. I think it's you know almost a million dollars now. >> Yep. >> So it's a big number. >> It was north of 900 I think when we Yeah. >> Yep. >> Yeah. So that's the overview summary. Can definitely take any more questions there. Um but really just laying the

443
02:05:36.719 --> 02:05:53.520
groundwork for next steps. So August 5th, we'll have the exec session where as I mentioned, um you know, governmental funds, um any any kind of remaining stuff, we could always circle back on certain pieces, but we'll have the Pebble Creek Golf uh uh operations

444
02:05:53.520 --> 02:06:10.159
as well as the the capital um second meeting in August, we'd circle back with the the capital for for streets and and uh BCC. Um and then uh September 1st preliminary budget levy approval. We could consider that depending on where we're at. That

445
02:06:10.159 --> 02:06:25.679
could be an opportunity. Um a lot of times we're just getting the values from the state around that time. So, it may make sense um you know for that September 15th, but we'll definitely see where those you just never know where

446
02:06:25.679 --> 02:06:41.280
the appeal process comes in that if they settle sooner and we have good data and we're comfortable um we could definitely look at the first meeting, but would always roll to the second. Yeah, I' I'd like to make sure we have that number if especially knowing that we have that flexibility of going to the

447
02:06:41.280 --> 02:06:58.159
15th if we have it. >> And the county's always coming in with some final changes, you know, even before that prelim. So, you know, we'll have their data, but the county still, you know, has some some moving levers before Bonnie's sending me, you know, their preliminary estimate um for where

448
02:06:58.159 --> 02:07:13.280
they're at. And we usually try to be conservative with that. So, we'll we'll pull it down a little bit just so we we don't um get surprised. But, >> have they received their number yet? >> Yeah. >> What they want to appeal or >> Yep. >> They started the appeal process.

449
02:07:13.280 --> 02:07:29.360
>> Their appeal due date was yesterday. >> They didn't miss it, did they? >> Yeah. I [laughter] >> I don't think so. They even allowed they allowed some organizations >> and dream, man. Come on. >> Some organizations there was even a comment that they they like extended the time frame for the appeal. I didn't know

450
02:07:29.360 --> 02:07:45.119
that was a thing, but they can get extensions on when they could decide if they wanted to appeal. So, um, so probably won't get data super quick. We may get an update just to confirm that they appealed lot. We'll get updates through the virtual site. So, we might get a new gives you a summary of of

451
02:07:45.119 --> 02:08:00.560
where all the businesses are at. >> Do we know what the prelim number was up down like the base number? >> Nope. Don't have any no data yet. Really just have dates. >> Okay. >> Really just have dates. If I could break through that barrier with the state, that would be awesome. But there's still

452
02:08:00.560 --> 02:08:18.719
a black box of how it all happens. So, >> yeah. >> Double secret probation, huh? >> Yeah. >> All right. Any final questions for Mark? >> No. >> Awesome. Well, thank you all for the time tonight. Thank you everyone for being here.

453
02:08:18.719 --> 02:08:41.360
>> Thanks everyone. I know that's a lot of work and thank you for what you did. >> Josh, why you didn't present tonight? soldier [laughter] >> dream about that hole in one. Uh >> yeah. >> Oh yeah.

454
02:08:41.360 --> 02:08:57.040
Going to have a t-shirt on for the next one that >> Yeah. >> I went to Pebble Creek and all I got was this hole in one. >> Yeah. >> You know, I wasn't there that day. >> What's everybody doing right now? You Everybody Yeah, they got stars. Did you get a

455
02:08:57.040 --> 02:09:16.880
>> Oh, yes. It's too much. Okay. All right. Well, we'll adjourn the executive session at 7:09. >> Thank you, everybody. >> Stop it. That was a lot of numbers. Numbers are hard. [laughter] Fighter.