1
00:23:19.520 --> 00:23:38.240
Thank you. Wrong paper. Okay. The time is now 6:34. Excuse me. [clears throat] The date is Wednesday, July 22nd, 2026. Commissioner Franklin is currently absent. Uh, and Commissioner

2
00:23:38.240 --> 00:23:56.000
Vendetti is also absent. [clears throat] Excuse me. Please note, we are doing a hybrid meeting. Nope, sorry. Please note, we're doing a hybrid meeting with in person in virtual attendance. I don't know what's wrong with my voice. If a member of the virtual public would like to make comments during a public hearing, please

3
00:23:56.000 --> 00:24:13.120
use your raise hand function on Zoom and you will be assigned a speaking time. If you are listening in via telephone dial in, press star 9 to raise your hand. Then press star six, [clears throat] excuse me, to unmute yourself. This meeting is being recorded by the local scene and a record of this meeting will be posted on the local scene website as

4
00:24:13.120 --> 00:24:28.880
soon as they are able. Anyone intending to make an audio or video recording of this meeting should notify me at this time. Okay. And announcement. The Kingston Conservation Commission is seeking a new member. Commissioners are responsible for protecting the town's natural resources, including through

5
00:24:28.880 --> 00:24:45.600
enforcement of state and local wetlands protection laws. Those interested should reach out to the conservation department by calling 781-585-0537 or emailing Matt Panella at mpanella kingston.gov. m pne

6
00:24:45.600 --> 00:25:02.000
l a kingston ma.gov. >> All right. >> Do we have we don't have any bills? >> No bills. >> So straight to action items. I will now continue a public meeting to discuss the request for certif certificate sorry of compliance submitted by bees and

7
00:25:02.000 --> 00:25:21.679
comments on behalf of the permit recipient Adam Schumacher for construction of a dual use agriculture and solar array system within existing cranberry box at 126 ring road D file number 037-0890 and 131 and 137 Ring Road D file number

8
00:25:21.679 --> 00:25:37.440
0370889 and the applicant has requested continuence to August 12th, 2026. Do you have any comments? >> No. Uh, this was at the last meeting. I had shared the um information they had

9
00:25:37.440 --> 00:25:52.640
provided and the commission felt like it wasn't really close to what the requirements were. So, we passed that back to them and they're still working it up. So, I recommend continuence. >> Okay. Do I hear a motion to continue to August 12th?

10
00:25:52.640 --> 00:26:09.600
>> I'll make that motion. Second made by Marilyn, seconded by Dot. All those in favor say I. >> I. >> All those no. >> Abstain. >> Abstain by Jim. And also let the record show that Commissioner Franklin is now in attendance. Taking over in a few minutes, but I'll

11
00:26:09.600 --> 00:26:26.000
do the next one. I will now open a public meeting to discuss the request for determination of applicability for five Reed Street submitted by Geneva Corore on behalf of the applicants Russell D. and an M. Packer to demolish and rebuild part of the existing home

12
00:26:26.000 --> 00:26:42.960
damaged by fire, including the addition of a master bath within [clears throat] 200 foot riverfront area. As this is the first meeting on this proposal, we will now hear an introduction from the applicant if they are in attendance. >> I can give one if you'd like. >> Just kidding. We're going to hear from Matt. >> And it is Parker, correct? Not Packer.

13
00:26:42.960 --> 00:26:59.360
>> No, Parker. >> Yeah, >> it says Packer. >> Yeah, we had a uh it's the the builder is >> builder is the applicant. >> Yeah. >> Yeah. Yeah. Um, so this is one that came across from a building permit. Uh, when I looked at the building permit, it had

14
00:26:59.360 --> 00:27:14.000
a plan, an older plan with it that showed the 200t riverfront area of a perennial stream going to about, you know, halfway through the house. There's a section of the house that burned down and their building permit was to rebuild that

15
00:27:14.000 --> 00:27:31.039
section of house. um rebuild that section of uh foundation and to add a small bump out for a bathroom. Um so I let them know we needed some form of filing on that. Uh the builder apologized for not, you know, knowing

16
00:27:31.039 --> 00:27:45.679
that a filing would be needed, saying he just kind of measured off 100 ft from uh from the house and figured there was nothing there. Um, so we received an RDA and a plan.

17
00:27:45.679 --> 00:28:02.320
We did a site visit on July 16th. Um, again, it's it's just partial demolition and rebuilding of the existing house after fire damage within the 200t riverfront area. Um, through further conversation with the builder and review, it's unclear whether this is a

18
00:28:02.320 --> 00:28:17.520
perennial stream or not. Um, from the commission's standpoint, for an RDA's purposes, I mean, it it's in a 200 foot riverfront area regardless, but it's not clear whether it's perennial not or not. We had an old plan that shows it as

19
00:28:17.520 --> 00:28:34.159
perennial. Um, and it doesn't show up on the >> on the USGS map. Um, there was no flow when we were there, but it's been drought for so long that you really can't base it off of that. Um, it has the appearance of

20
00:28:34.159 --> 00:28:51.600
I I don't like saying the word ditch, but it has the appearance of something that has been straightened before or maybe nin maiden origin. I'm not sure. It is associated with BBW and other nearby wetlands. It's not clear where it flows from or to. Um, the project, you

21
00:28:51.600 --> 00:29:08.399
know, largely is in the outer extent of that 200 foot regardless. It is a pre-existing yard area and structure. Um, it is a historic house, so it's a, you know, property that's been developed for a long time. Um, we talked with the

22
00:29:08.399 --> 00:29:25.440
builder about site conditions when we got there because he had already done some work on the site and, um, since then he has stabilized, put out silk fence, that sort of stuff. So we have a stable site now and I passed along to the developer that

23
00:29:25.440 --> 00:29:40.720
the commission may need more information about you know how some of the work meet met the standards of the riverfront area of you know our local bylaw and all that. Um he wasn't able to get with a wetland scientist before tonight. Um we

24
00:29:40.720 --> 00:29:58.320
have the property owners here tonight. They are obviously anxious to get this moving along through issues with the insurance company and whatnot. Um, I can pull up the plans and everything if my computer is hopefully finally a tech on the internet. Um, but essentially what

25
00:29:58.320 --> 00:30:13.520
we have is recreation of what was there before with a small bumpout for a master bath that is no closer to the resource areas. Um, so it we don't have 100% of the information that we would typically have making a decision on something like

26
00:30:13.520 --> 00:30:29.760
this, but I can say that it is largely replacing exactly what was there and we do now have erosion control place on site that should be protective of that resource area. Um, and we have a stable site. So if you want me to pull up the

27
00:30:29.760 --> 00:30:45.200
plan, I can do that. If you want to ask any questions on any of this, let me know. We are way under the maximum impervious surface numbers. It's a very large lot,

28
00:30:45.200 --> 00:31:03.440
majority of which is out of jurisdiction. Um, but there's a large portion of jurisdiction on the property that and the only impervious surface within jurisdiction is a small portion of the existing house. Do we have any questions?

29
00:31:03.440 --> 00:31:25.039
>> No, I think it's pretty clear. >> No questions. [clears throat] Excuse me. >> If you want to hear from the property owners, they are here. They can go up to the >> Do they want to? >> Yeah. >> Sure. >> Do Do you have anything you want to say? >> You'd have to go up to the um thing and

30
00:31:25.039 --> 00:31:44.000
just say your name and address if you do. You don't have to. if you don't want to. >> I'll be honest with you. I'm not much of a speaker, so >> not many people here are. >> No, good hands. >> Well, first of all, uh my name is Russell Parker. Uh I reside at five Reed

31
00:31:44.000 --> 00:32:01.440
Street, Kingston. Um first, I'd like to thank you for taking the time to hear my plate and uh do the best I can. Um to be honest with you, the house has been there for

32
00:32:01.440 --> 00:32:18.799
1776. Um back then there wasn't a conservation commission or um you know no rules and regulations of what what had to be done. Um

33
00:32:18.799 --> 00:32:37.600
so to be honest with you, we weren't really sure about a perennial stream. Um, we've lived there for over 30 years and I mean to be honest with you, we got

34
00:32:37.600 --> 00:32:55.840
um we had a fire about 17 months ago. We've had arguments with a um insurance company trying to get us to uh you know they thought we could build off the first floor. We had experts come in

35
00:32:55.840 --> 00:33:13.679
and uh it was determined that it couldn't be built safely. Uh and the only alternative obviously is demolition. Um we are keeping basically the same footprint although there is that uh just jet out. um for a master

36
00:33:13.679 --> 00:33:30.880
bath. And the reason for that is basically cuz when it was an antique, there were no rules. So, you know, when people went in there, they'd say, "Well, these stairways down to the basement are illegal. The stairways going upstairs

37
00:33:30.880 --> 00:33:44.720
are illegal." So, we had to rearrange all those. >> Therefore, it wipes out a lot of the space. We needed a bathroom. That's why we had to have to the uh outside um

38
00:33:44.720 --> 00:34:06.480
addition so to speak. Um we just were unaware of I guess this perennial stream as you call it. I'm not sure if it's perennial or if it's intermittent. Um,

39
00:34:06.480 --> 00:34:21.599
I've actually, uh, taken pictures, you know, today, this morning, after this torrential rain that we had and fully expected there to be water, standing water in there. I didn't see anything. I can show you the

40
00:34:21.599 --> 00:34:38.320
pictures if you'd like. Um myself and my contractor uh Steve is we're trying everything we can to appease people. We're put we moved uh a pile of lom and

41
00:34:38.320 --> 00:34:55.520
we moved a pile of stumps and put them as far away as possible. We put down silt fence and we put down wood chips to prevent any type of erosion or silt infiltration. We just uh we're willing to do anything

42
00:34:55.520 --> 00:35:12.200
that's required of us. We just want to get our lives back together. It's been 17 months and we haven't even been able to demolish the house and it's a long way to go before we get the house built or anything.

43
00:35:12.800 --> 00:35:31.040
I have the uh plan up on the screen over here for the commission. Um, this is modified by the builder just to show you have the existing house right here. >> Existing kitchen here is we're going to be keeping the foundation here. Okay.

44
00:35:31.040 --> 00:35:47.359
And this will be a new foundation here. >> New foundation around this area here. And this is the bump out for the new master here. Your dotted line here is the extent of the 200t riverfront area. Whether it's perennial or not under the local, you'd still have that. It's just

45
00:35:47.359 --> 00:36:04.160
the regulations would be different. Um, and this right here is the silt fence limit of work right here. So, silt fence and then you had wood chips in here to cover some of the area that was already >> right along the road the wood chips and um, >> and I did recommend along the road as

46
00:36:04.160 --> 00:36:18.880
well to keep anything from coming out into the street. So, the builder now has done what I asked in terms of making the site stable and the work rebuilding exactly what was there would clearly meet all the regulations. The only part that's not 100% clear would be the

47
00:36:18.880 --> 00:36:34.160
addition of the other portion of it, but as far as I'm concerned, it it probably would. It's, you know, it's a, like I said, a small area that was already legally, you know, landscaped lawn area for

48
00:36:34.160 --> 00:36:50.240
>> 250 years. Um, >> so it's it's something that while it's outside of the way the commission typically does business, I believe probably fine given that we do have now proper error control, site stability, and I can be checking up on

49
00:36:50.240 --> 00:37:05.040
the site through construction. It's something that the builder should have filed with the commission >> a year ago >> so that you're not feeling like you have to rush your process because you know obviously you feel for the homeowner that's going through with the insurance

50
00:37:05.040 --> 00:37:21.599
company but given where we are now I I don't think there's any issue if the commission wanted to issue a permit. You don't have to. You can continue it. we can get more information from them on, you know, whether this fully meets the standards, but I believe it it likely

51
00:37:21.599 --> 00:37:36.000
does. >> Magna. >> Yeah. >> Um just for for our understanding, could you maybe um go up and show us where the grass is existing now? >> Yeah, sure. So, um

52
00:37:36.000 --> 00:37:52.160
there's a patio here. Um this is gr this is right along here was a a flower bed. Okay. Um and all this out here is grass. Um

53
00:37:52.160 --> 00:38:08.079
it's tough to say. Uh this is all grass down here. The grass actually goes all the way down to the stream. Um >> so it's grassland from the house to the stream. >> Excuse me. >> Grass from the house to the stream. >> Yeah, pretty much. Um that's fine.

54
00:38:08.079 --> 00:38:25.040
>> You know, it does slope down a little bit, you know. Um, and what he's done is he's put down the silk fence 100 ft before the stream and uh to prevent anything from possibly happening when you know they they dig up uh the house

55
00:38:25.040 --> 00:38:43.280
and uh and put in a new foundation. Um >> I have an area willing to answer all the question >> just do whatever you'd like. >> No, it's fine. I just want to visually see it so I can say I looked at it. >> Yeah. So, I mean it um it goes out quite

56
00:38:43.280 --> 00:39:00.560
a ways. Um so where's the stream here? Does this is this a stream? >> No. >> That's a cell pen. So what is this? A stream? >> That's probably the stream there. >> Okay. So yeah, basically it goes right down. This is all lawn here. Uh there

57
00:39:00.560 --> 00:39:17.839
are, you know, maybe a couple apple trees here. There was a row of uh bushes here. Um, and up here is just, you know, this was all I'm sorry. >> I'm sorry. I'm gonna pull up the uh

58
00:39:17.839 --> 00:39:42.640
>> Is this like uh the weather where you get the green I'm supposed to plant? No. >> To get these things out of the way. >> Okay. So you have the house here. >> So yeah, this is the house. This comes down. The screen must be Is this the property line?

59
00:39:42.640 --> 00:39:58.000
>> Sorry. >> It's hard to manipulate this on this laptop. >> So the yellow is the property line. >> This right here is the portion of the house that's going to be rebuilt and your stream [clears throat] is done. >> And this part this this part is the

60
00:39:58.000 --> 00:40:14.800
kitchen. Um, you know, the roof and the walls will come down, but the foundation itself on the on the kitchen will remain. Um, this will be demolition here. Um, so this is all lawn down here. I

61
00:40:14.800 --> 00:40:29.920
mean, it doesn't look like it because you got the trees, but it actually comes down where is the stream here. So you can kind of see here the shadowing is going to the to the north here, but you can see the lawn comes down to about here.

62
00:40:29.920 --> 00:40:44.880
And the closer you get to the stream, we're not talking about we're talking like just mowing of, you know, all the plants and everything. So it is a little bit more natural towards there, which is good. It provides a little more buffer for the stream. >> And this over here, so we have the uh

63
00:40:44.880 --> 00:41:02.280
detached garage and then there's a shed. And then these are this is just a a giant um vegetable garden. And >> this right here is the location of the addition. This is like the master. >> So the fence must be

64
00:41:02.319 --> 00:41:18.800
>> I'm assuming >> still fence goes right around here basically around. >> So the stream must be about here because it's right it's pretty close to the border. Is that correct? >> I could pretty much show you exactly where it is off of off a measurement here. measuring from here.

65
00:41:18.800 --> 00:41:35.040
Stream is right about here. >> Okay. >> So, it runs this way. It comes out of Reed Street and goes >> it actually there's there's I believe a a culvert that goes underneath 27 and then it comes through

66
00:41:35.040 --> 00:41:54.000
this this part here. And then there's another culvert that goes under Reed Street. if you need. I mean, I can show you pictures. I took pictures this morning. >> This was this this satisfied my inquiry. >> And I do have pictures from the site

67
00:41:54.000 --> 00:42:10.319
visit if anybody wants to see anything in particular, >> but you probably already seen. >> So, Matt, it sounds like this would be a negative three DOA. >> Yeah. >> Um, >> anyone have any? >> No, I'm ready. >> No, we're ready. you might consider, you

68
00:42:10.319 --> 00:42:25.200
know, if you were going to issue a negative three, you'd probably put special conditions on it, just mandating that they maintain ESC and, you know, erosion any >> site conditions throughout, which really doesn't, >> it's an enforcement issue anyways, but it would probably help get the point

69
00:42:25.200 --> 00:42:41.760
across to the builder, >> but we, you know, we talked about it already. He's already taken steps just to make sure, >> but just to hit the language on it. >> Yeah. >> All right. I'll um I'll make a motion to issue a negative3 DOA with special conditions as described. >> I'll second.

70
00:42:41.760 --> 00:42:58.480
>> Um made by mid Jim so in Brian. All those in favor? >> I no. All right. Motion passes. Take over. >> Thank you. >> We'll be in touch tomorrow. >> It means you're good. >> It's good. >> It sounds bad, but it's good.

71
00:42:58.480 --> 00:43:12.880
>> It's just a process. >> Very much. >> Yes. >> We'll be in touch tomorrow. will explain everyone. >> Okay. >> All right. So, for the record, we issued a negative 3D A with special conditions as described. That motion was from Jim

72
00:43:12.880 --> 00:43:29.839
and seconded by Brian. Uh, it was 5 to 0 to zero. Uh, we'll move on. >> Thank you very much. >> Thank you very much. Good. Appreciate you hearing me. >> Thank you so much. >> Sorry for the speaking. >> No, fine.

73
00:43:29.839 --> 00:43:46.240
>> Is that clock right? We're at 653. So, we get into public hearings. >> Yeah. >> Excuse me. We're willing and able to do anything. >> Oh, no. You're good. >> You're good. You just got exactly what you needed. Okay. >> Yeah. I'll send you an email tomorrow. I'll explain how everything will work.

74
00:43:46.240 --> 00:44:03.839
You'll be in good shape. >> Thank you all. >> Sure. >> Well, good luck with you. >> Sorry you had to go through that. >> I hope it goes quickly. >> Yes. Good luck. >> Thank you very much. >> Have a good one. >> All right. All right, we're going to move on to public hearing section A74

75
00:44:03.839 --> 00:44:20.880
Ring Road, map 61, lot 32, notice of intent. I will now open a hearing for the notice of intent submitted by Collins Civil Engineering Group LLC on behalf of the applicant, Patrick Ryan, for a septic system upgrade for a residential home within the 100 foot buffer zone to Inland Wetland Resources

76
00:44:20.880 --> 00:44:38.400
Areas at 74 Ring Road. Uh where this is the first meeting on this proposal, we'll hear from the um hear an introduction from the applicant. They're here. >> Yep. We have uh George Collins online. >> All right, Miss Collins, please um unmute yourself, identify yourself um name and address for the record, and

77
00:44:38.400 --> 00:44:55.760
then um please proceed. >> Yes. Uh my name is George Collins, registered professional engineer from Collins Civil Engineering Group out of West Bridgewater. Um representing Patrick Ryan for a notice of intent associated with the

78
00:44:55.760 --> 00:45:13.920
replacement of an existing septic system. Uh, the project has been issued D file number 37-976. Um, and uh, if you'd like, I can um, share my share my screen and go over some

79
00:45:13.920 --> 00:45:35.119
specifics or whatever the chair would like. >> Please, >> let's see here. Um, can you enable sharing or or unless you wanted to bring up something that I the plan that I already submitted? >> I think it's Is it not enabled?

80
00:45:35.119 --> 00:45:50.400
>> Okay, here. Wait a second. I think I'm here. >> It usually is. >> Here we go. >> It's been a weird >> Can can anybody see that? >> Yes. >> Um, yes. So basically um

81
00:45:50.400 --> 00:46:06.960
uh this is this is Ring Road. The property uh the property is on the east side of Ring Road. Um this is the house here. There's a bordering vegetated wetland showing green that >> can zoom that in a little bit so that um

82
00:46:06.960 --> 00:46:24.960
>> I'm zooming. Okay. I'm sorry. >> Just get past the details. >> Okay, that's good. >> Okay, there we go. Uh yes. So again, so we have a bordering vegetated wetland that uh wraps around the property. Um

83
00:46:24.960 --> 00:46:41.599
the um the 30ft no disturb um zone is shown in red. The uh magenta line is the 50ft buffer and then the um the green line is the 100 foot buffer

84
00:46:41.599 --> 00:46:57.359
zone. So, as you can see, the entire properties uh essentially in jurisdiction with the exception of the uh the small area up here by the street. Um, currently there's a failed septic system in the backyard right here. Um,

85
00:46:57.359 --> 00:47:14.960
and uh what we did is this is actually a uh this is the driveway. This is so the the new septic system is actually going under the driveway. Um and um we can we dug it dug two test holes. Uh it was really good uh sandy

86
00:47:14.960 --> 00:47:32.560
soils and we were able to uh set this up. So we rerouted the plumbing come out the side of the house. We were able to actually place the new septic tank outside of the 50ft jurisdiction uh 50ft buffer. And then we have the uh actual

87
00:47:32.560 --> 00:47:48.960
uh septic system again under the driveway. Um, also outside the 50 foot buffer zone. Um, the these uh the system meets all the uh state title 5 requirements. Um, I I do uh it is my

88
00:47:48.960 --> 00:48:04.960
understanding I do realize that there is a um the town has a 100 foot uh requirement uh in particular for new construction to make sure that all the septic components are outside of the 100. But obviously uh this is an

89
00:48:04.960 --> 00:48:20.079
existing property and the entire the entire site is uh within the 100 foot jurisdiction essentially. Um I we do this orange line is the uh proposed erosion control

90
00:48:20.079 --> 00:48:38.720
and um so basically uh um so basically I believe that we're presenting something that is uh uh you very reasonable that we're again we meet all the state requirements but due to the pre-existing non-conforming

91
00:48:38.720 --> 00:48:54.960
conditions uh you know we're we're not able to meet the 100 um setback requirement. I'd be more than happy to answer any questions that the board may have at this time. >> All right, we'll open it up uh for

92
00:48:54.960 --> 00:49:09.599
discussion. Matt, do you want to do you want to start off? >> Sure. Yeah. Um I might repeat some of what he just said, but we have a buffer zone only project involving the replacement of a failed septic system. Existing system consists of a tank and leeching pit entirely within 50 feet of

93
00:49:09.599 --> 00:49:24.880
BVW and at least as close as 25 ft. Uh the replacement system is proposed in a different part of the property underneath a paved driveway outside of the 50ft BVW setback. Proposal also increases the distance between the system and groundwater. It uses pre-cast

94
00:49:24.880 --> 00:49:40.400
concrete leeching chambers. Uh BO has approved the project under title 5 with a mandated deed restriction. So the existing house is two-bedroom and it is deed restricted now and that is recorded uh with that it will stay a two-bedroom.

95
00:49:40.400 --> 00:49:59.440
Um failed systems proposed to be abandoned and filled in. For the record, the wetlands report says there's an offsite vernal pool to the north, but I see no evidence of that on GIS, only to the west off of Milican Drive. Um, when I looked at the area around flags uh six

96
00:49:59.440 --> 00:50:16.160
through two, which is this, you know, finger up here, I initially thought that could potentially be a vernal pool, but then as you walk down into it, you see it is connected to the rest of the wetland around. And while connection doesn't mean it's not a vernal pool, it didn't jump out to me that that was likely a vermal pool. It didn't seem to

97
00:50:16.160 --> 00:50:32.559
have that, you know, confined basin characteristic. Um, so it may hold standing water in that small area seasonally, but I didn't have anything that jumped out as, you know, that that would definitely be a vulnerable pool or highly likely be a vernal pool. Um,

98
00:50:32.559 --> 00:50:49.440
there is intact vegetated buffer between those wetland flags and the driveway. Um, though there was a pile of dumped landscape debris along an informal trail that should be cleaned up. Uh, conservation posts in that area might help prevent further dumping or encroachment. uh straw waddle and street sweeping are

99
00:50:49.440 --> 00:51:05.839
proposed as erosion sedimentation controls. Um at the site visit um I explained that the commission would probably want to see 12in silt sock in place of the waddle given the amount of disturbance that you'll see back there. For the record also the applicant says the proposal was an upgrade of the

100
00:51:05.839 --> 00:51:21.200
septic system but explained that's only as it relates to the language found in title 5. Um, for the commission's purposes, this appears to be simple replacement of a failed existing system without increasing [clears throat] flow.

101
00:51:21.200 --> 00:51:36.800
So, with the recorded deed restriction and the moving of the components further from the wetlands and increasing distance to groundwater, the project appears to meet the standards of KWPR 10.02B2, Note 2B2 where it says that the minimum 100 foot setback requirement shall not be required when a replacement

102
00:51:36.800 --> 00:51:53.520
system is necessary provided that no alternative location is available on the lot or other parcel under the ownership or control of the owner of the system [snorts] proposed for upgrade and that the system is placed as far as possible from the wetland resource areas. And it also meets the standard under three

103
00:51:53.520 --> 00:52:10.240
where it says should a replacement system also constitute a substantial enlargement and increase in flow from expanded use of the existing system, the commission may require that the minimum 100 foot setback distance be observed. Um in this case again there appears to be no increase in flow. Um, if you have concerns about the potential for BO to

104
00:52:10.240 --> 00:52:25.920
dissolve the deed restriction, which I think they'd be unlikely to do, you may consider a perpetual condition stating that any addition of bedrooms or other construction or activity that could cause an increase in flow to the system must be reviewed by the conservation commission through an official filing. Through that filing, the commission

105
00:52:25.920 --> 00:52:41.760
would likely require alternative technology treatment. uh because I think the commission understands that that is the best case scenario for replacing a septic system would be that you would use something that has more treatment to protect the wetlands. Um but the

106
00:52:41.760 --> 00:52:57.839
commission I think in a lot of cases like this would lack the legal backing to force somebody to do that. So any questions for me? >> Um might have some come back. Let's open it

107
00:52:57.839 --> 00:53:15.760
up for discussion. Um, if anybody has any questions that they'd like to go, >> all right, I'll I'll I'll get started. So, I I just had some questions um specifically to the location of the new um tank and field. Um, so some of the

108
00:53:15.760 --> 00:53:32.480
language that we just heard uh indicated that this had this is supposed to achieve a certain setback um where it's a failed system. there's an exemption to that rule um if there's no increases. Right. So, I have two concerns. One,

109
00:53:32.480 --> 00:53:50.319
it's the deed restriction because deed restrictions can get removed. Um so, I would like to see something a little bit more um secure um on that avenue. And then I would like a clarification as far as alternative design of um discussing the

110
00:53:50.319 --> 00:54:06.319
placement of the system. uh because looking at what we see, it looks like we could probably get to the opposite side of the house and I'd like to hear why why we're not uh doing that from the engineer. So, >> Mr. Collins,

111
00:54:06.319 --> 00:54:22.480
>> um basically we were trying the this location over here is heavily wooded. So rather than taking down a bunch of trees over in this location and still not meeting the 100 foot requirement, we basically uh put the system under the

112
00:54:22.480 --> 00:54:39.040
existing um driveway just again so we would not have to do any tree removal. >> Okay. >> I thought also I talked on the on the site with um one of the other engineers about the well being there. Now on the plane it says existing well not in use.

113
00:54:39.040 --> 00:54:55.760
Yeah, it's right here. Is there a well in use or is it >> It says not in use, but is still a well there. So, I thought, sorry, I didn't really push too hard on that for those two purposes was the [cough and clears throat] well and the fact that there were mature native trees all along that that side.

114
00:54:55.760 --> 00:55:09.680
>> They would like to maintain the ability to use that for irrigation. And under title 5, you do need a 25 ft setback if they did want to u you know uh use that in the future for irrigation. And again,

115
00:55:09.680 --> 00:55:28.720
that's there's a 25 ft uh setback requ right right this corn that's an existing. So basically there was that was the original water source for the property >> and what they did is they bypassed it and put in town water but the well is still there in intact.

116
00:55:28.720 --> 00:55:45.760
>> Okay. That that right there that answers my question as far as location. So >> Matt, >> no just um sort of bringing up again the conservation posts. I think putting conservation posts at the existing wood line, particularly where, you know, it's

117
00:55:45.760 --> 00:56:03.520
along the side of this finger of of wetlands over here where we saw the dumping and the little trail would be beneficial, but I mean, it could stretch along the entire woods line on the property to protect the existing vegetated buffer, you know, and I think that would be something that would um be

118
00:56:03.520 --> 00:56:19.119
long-term beneficial and make this pretty easy. And what's the resource area behind the um flags? >> Uh BBW. >> Okay. No streams back there close or anything? >> Not close enough to the project that I could tell. No.

119
00:56:19.119 --> 00:56:34.319
>> Are there any questions um from Matt or the engineer? >> No. >> No. But just uh and then Matt mentioned a couple things earlier. We did change the erosion control detail to uh 12in waddle. And then uh and then we are the

120
00:56:34.319 --> 00:56:50.559
plan does show the removal of uh the consum some construction materials that and these are items that were brought up uh during the site visit that we had we actually have amended the plan. >> Okay, just for clarification on two

121
00:56:50.559 --> 00:57:09.839
things that was 12-in waddle or 12-in silt suck. >> Um sorry, let me see here. Uh I my current detail calls out waddle straw waddle but obviously if we can absolutely change that to uh silt sock

122
00:57:09.839 --> 00:57:25.920
if that's what you'd prefer. >> Yeah. So I I think we could put just as a special condition 12-in silt sock, but it would be good to put it on the plan just so that if a contractor gets it, they don't do the wrong thing and then they're mad at me when I make them put silt sock out. >> Yeah.

123
00:57:25.920 --> 00:57:41.119
>> Yep. I can I can add that to the plan and I I do know the who the the contractor that's doing the work has been selected so I can actually okay >> also uh get him in the loop immediately. >> And then the dumping that I saw was um

124
00:57:41.119 --> 00:57:59.680
or some of the the sort of landscape debris that I saw dumped was closer to wetland flags two and three >> um up in this area. >> Yeah. So, if the commission has no concerns and they think they could issue orders and conditions on this, my

125
00:57:59.680 --> 00:58:15.599
recommendation would be uh special conditions being the language that I mentioned supporting the deed restriction, the requirement for 12-in silt sock as ESC, the removal of all dumped landscape debris, and conservation posts in perpetuity along

126
00:58:15.599 --> 00:58:31.839
the edge of the existing yard where it faces the BBW. Let me >> Okay, so we're ready to close. >> We got to close the Let's Let's just go through the special conditions first. >> No, I thought he just >> Well, he just gave us what he want. Is there any Do we have any other feedback

127
00:58:31.839 --> 00:58:48.240
from Matt on that? >> Okay. All right. Are we pretty confident that we're ready to close the meeting um and take a vote? >> So, do I hear a motion? >> I move that we close the hearing. >> All right. So, we have a motion by Maryland, second by Dot. All those in

128
00:58:48.240 --> 00:59:05.359
favor say I. I. Opposed abstained. All right. So we close the meeting uh five to zero. Okay. >> Now do I hear a motion? >> So I would make the motion that we approve the project with the special conditions mentioned. And do you want me to run through them again or >> um No, it was okay. I mean it was

129
00:59:05.359 --> 00:59:20.960
recorded. So Okay. So we have a motion from Maryland to issue um to approve the NOI issue the permit with the special conditions as stated. Do I hear a second? >> Second. Second by >> Brian. Mr. Mr. Chairman, if I may, if I may. [snorts] Uh I'm not I uh just

130
00:59:20.960 --> 00:59:37.839
procedurally are we supposed to just make sure that nobody in the public has any questions or comments? >> It's probably a good >> That is true. We didn't do that. >> We didn't open it to the public. >> Um we're going to step back for a moment and open to public the public hearing. Uh open to the public. Does anybody

131
00:59:37.839 --> 00:59:53.760
wants to be heard on this? Um >> please come forward. Raise your hand. >> You have a raised hand online from Pine Dubois. >> Pine. >> Hi there. I thank the engineer. Um, uh, I just I I just can't, it's hard to read

132
00:59:53.760 --> 01:00:10.240
the plans online. I I don't know what the elevation of the leeching field is or what kind it is. Um, I'm just concerned that the water table looks like it's at about elevation 40 45 and a half or something like that. So, I I was

133
01:00:10.240 --> 01:00:25.520
just concerned about whether the stone is sufficient. I I can't say that I've, you know, um evaluated it at all, but I I would ask the commission take a take a a a look at that. I I very much like the

134
01:00:25.520 --> 01:00:41.760
restricted uh the restriction on the on the um bedrooms. I I think that's really important. Then I would maybe even suggest that um uh you know maintaining that tree buffer would also be something

135
01:00:41.760 --> 01:00:58.079
that the commission could request in its um order conditions. Thanks. >> Thanks. >> It look it looks like everything is going to either Barisbrook or Jones Riverbrook and it and it's feeding Cranberry Bog. So I I think the the

136
01:00:58.079 --> 01:01:15.760
level of nutrients is important. >> Just based on what I could see, I I there was a comment about 4T separation between the lower extent of the leeching field stone and then there was a bed of stone and then the leeching field above it, but I'll let the engineer um discuss

137
01:01:15.760 --> 01:01:32.799
that. >> Yes. So we do have uh 4 and 1/2 ft of separation and uh I'm sorry uh where is it? We have um we have uh 4.2 2 ft of separation. Uh 4 feet is required. And I apologize the the current plan does call out a 12 in

138
01:01:32.799 --> 01:01:49.520
diameter silt sock. So I I that uh I was mistaken. Uh the the plan uh revised 61926 which should be the current plan of record does call out the silt sock. I I apologize. So that was I was incorrect

139
01:01:49.520 --> 01:02:05.440
when I said straw wall. >> All right. I might need to have you send me that again. I'll I'll double check and see if we have that on file. I thought the latest one that I had didn't have it yet, but either way, we'll throw it in there as a special condition just to make sure. >> Correct. Thank you. Yeah, and the contractor does have that this current

140
01:02:05.440 --> 01:02:22.319
plan, but I'll I'll reiterate it with him. >> Okay. Um, is there any other comments from the um public aside from what Pine had to ask? >> All right. So Pine's questions, I

141
01:02:22.319 --> 01:02:38.640
believe, was um was based on the the height uh the depth of the system. It's um it's above the 4T required and this is a replacement system. So I I don't know that there's much more that can be done on that side of it. Does anybody have

142
01:02:38.640 --> 01:02:55.440
any questions about >> And you were are to her second point already putting in conservation posts along the existing >> woods line. Now, I was not talking about on the I would say southwestern side of the property closer to the existing well. I

143
01:02:55.440 --> 01:03:13.200
was just putting that along the portion as it faces the VBW. Does that make sense? >> So, along the edge of the cleared area next to the driveway and then along the backyard leading down to the southwest. I was not bringing anything up towards

144
01:03:13.200 --> 01:03:29.440
Ring Road. I think that makes sense. >> You mean just another leg of it? Yeah. I wasn't bringing anything up towards >> you L-shaped, right? >> Yeah. >> Yeah. >> So, he's L-shaped versus U-shaped. >> That makes sense, right? >> Yeah. >> Y Okay. Okay. >> That works for me. >> Is there anyone else that would like to be heard? >> I think that's it.

145
01:03:29.440 --> 01:03:44.400
>> All right. So, we're going to close. We're going to take a We're going to have a motion to close again. >> We'll do it clean. >> Okay. Motion to close. >> All right. Motion by Marilyn, second by >> Second. >> Brian. All those in favor? I >> opposed. Abstained. >> That motion carries to close five to

146
01:03:44.400 --> 01:04:00.480
zero. Now perhaps you'd like to make remake your motion. >> So motion to approve with special conditions as stated. >> Okay. So we have a motion to uh approve the NOI issue the permit with special conditions as discussed by Marilyn. Second. >> Seconded by Brian. All those in favor

147
01:04:00.480 --> 01:04:17.119
say I. I. Opposed. Abstain. >> All right. That motion carries 5 to issue the permit. >> All right. >> Thank you very Thank you very much. Uh thank you Matt for your guidance. Uh and um just just quick question uh when do you think the order of conditions would

148
01:04:17.119 --> 01:04:33.119
actually be issued? Uh just out of curiosity. >> So uh it'll be prepared for the commission to sign at their next meeting which is the second Wednesday in August which is the 12th. >> Okay.

149
01:04:33.119 --> 01:04:48.079
>> Thank you very much. >> If that's a hardship, >> shoot us an email and we'll try to speed it up. But that's typically especially because we have three weeks now in between uh in between meetings. So if that's a hardship, let me know. I can see what I can do. >> Okay. Okay. Thank you very much. I

150
01:04:48.079 --> 01:05:04.880
appreciate your time. Good. >> All right. We will move on to section B 18 Smith's Lane, map 67, lot 82-1. This is a notice of intent. Uh, I will now continue a hearing for the notice of intent submitted by Southshore Survey on behalf of the applicant, Ronald

151
01:05:04.880 --> 01:05:22.000
Vernazaro, for the proposed construction of a single family house and associated utilities within the 100 foot buffer zone to an inland wetland resource area and the 200 foot riverfront area at 18 Smith's Lane. Matt says the applicant has requested a continuence to August

152
01:05:22.000 --> 01:05:36.079
12th. >> Yes. >> Okay. Do I hear a motion to continue? >> All right. We'll have a a motion by Megan, a second by Brian. All those in favor say I. I. Opposed. Abstain. >> All right. So, we will continue on

153
01:05:36.079 --> 01:06:00.400
August 12th, 5 to Z. All right. Move to section C. [clears throat] This is Drew and Sber Avenue's notice of intent. Sorry. Um, I will now open a hearing for the notice of intent submitted by Strong Tree Engineering on behalf of the

154
01:06:00.400 --> 01:06:16.400
applicant, the town of Kingston, for the construction of storm water improvements to collect, treat, attenuate storm runoff uh, storm water runoff with lands within land subject to coastal storm flowage and various buffer zones to coastal wetland resource areas in the

155
01:06:16.400 --> 01:06:31.520
roadways of Drew and Sver ABS. Uh Matt, as this is the first meeting, are we uh are we gonna hear a proposal from the applicant? >> Yeah, we have uh well, I guess I am the applicant, but we have our engineer

156
01:06:31.520 --> 01:06:47.599
Justin Lamaro here ready to present. >> Uh Justin Lamro, strong tree engineering for the applicant. Uh the Kingston conservation. So this project wouldn't even be in front of you if it was for the hard work of your conservation department who was

157
01:06:47.599 --> 01:07:02.960
able to uh get the grant from CCM to do this project. So it is a great project. Uh just so we get situated uh we have Deleno AB to the south, we have Rocky Nook Point to the north. Um

158
01:07:02.960 --> 01:07:20.319
the resources that we have that associated with the rocket nook point are uh coastal beach, salt marsh, title flats and land subject to coastal storm flowage. Our project uh was to

159
01:07:20.319 --> 01:07:36.000
mitigate storm water on Drew and Sver Avenue, both finger roads that head head north off of Deleno. Um the approach they're about 600 they're both about 600 ft in length. So the

160
01:07:36.000 --> 01:07:51.839
approach was to break that up into 300 ft uh drainage areas uh which is a standard for uh storm water collection. U so we have two types of storm water systems that we're

161
01:07:51.839 --> 01:08:07.599
proposing. The upper regions are going to be inlets, so catch basins to collect storm water. >> Which page are you on? >> Um, I'm on C3. >> There we go.

162
01:08:07.599 --> 01:08:22.960
>> Yep. So, drop inlets on both sides of the road. We do have water and sewer in the road, so going deep in this area makes it difficult. So, we we're going to go with drop inlets to water quality structures. So all of our treatment will happen in the water quality structure

163
01:08:22.960 --> 01:08:39.120
which is downstream from the catch basins. And then we have underground recharge chambers. So concrete chambers with stone. So pretty standard storm water. We do have a high-end hydrodnamic separator which is the water quality. And that's for both systems. And that's

164
01:08:39.120 --> 01:08:54.719
approximately 300 ft from Rocky Nook upstream. Down at the ends of the streets, we have some pavement, some extra pavement that we're removing, and we're going to put some stepped bio retention systems

165
01:08:54.719 --> 01:09:12.640
similar to the Deleno or Delano uh the systems that were installed over there. Uh these will accept runoff uh currently runoff just flows untreated right to the bay. So they'll accept runoff with four bays to collect trash and debris and

166
01:09:12.640 --> 01:09:29.839
sediment. They'll overflow then into cells. There is a good gradient along the roadway. So we have we have some stepped um cells which we're we're accomplishing with curve to maximize surface area for these fire retentions.

167
01:09:29.839 --> 01:09:47.520
Um both systems do have overflow recharge to get even more storage uh for the systems and more treatment. The upstreams are sized for the two-year storm. They'll fully sell three three and a half inch rainstorm. The

168
01:09:47.520 --> 01:10:03.183
downstreams are sized for the water quality storm. So the first inch of runoff over impervious and then they will overflow up to the 100year control up to the 100year. They're designed to control the 100year with with the curb

169
01:10:03.183 --> 01:10:18.800
[snorts] from upstream from the entire uh drainage area which includes portions of Deleno. Uh we have native plants. We have some beach grass um blue stem various native plants that will be in the buyer attention. We als we have some

170
01:10:18.800 --> 01:10:33.280
stone overflows just to control velocities and then we have erosion control silt sock around uh the limit of work. So I'm happy to answer any questions. >> All right, Matt. Um,

171
01:10:33.280 --> 01:10:50.719
>> I think on also we have on both of these and maybe I think it shows it better on a different sheet, but we had the walkway past >> each one to maintain the existing path to the existing. We're not changing the

172
01:10:50.719 --> 01:11:05.679
steps on either one of these. Right. Even on Drew, we're not changing the steps. It ends at the top of the steps. >> Correct. So you still both streets have access steps that are just within the old road layout put in by somebody

173
01:11:05.679 --> 01:11:22.480
decades or you know whatever ago. Um and we're going to this has been designed to basically believe it's grass right it's going to be right now you have grass that comes up to the road that's within the road layout. I believe the plan is

174
01:11:22.480 --> 01:11:39.040
to have grass next to the storm water feature with plants separating that grass walkway so people aren't walking in the storm water feature and then some sort of shrubs on the other side to sort of separate from someone's yard. >> I think with our discussion with CCM

175
01:11:39.040 --> 01:11:57.280
they wanted it distinguished with plantings. So the walkway will will be have plantings along it. >> Yeah, >> obviously native plantings that tolerate salt. And then I did have somebody come into the office today with concerns about maintaining access over time. Um,

176
01:11:57.280 --> 01:12:15.360
you know, not losing access completely. I know when we did, not when we did when the Delano I think it's Delano. >> He's not a Kingston. He's not a Kingston guy. Sorry. >> I'm I'm almost a Kingston person at this point. I think it's Delano. Um, when the

177
01:12:15.360 --> 01:12:32.719
Delano BMP was done, the area residents didn't like the change in access. It had gone from a ramp to a set of stairs. The stairs weren't something that were really um, stable and over time had degraded. We were able to fix that with

178
01:12:32.719 --> 01:12:48.960
um, earmark money from the state and put a iron handrail in. And I think that goes a long way. I mean, people still aren't, you know, I wouldn't say every single person is entirely happy with it still, but it makes it a lot more stable just to be able to hold on to something

179
01:12:48.960 --> 01:13:04.719
on the way down. These stairs, I don't know that the town's going to be maintaining the stairs anymore than they do now, which is we don't. >> Um, and if we can include some version of a handrail in there, I think some people would be happy with that. Um it's just a matter of whether or not [snorts]

180
01:13:04.719 --> 01:13:19.679
then that becomes something that means that we own the stairs and we maintain them with I don't know but it's something worth thinking about that at least with a set of handrails on these it makes it more stable for people and then it's less concerning the condition

181
01:13:19.679 --> 01:13:39.760
of the steps over time. >> Yeah. Currently there's no proposed change to the granite >> right >> steps but >> yeah granite on one and the other one is is concrete y >> yeah sever is concrete >> yeah um so I can really quickly go

182
01:13:39.760 --> 01:13:55.760
through say that we have sort of a mix here we have some improvements proposed out of jurisdiction as Justin said the initial infiltration is happening pretty much halfway up the road uh which is good right now there's nothing on either street to control any storm water

183
01:13:55.760 --> 01:14:11.360
whatsoever. Um, so anything that is in anybody's yard or in the road, any oils, fertilizers, dog waste, anything just gets out into the bay quickly. Um, very sight limited here. We really just have

184
01:14:11.360 --> 01:14:28.960
the road layout. That's it. Um, we did send out mailers just seeing if anybody was interested in talking about an easement or something and didn't get any takers. Um, so we were very limited in the space and as Justin mentioned the depth. So this isn't a system that's going to infiltrate massive storms. What

185
01:14:28.960 --> 01:14:44.880
it's going to do is particularly with smaller storms, it's going to infiltrate the first flush, which contains the majority of the bad stuff. Um, and also provide, like he said, control measures for the larger storms. So you're not just getting

186
01:14:44.880 --> 01:15:01.600
erosion, you're having a controlled release, which is good. Um, two trees do have to be removed as part of this project. Uh, one of them is a Norway maple, which is, uh, not a desirable species. It is not a longived species, but I'm sure the person who

187
01:15:01.600 --> 01:15:16.960
lives next to it and is be, you know, getting some shade from it might not like that. It is within the road layout. Um, and it is right down by the coastal bank. Um, similarly on Drew Avenue, there's a Eastern Red Cedar in almost

188
01:15:16.960 --> 01:15:32.880
the same location that uh will need to come out as part of this project. Um, so not ever really good removing trees, particularly on the coastal bank, but with the benefit of this project and the amount of native plants that are going to be replacing them and things that

189
01:15:32.880 --> 01:15:47.840
stay relatively short and not necessarily damaging to the coastal bank if they were to tip over. Um, overall I would say a benefit. Um, but there is potential that, you know, we could always replace a tree with something that could grow up higher if somebody

190
01:15:47.840 --> 01:16:05.360
wanted that. Um, [snorts] proposed work will decrease impervious surface within jurisdiction by approximately 31 square feet at the end of Drew Avenue and approximately 314 square ft at the end of SVER Avenue. It will be an overall benefit to Kingston Bay. Currently untreated storm water

191
01:16:05.360 --> 01:16:21.280
flows down both streets directly into the bay, carrying trash, sediment, and other pollutants with it. Proposed improvements will remove these pollutants before storm water reaches the bay, constituting a significant improvement over existing conditions. Um 12in diameter silt sockets proposed for

192
01:16:21.280 --> 01:16:37.280
erosion sedimentation control between the work area and the bay. Proposed work appears to meet the standards of KWPR relevant to land subject to coastal storm flowage by decreasing flood water velocity and volume and by attenuating and infiltrating storm water runoff and

193
01:16:37.280 --> 01:16:52.560
because it will improve the ability of that land subject to coast to storm flowers to prevent pollution through filtration and infiltration. It appears to meet most of the standards of KWPR related to storm water systems. Um obviously we don't have the 40 feet

194
01:16:52.560 --> 01:17:08.800
storm water systems but there needs to be a storm water system here and there and there isn't one. So um we don't have an O andM plan yet uh but it will be submitted um before a COC is issued on this and this we've already heard from Justin about the sizing of it which does

195
01:17:08.800 --> 01:17:26.239
meet all of our regulations as well. Um, the last thing for we sent out 300 foot of butter notifications on this. Um, if everybody remembers when the bylaw was redone a couple years ago at town meeting, it called for 300 foot of butter notifications, but our

196
01:17:26.239 --> 01:17:43.840
regulations still say 100 feet. So, we haven't updated that. We've only been requiring 100 feet since we haven't made that change yet. Um, but with this, because it's our project and because it was on Rocky Nook and there would be big changes in there, I felt like we should send out as many notifications as possible. Um, for people who live

197
01:17:43.840 --> 01:18:00.239
directly next to these storm water features that are down by the coastal bank, there will be changes. Um, you know, most of this area, they're really tight lots and a lot of people's yard is in the road layout. So, the good thing

198
01:18:00.239 --> 01:18:16.239
is for the most of the street, there's not going to be disturbance at all. But in the areas where there will be disturbance, there may be situations where somebody might lose lawn space, somebody might lose a parking spot um if the parking space has been within the road layout. And in both of these

199
01:18:16.239 --> 01:18:33.360
situations, we have barriers at the end of the road to prevent um somebody from driving into the BMPs, driving into the bio retention areas. Um, so there will be basically the end of the road is being moved closer to um the upland

200
01:18:33.360 --> 01:18:49.679
there just by way of needing to protect what's being built there. Um, and we did discuss this with the highway department as well because for storm purposes in the winter, they won't be able to plow all the way down the street to the bay.

201
01:18:49.679 --> 01:19:05.440
Um, which isn't ideal anyways for, you know, water quality purposes. We don't like snow being dumped directly in the bay or plowed directly in the bay. But essentially what they said is that there isn't a better way to do what we proposed and they can work with it. Um

202
01:19:05.440 --> 01:19:20.320
they said this past winter it would have been difficult based on the amount of snow we got. Most winters we don't get that much snow. They said if they have to send a machine down there to scoop snow and get it out of there, they'll they'll do that. Um so I think we've sort of covered every angle of this. it

203
01:19:20.320 --> 01:19:36.480
meets all of our regulations and WPA. Um, it may be disturbing to some of the neighbors. Um, we've put as much notification out there as we can. We've had a few people reach out. Um, and we'll keep interacting with people throughout the process just to see if we can keep as many people happy as

204
01:19:36.480 --> 01:19:59.360
possible while still being able to get the project done. >> We'll open up the commission. Uh any any comments or questions for either the engineer Justin or or Matt on the presentation of this? >> No, several of us had an opportunity to

205
01:19:59.360 --> 01:20:14.880
go on the sidewalk yesterday and and see the layout and have it really explained and >> it looks like a good improvement. >> It's pretty tight down there. >> It's too tight. Um we'll open up to public comment. Uh does anybody who has

206
01:20:14.880 --> 01:20:30.080
any questions or would like to be heard on this? Um please step up. Um identify yourself. >> Nope. Just go to the mic. >> There's a microphone. Sorry. Um name and address please. [snorts]

207
01:20:30.080 --> 01:20:46.080
>> Jean Sullivan 22 Delanov. >> My concern is um first of all um why were those two specific sites proposed? Why were they looked at first for grants when there's

208
01:20:46.080 --> 01:21:02.640
a major storm water issue on Cedar Street which is 100 ft from where you people looked from Sver and uh Drew the roads being eaten up and I'm sure all the construction trucks that are going

209
01:21:02.640 --> 01:21:20.480
to be doing this project like every other construction truck that does any work down in that part of the nook goes down Cedar Street and tears up that three and there's a right now it's probably the biggest storm water issue in Kingston. There's there's a swimming

210
01:21:20.480 --> 01:21:37.600
pool in front of 16 um Cedar Street right now which isn't being addressed. It's been there for years. You will you guys put a sewer project a major sewer construction project there. You regraded the street,

211
01:21:37.600 --> 01:21:53.440
so the water just sits in a 50-foot area. There's no catch basins. There's no storm drains. You people keep telling the people that live there that they're in charge of fixing this street that everybody in Kingston uses. It's not a

212
01:21:53.440 --> 01:22:08.320
private, they consider it a private way with public access, but this is not a dead end street. This is a major free throughway where fire trucks, no one can back up if they go down. Ca Street. They have to come down Cedar Street, go up

213
01:22:08.320 --> 01:22:26.880
Delano, back down Cedar Street, um, Drew Aav, CV rev, all the streets there. They any fire truck, ambulance that hits that part of the nook goes up Caesar Street because they can't back up

214
01:22:26.880 --> 01:22:43.840
Delano. So, they have to go that way. The streets is torn up. I have pictures of it right now. I'm I'm pretty familiar with it. >> Right. You guys were there last night >> and I can answer um >> your question. >> Everyone just says, "Well, it's a public way. Too bad for you people." But this

215
01:22:43.840 --> 01:23:00.719
the town put I worked for Boston Water for 35 years and if we did a construction project on a street, we would make sure that it doesn't drain into private property. You have to put catch base in storm drains. >> Right. Let's let's just pause.

216
01:23:00.719 --> 01:23:17.040
>> My thing is hang on one second. >> We're going to ask for a response to your first part of the question because we don't want to bury everything. We want to go in a linear fashion. So Matt, could you respond? And and for for my benefit, do we have any I don't recall

217
01:23:17.040 --> 01:23:34.480
any anything that we were involved with on Cedar Street. And if I'm wrong just >> No, I think what he's saying is it was a sewer project. So it would have been >> the term was you people and it was me. project. >> Um, so we had residents of Drew and Sver

218
01:23:34.480 --> 01:23:51.600
A reach out about storm water issues. Their concern mainly was the scouring down the end of the stairs and the beach and that sort of stuff. But from my standpoint, a lot of what we do is trying to retrofit storm water issues around town and make sure you get

219
01:23:51.600 --> 01:24:08.320
treatment. So when we looked into it, realized there was nothing there for treatment and that it would make a good site for grant funded work like this, I started looking at it and what I ran into was some of the adjacent streets that we could have also done were not public. Um, similar to Cedar Street,

220
01:24:08.320 --> 01:24:24.480
Adams Aav is right next to these and it's a private road. Um, so I can't I can only apply for grants and do projects on public streets. Wow. >> So it's Ceda Street. Nope. Sorry. >> You have to get up there, too. >> Nope. Keep this very

221
01:24:24.480 --> 01:24:40.239
>> very linear or else it just goes goes to pot, right? >> So Ceda Street is is a a private right away. >> That's my understanding. And I the way this stuff goes because I'm no expert on roads and what is and isn't is I ask um

222
01:24:40.239 --> 01:24:56.080
the highway superintendent or the town planner usually like a list of streets, let's say, and I'll say, "Which one of these is public? Which one of these is private? Um, you're 100% right on Cedar Street is I've driven through that >> a handful of times and I've been there when it's a big rainstorm and it's

223
01:24:56.080 --> 01:25:11.840
>> Well, right now >> it is precarious. >> I know you went by last night cuz I saw your two vehicles checking out. >> Yeah. Very slow. >> I saw your vehicles go through the bump that you went through when you went in front of Cedar Street. You had to slow down or you break your axle. >> Exactly. >> Just Just so we're clear, this is

224
01:25:11.840 --> 01:25:27.520
conservation commission. So we we stay in a lane highway department. Well, it's really not. It's a storm water issue that you that the town created. >> Well, the project here is a storm water issue that we're talking about. Cedar Street is not something we're talking about. >> But for their vehicles to do that storm

225
01:25:27.520 --> 01:25:43.520
water project on Drew and SA, they're going to be tearing up Cedar Street because it's the only way that those major vehicles can come >> because they can't make the tight. They have to cut down. So, >> okay. So, this is a road access. >> Correct. And that's why C that's why

226
01:25:43.520 --> 01:25:58.480
Cedar Street is no matter what you do it's getting torn up because I have pictures of 10 whalers constantly going down there. Anyone that does any kind of project in that part of the nook has to use Cedar Street. So for the town to say

227
01:25:58.480 --> 01:26:14.639
it's a private way is just ridiculous. >> Well from a from a town standpoint strictly from how all of the town's regulations and everything works. It is a private road, but what I can do is, you know, this is a project that we're

228
01:26:14.639 --> 01:26:30.159
going to get grant funded. It might require a match funding of 10% or something along those lines usually. But what we try to do now is we get the the permit from the conservation commission and then we go to the next round of CZM funding and say, will you pay for this

229
01:26:30.159 --> 01:26:47.520
project now? And what I can try to do, since what you're saying is likely accurate, that a lot of these bigger vehicles that are taking material in and out of here are going to have to go around and through Drew, maybe there's a way that they can make repairs to Cedar

230
01:26:47.520 --> 01:27:02.880
Street at this close of the project. I can't guarantee that, but I can look into it. >> Why should they be allowed to use Cedar Street? >> It's it's open for them to drive through. Like I said, it's a it's a private road. private road with the public access. So, you're hiding behind

231
01:27:02.880 --> 01:27:19.520
>> I'm not hiding behind anything. >> We're not going to do this like this. We're going to we're going to be respectful of one another. >> What I'm saying is I'll try to help a solution to a problem if possible, but I can't guarantee that I can fix the problem. >> All right. So, so we we talked about the access. Is there another and and I think

232
01:27:19.520 --> 01:27:34.639
you got an explanation. >> Let me finish, please. >> Okay. We don't talk over. I don't talk over you. You don't talk over me. We have the access issue that you'd like to hear more on. You also asked about the location and you were you received an

233
01:27:34.639 --> 01:27:51.120
answer. Did that satisfy your inquiry? >> Well, I guess and that's about as far as we're going to go tonight anyway, I would assume. Right. But my thing also is if you go over the other side, the Adina when they did the soup project over there, there were catch basins

234
01:27:51.120 --> 01:28:06.719
everywhere and I think this there was people from CDM. Is that who >> CDM Smith? Yeah. >> Who came out originally and looked at the issue in front of Cedar Street. It was two women and they were shocked that

235
01:28:06.719 --> 01:28:22.719
the town wasn't correcting the storm water issue before they you know they expressed to my wife this is you know no one's looking at this and I'm just they never come back to the >> just for my clarity this meaning what >> specifically

236
01:28:22.719 --> 01:28:38.800
>> the storm water issue >> if you you have to okay there's people who listen can't hear because there's only one microphone okay >> and in My other issue is I'm listening to find a boy and I'm sure everyone's concerned about issues with septus

237
01:28:38.800 --> 01:28:54.639
systems and all that, but there were people that live right on Cedar Street that came to the town with emails and everything concerned about these issues when they were paving the road and doing the sewer construction and no one did

238
01:28:54.639 --> 01:29:10.480
anything. And you you you're talking about people not being able to cut a tree down and you have people that live with swimming pool in their street and no one ever did anything about it. And now you're going to have all these construction trucks and it's just it's

239
01:29:10.480 --> 01:29:27.120
daily business that everybody uses this street and I don't see why the people that live there should be responsible to maintain a street that everyone's using. >> All right. But that's my >> it's been noted. >> What I what I don't want to do is I

240
01:29:27.120 --> 01:29:41.920
don't want to pretend that we're in a different lane than we are. Okay. You have a legitimate discussion with highway. That's >> well and it's a storm water and Amanda Sullivan 22 Delino app and I spoke to it was two women at is it CZM or that came

241
01:29:41.920 --> 01:29:59.040
down. It was a couple of years ago and I brought them over and um they might have given me their cards. I don't know. But after I spoke to them, they were quite surprised at how bad the road looked, all the water that was there, and that they were going to go back to their office to see if the town was going to,

242
01:29:59.040 --> 01:30:13.760
you know, be looking at other streets and if that was going to be a street that was going to be addressed. That's all I can tell you. >> Perhaps that's something that you could follow up with. >> Yeah, because we've heard when we've had a meeting before with um Mr. Hickeyi, the town administrator, he was saying

243
01:30:13.760 --> 01:30:31.520
how it's a private road but a public way, which I find very confusing going, how can it be both? And is that something that you could look at as far as getting grant money for a public way? I mean, I I don't know. >> I don't think so, but I can look into it. >> Okay. Thanks, Matt. That would be great.

244
01:30:31.520 --> 01:30:48.800
>> All right. Is anybody else like to be heard on this? >> See if anybody's got their hand up. >> Can I just ask one more? Is there someone that does I know the state requires the towns to have a storm water department or someone in

245
01:30:48.800 --> 01:31:05.600
charge of storm water. Kingston doesn't have a storm water because the highway >> essentially that's that's my department. Yeah. >> Mhm. Right. And I I see that when you put out statements about trying to correct areas for storm water, it's a

246
01:31:05.600 --> 01:31:22.239
public health issue. You you're putting all this stuff. Well, there's a major public health issue right right in front of you 365 days of the year. Crickets, you know, >> the private road, >> right? Thank you. >> And the high and the highway guy said we

247
01:31:22.239 --> 01:31:39.120
paved the road to turn into a private property. You know, it just it seems like everyone's walking around with blindfolds on this issue. I appreciate >> we have we have a lane to go tell you tonight. >> I hear you. >> I thought I'd bring in

248
01:31:39.120 --> 01:31:57.120
>> Thank you guys. I appreciate it. >> Have a good night. >> That would be nice. Thank you. >> Is there anyone online that perhaps wants to be heard? >> Let me stop share so we can see. >> Pua, >> Mr. Dwis, >> hi there everybody. Um, thanks very

249
01:31:57.120 --> 01:32:15.280
much. Um, just for the sake of the Rocky Nook people, I think when I first got my job at Jones River Wershed, the first grant I wrote to CZM was for all of storm water in Rocky Nook. It didn't get funded. It's not just that people don't try. People do try, but it does require

250
01:32:15.280 --> 01:32:29.920
money and it requires a lot of investment. So um but my question for um for strong tree is uh the bio retention is that uh is there a a window for in

251
01:32:29.920 --> 01:32:45.120
term in terms of how long uh the water will settle there? Um and the only reason I'm asking is my my current um problem in dealing with mosquito control.

252
01:32:45.120 --> 01:33:02.400
>> Hi Pine. Hi. Uh, yes, we we have we have an under drain. Um, these will be standard, you know, 72-hour max, but there be much quicker. We did do test pits down there, and we had some test pits from when they did the sewer. It is

253
01:33:02.400 --> 01:33:19.360
rocky, but it's fairly sandy. Um, but like I said, it it will be under drained for uh Drew A has the existing outfall that we'll connect to. Yeah. Excellent. As as long as as long as it I think 72

254
01:33:19.360 --> 01:33:34.639
hours is okay. Um it's a little long but not not terrible. Um if it if it's longer than that, we have to put the eels in there. Thank you. >> Can I ask a question? Yes. >> Have you um done test pits or anything

255
01:33:34.639 --> 01:33:51.199
to find out where the clay level is under under the road? >> We did test pits. We hit refusal where the these systems aren't very deep. We're definitely we have separation of groundwater. Ground water is around elevation three. So the bottom is around five. So that's about as deep as going.

256
01:33:51.199 --> 01:34:08.560
The elevation down at the bios is around 8 and 1 half nine. So we're not going too deep. Um we did do test fits. We didn't find any silt or or clay. We found, you know, it's it's not the finest material. It's rocky nook, but it

257
01:34:08.560 --> 01:34:24.480
we didn't find anything that wouldn't perk. >> Okay. >> Yep. >> I know where you were going with that. >> [laughter] >> Yeah, it's a it's a glacially formed area from dug up clay and just mounted up. I I don't know how

258
01:34:24.480 --> 01:34:40.080
how deep where it is. >> That's why I was asking. The other question I have, the last house on the left, is he going to be able to turn into his parking his driveway? >> Which road? I think it's sever. So any

259
01:34:40.080 --> 01:34:55.840
parking within the rightway is is going to go away. So you're talking about Yeah, I think it's right here. >> No, I was talking about the driveway. >> Yep. >> We're not taking any driveway. >> Yeah, I think both of them will be able to access the driveway and they should even be able to back out

260
01:34:55.840 --> 01:35:14.280
>> towards the ocean on both streets. At least on >> Exactly. We kept all the driveways where you'd have turning radius, >> but parking sometimes they park at the end of the street. You can't do that anymore. >> All right. Any additional questions?

261
01:35:15.040 --> 01:35:36.480
>> I don't see anything. >> What do you think, guys? Are we are we ready for a vote? >> Excuse me. >> Well, Matt, did you have a question about the O andM plan that we should have it before? had said before uh >> before COC we'll have it um Justin will

262
01:35:36.480 --> 01:35:54.840
be >> correct me if I'm wrong you'll be putting it together yes >> at the a wrap up of construction before we file for a COC >> correct the specs are I have the specs done we'll tweak the plans after this and we'll put together the onm

263
01:35:57.840 --> 01:36:16.960
>> are we ready for a vote Are you wanting to close the hearing? >> We would have to. >> Okay. >> If we're ready, if we're ready for it or or this is where somebody would say, well, I move for continuence. So, >> I'll make a motion to close. >> Okay. A motion by Brian, second by Marilyn.

264
01:36:16.960 --> 01:36:39.520
>> Uh, all those in favor closing the hearing. Uh, say I. I. >> I. >> Opposed? >> Abstained. All right. So, we close the hearing five to zero. Do [clears throat] I hear a motion on the NOI? >> Sure.

265
01:36:39.520 --> 01:36:54.880
I'll make that motion to approve the project with conditions as stated knowing that we'll be looking forward to that O andM plan when they ask for the COC. >> Okay. We have a motion by Marilyn. Do I hear a second? >> Second.

266
01:36:54.880 --> 01:37:11.560
>> Second by Dot. All those in favor say I. >> I oppose. >> Abstain. All right. Motion carries 5 to 0. Um to issue the uh NOI, approve the NOI and issue the permit.

267
01:37:14.320 --> 01:37:36.719
Thank you very much. Section D, 17 Old Orchard Lane, notice of intent. I will now uh open open a hearing for a notice of intent submitted by Grady Consulting LLC on behalf of the applicant, the new Orchard

268
01:37:36.719 --> 01:37:51.840
Realy Trust for the raise and rebuild of a single family dwelling within the buffer zones to various coastal wetland resource areas [laughter] at 17 Old Orchard Lane where this is the first meeting on this proposal. We'll ask to

269
01:37:51.840 --> 01:38:07.760
hear introduction from the applicant. Mr. Uh thank you, Rick Brady from Grady Consulting along with Mark Pabone, the applicant. Uh this is a property at uh number 17 Old Orchard Lane. Uh it was before the commission a few years ago which I believe was withdrawn by the

270
01:38:07.760 --> 01:38:24.800
previous owner at that time. Uh Mr. Guabone has since acquired the property uh and also lives next door to the property. Uh the existing home on this property is a concrete block foundation located partially within uh the flood zone VE elevation 13. That flood zone

271
01:38:24.800 --> 01:38:39.679
cuts across the back corner of the existing block foundation. Uh we have the resource area needed by Brad Holmes. Uh they're depicted here on the plan. Uh the existing home existing foundations

272
01:38:39.679 --> 01:38:55.679
about 19 1/2 ft off of uh the coastal dune delineation line here. Uh and as mentioned previously within the land subject to flooding. It is uh currently in a state of disrepair as the people on the sidewalk

273
01:38:55.679 --> 01:39:12.719
saw yesterday with toilets and sinks falling through floors and whatnot and in dire need of being replaced. Uh Mr. Pabone has come up with a house design on this uh where the house is narrower than the previous house. The previous house was about 34 ft wide. Uh

274
01:39:12.719 --> 01:39:27.440
this proposed house uh that he wants to build is 28 ft wide. He would also like to pull that house closer to the property line. We have a 15 ft zoning set back. So, we would like to bring it about 15.4 ft uh from that uh property

275
01:39:27.440 --> 01:39:42.880
line here to the uh east, I believe or southeast. We'd also like to pull the house forward uh towards the existing access, existing roadway, old Orchard Lane. By doing this, we're able to relocate the foundation entirely outside

276
01:39:42.880 --> 01:39:58.639
of the velocity zone, elevation 13. would also like to elevate it a little bit higher on a foundation so that the basement slab uh which is also a garage under slab here is at approximately elevation 13.7. Uh [clears throat] so our slab of our

277
01:39:58.639 --> 01:40:14.880
foundation will be elevated above the flood zone uh to eliminate having to deal with that being within the flood zone. There's [clears throat] uh two parking spaces proposed to conform with zoning requirements. Uh these will be crushed stone parking spaces uh accessing the

278
01:40:14.880 --> 01:40:32.960
existing uh crushed stone and partially paved driveway coming in from Old Orchard Lane. Uh again, those will be crushed stone to be impervious. Impervious, sorry, not impervious. Um we're also proposing a 3- foot wide,

279
01:40:32.960 --> 01:40:49.760
1 foot deep crush stone drip trench around the perimeter of the house here. uh that's about 124 feet in total length. Uh it's giving us enough storage capacity. Uh so that holds a volume of about 4 in of runoff off of the entire

280
01:40:49.760 --> 01:41:06.960
uh imperous surface. So 4 in of runoff basically off of this roof uh will be collected within this crushed stone uh drip trench around the perimeter of the uh proposed house. There are two retaining walls uh on the law on the front here to transition the

281
01:41:06.960 --> 01:41:24.239
grade from the garage under here up to the main entry. Those [clears throat] two walls are approximately 20 25 ft long. Uh and they're about 3 and 1/2 ft tall. So it'll be um basically a stepped retaining wall situation there. 3 and 1/2 ft 3 and 1/2 ft. Uh so that we can

282
01:41:24.239 --> 01:41:39.840
access the main level uh at the front uh walkway here. Uh there is a set of steps proposed to get back down to grade on the back of the structure here. He does have architectural plans that he can share with the commission [clears throat] if you'd like to see it. Uh we have

283
01:41:39.840 --> 01:41:56.239
proposed mitigation plantings around the perimeter of the property and proposed swale uh within uh that's native plantings and mitigation plantings. >> Could you show me the swale please? >> Uh yes, the swale is denoted right in this area here uh within the planted

284
01:41:56.239 --> 01:42:16.000
area. Um, [clears throat] excuse me. Uh, so as mentioned, the proposed house would be moved further away from the resource area. Uh, he has proposed a post and rail fence to permanently demarcate the limit of the lawn area here. Uh, and we've talked about conservation uh,

285
01:42:16.000 --> 01:42:33.440
signage there uh, similar to what he had done on the house next door that just uh, was completed, which he did a very nice job on. Um the split rail fence will match some of the other fencing in the area as well. Uh we do have a 12-in silt sock proposed around the full

286
01:42:33.440 --> 01:42:51.280
perimeter of the uh site. Um not a lot of grading going on here, especially around the back side. We're maintaining existing grade, not bringing in uh fill. Um we will be connecting to town sewer and town water. Uh, so no need to worry

287
01:42:51.280 --> 01:43:09.679
about septic systems in this area. Um, and with that, I'd be glad to answer any questions the commission may have. >> All right, Matt, could you um could you bring [clears throat] us a seat? >> Sure. Um, [cough] portion of the site, portion of the existing structure is located within the

288
01:43:09.679 --> 01:43:26.159
velocity zone at elevation 13 ft. Uh there is no Azone at this site. of the flood zone or land subject to coastal storm flowage ends at the landward extent of the Vzone. As Rick showed, the new structure is proposed slightly landward outside of the Vzone. New site structure is proposed to be

289
01:43:26.159 --> 01:43:41.280
located 25.3 ft from the coastal dune and 30.4 ft from the inland bank of the mapped intermittent stream versus 19.5 and 20.5 respectively for the existing structure. So in other words, proposed structure is nearly six feet further from the coastal dune and 10 feet

290
01:43:41.280 --> 01:43:59.920
further from the inland bank. Um, initially we didn't have architectural plans. We have had those submitted now if anybody would like to see them. Uh, you have a two-story house with a garage underneath concrete foundation. I'm not going to repeat everything that he said for site conditions there. We

291
01:43:59.920 --> 01:44:15.280
have about 180 ft of native plantings behind eight conservation posts. Um, I have mentioned that we've allowed before including at his other property that placards can be attached to fence posts. So where they are proposing a split rail fence here, they may be able to do

292
01:44:15.280 --> 01:44:32.320
without the conservation posts and just put the placards on the split rail fence and that would be mentioned in conditions that in one fashion or another they have to stay there in perpetuity. [cough and clears throat] Uh retaining walls meet the standards from KWPR by

293
01:44:32.320 --> 01:44:50.880
being less than 4 feet of fill being held back. We had the deline we had several delineations on this. The most recent one by Brad Holmes. An earlier one mentioned BBW along with the inland bank. Um I don't see BBW on this plan

294
01:44:50.880 --> 01:45:09.760
and I didn't notice any BBW on site other than associated with 18 Old Orchard Lane. There is BBW. Um but that in a way sort of just gets at the status of the stream. Um, we did a site visit on the 21st.

295
01:45:09.760 --> 01:45:28.000
I didn't notice anything that looked out of place in terms of wetland delineation, where the coastal dune is, where the inland bank is, all of that. It's notable that I've never seen the stream dry or without flow. Its intermittent status appears to be based on it being clearly straight and of a

296
01:45:28.000 --> 01:45:44.960
human excavated condition. Um that doesn't mean that it's not natural or that it wasn't at one point a natural stream. Um but they're making a contention that it is a ditch because it comes out of a series of culverts after coming out of uh Main Street underneath

297
01:45:44.960 --> 01:46:00.000
Main Street. Um my take on this, we haven't dealt with this before. We've had several filings in this area um that we really haven't paid much attention to what this is as a feature. partially because everything in this area is already very developed,

298
01:46:00.000 --> 01:46:16.320
including this particular property. Um, so rather than get down and then the commission absolutely can if they want to, but if the commission wanted to get down to exactly what this feature is, my recommendation would be go to peer review because I have no idea. I don't

299
01:46:16.320 --> 01:46:33.119
know where this stream comes from, what its headwaters are, what its um, you know, total drainage area is. Um, but I don't think that the commission needs that to make a decision on a filing like this. I don't think it really makes a

300
01:46:33.119 --> 01:46:50.400
difference one way or the other what the status of that stream is, whether it's an intermittent ditch or it's a perennial stream where we have historic legal development up very close to it and we have a project that is improving conditions in some capacity and adding

301
01:46:50.400 --> 01:47:06.960
restoration plantings closest to it. What I would say if that's the way the commission feels is that they put a special condition in there specifying that you're not affirming that resource area type. Um, again, the boundary to me looked accurate. I just don't know what

302
01:47:06.960 --> 01:47:28.960
it is. Um, as far as the stream, so I thought that was worth mentioning and can be laid out in special conditions. Um there was an NOI support memo that came from ECR. It typified the stream and discussed compliance. Um it did mention

303
01:47:28.960 --> 01:47:45.119
that this met the standard of maintaining an existing structure that I disagree with. Um if that's the point that he was trying to make in that. So just from a procedural standpoint, I thought it was worth calling that out as a redevelopment of an existing structure. Um but I do agree with the

304
01:47:45.119 --> 01:48:00.480
point that it makes that the proposal increases the distance between the structure and the stream and other resource areas and provides mitigation plantings in between. Um so I imagine the commission will take into account the presence of an existing structure. Again there is no grandfathering and no requirement for the commission to allow

305
01:48:00.480 --> 01:48:17.199
development here if they find that such development will be detrimental to the well and resource areas. plan states the existing imperous coverage at 149% or,080 square feet and proposes 15% or,089 square feet. So you're increasing by four square feet. Um 15% is the

306
01:48:17.199 --> 01:48:33.199
maximum under KWPR. Again, for procedural purposes and for the administrative record, wetland memo number two incorrectly states the proposed percent impervious at less than half of 15%. So I don't know, I didn't reach out to Brad on that. It probably was something copied over from a

307
01:48:33.199 --> 01:48:48.080
different filing, but just for the administrative record noting that that's incorrect. We do have a 15% proposed very minor increase. Applicant proposed to construct a new site structure on a concrete foundation entirely within the 50oot and mostly within the 40 foot. No structure

308
01:48:48.080 --> 01:49:04.239
setback. So KWPR calls 50 foot for wall type, 40 foot for open pile and that distance is to LSCSF which is the velocity zone. uh foundation is also within 40 and 50 feet to Coastal Dune and Inland Bank. We talked a little bit about the pvious

309
01:49:04.239 --> 01:49:21.520
nature of the proposed parking spaces uh but we didn't really talk about proposed deck steps and landing. Be good to have some information of whether that is pvious and if so should probably have special conditions talking about board spacing typically 38 of an inch. We have two variance requests that were

310
01:49:21.520 --> 01:49:37.199
provided. one for putting a structure with a wall type foundation within 50 and 40 feet of wetland resource areas and one for failure to place the structure to the furthest maximum extent from resource areas. Um variance requests are just a section of the narrative. They do not specify the specific resource areas and do not

311
01:49:37.199 --> 01:49:54.800
follow the requirements of KWPR 5.23A and B. Regarding the second variance request, KWPR says the commission will require all structures and activities to be moved as far from resource areas as practicable. Here the applicant is requesting relief in order to comply with zoning in that on-site off-

312
01:49:54.800 --> 01:50:10.800
streetet parking spaces may be provided. Um my understanding is that zoning relief in this case would not be possible. I did reach out to the commission if they had questions about well can you just move the house further and not have those spaces there. From what I gather, the answer is no. That

313
01:50:10.800 --> 01:50:32.239
those spaces would be required. >> And those spaces were technically there before because of the grass area in front. There was the ability to pull off of the road. From page one of the narrative discussing the mitigation plantings says, "Plantings will be provided as

314
01:50:32.239 --> 01:50:48.639
well as a swale to direct storm water into said planting area. this area is expected to catch not only storm water from onsite but that coming from neighboring properties as well. Um wondered if we could have a little more explanation on that. Just said whereas the proposed planting area is only 5 ft wide that was a little concerning

315
01:50:48.639 --> 01:51:03.280
guiding storm water towards wetland resource areas particularly where adequate infiltration systems are not provided often results in detrimental effects to those areas. In this case, we do not have sufficient information to determine what the volume of storm water will be or that it won't cause detrimental effects when reaching the

316
01:51:03.280 --> 01:51:19.760
stream or coastal resource areas. It's unclear what the storm water flow pattern is presently and whether the proposal makes significant changes in that flow in including from offsite as was mentioned in that statement. Um, compliance with the mass storm water standards is not required for single family house projects, but the

317
01:51:19.760 --> 01:51:35.600
commission has the authority to question potential storm water issues where they arise in the normal course of review under WPA and KWPR. Um Rick talked a little about I had a comment about the trenches um you know 3 foot by one foot depth and just saying

318
01:51:35.600 --> 01:51:50.960
the commission may have questions about sizing it seems um Rick is saying 4 in >> so they can they can store >> full volume without accounting for infiltration. >> Okay. >> So >> and that's for the footprint. >> The footprint is basically all of the

319
01:51:50.960 --> 01:52:09.440
impervious. So yes. Yeah. It's really the house that's the impervious on this site. >> I said the narrative has errors that should be addressed for the administrative record ma record mainly involving the stream status. Many sections refer to the stream as perennial where the application is

320
01:52:09.440 --> 01:52:24.880
contending it is a type four intermittent stream. Um for instance number seven says no known perennial streams exist within 100 ft of locust property and number eight says not not applicable the on-site stream is perennial. Um, other than as described above, the

321
01:52:24.880 --> 01:52:40.239
project appears to meet the standards of WPA and KWPR, including the standards for work in previously degraded riverfront area. Um, I did again I want the commission to talk about the proposed deck steps and landing as far as pvious nature. Um, and I had noted

322
01:52:40.239 --> 01:52:57.040
that the applicant should explain how a concrete foundation is appropriate in this situation. Well, there's already a concrete foundation there in place closer to the resource areas. The commission does not need to approve proposed work when it's feasible to use best practices that would be less detrimental to the resource areas given the proximity to the current Vzone and

323
01:52:57.040 --> 01:53:13.360
sea level rise projections. It's entirely feasible that the Vzone will encompass the area of the proposed foundation during the lifespan of the proposed house and potentially soon. While a piling type foundation is also prohibited by KWPR within 40 ft in this area, it is more appropriate than

324
01:53:13.360 --> 01:53:29.760
concrete wall type particularly given the proximity to velocity zone. narrative states that the first floor elevation will be 21.7 feet while the Vzone is at 13 feet. But this does not explain the concrete foundation where you have a note saying garage under slab elevation is 13.7. So it's entirely

325
01:53:29.760 --> 01:53:46.159
possible to get the same elevation and prevent any obstruction or scour which may help protect the structure and the resource areas over the long term. The commission should consider that the proposal removes roughly 100 square feet of concrete foundation from land subject coastal storm flowage being velocity

326
01:53:46.159 --> 01:54:02.880
zone right now and utilizes native plantings to restore roughly 180 foot of the area. So you do have improvements in current vzone. So what I'm saying is not you have something that violates the current standards. You don't you have something that meets the current standard but for a best practices well

327
01:54:02.880 --> 01:54:18.480
protection standpoint. Are you going to have an issue here long term where you likely will have the velocity zone increasing in elevation at this site? Um, understand the applicant's not going to want pilings here where right now you're talking about parking underneath

328
01:54:18.480 --> 01:54:33.760
the house. So, right now what you have is you have a garage that you're pulling in underneath there. [snorts] >> You did say that you had architecturals, right? >> Yeah. I don't know um if we have them digital. I know you you gave them to us earlier and I'm not sure if we scanned them in yet, but we do have

329
01:54:33.760 --> 01:54:49.760
architecturals that can be um shown tonight. >> Mark has paper copies so he can share as well. >> Perfect. Um I noted again the applicant should provide appropriate variance requests following the guidelines in 5.23A and B. Applicant should show that the post development storm water flow patterns will not have detrimental

330
01:54:49.760 --> 01:55:07.840
effects on the resource areas explaining the difference between existing and proposed conditions. and commission should specify whether they're affirming the stream type in any issued OC's. In order to ensure a true pvious condition, the commission may wish to include a perpetual condition requiring

331
01:55:07.840 --> 01:55:24.080
the driveway and any other pvious gravel areas, parking spaces to consist of nothing smaller than 3/4 in stone, gap graded, and that fines or sediment will be removed should they accumulate to the point where water no longer infiltrates quickly. Other coast appropriate special conditions would be covering dumpsters

332
01:55:24.080 --> 01:55:39.440
when not in active use, immediate fines for trash found in the bay, no outdoor fertilizer, chemical use, and conditions related to mitigation area establishment, maintenance, and conservation post in perpetuity. That's all I got. >> All right, we'll open it up for discussion. Questions from the from the

333
01:55:39.440 --> 01:55:55.599
U commission either the advocate or Matt. So I know on the sitewalk yesterday you started to talk about how the construction underneath would allow some pass through of water flow

334
01:55:55.599 --> 01:56:11.679
and not >> so we had originally looked at >> hazard I think is what you were talking about. >> Yeah. one uh we looked at there is a door that uh Matt didn't make note of and the garage door itself is going to allow the uh the concrete it's essentially turning it more into a

335
01:56:11.679 --> 01:56:27.199
piling structure than it is an actual foundation. So the water will be able to to act um in the event that it exceeds the velocity zone it will in fact blow the door open or or blow the garage door open. Garage doors down in the Florida

336
01:56:27.199 --> 01:56:43.520
uh area are used typically as the the fail safe that that creates the pile area. If the commission so uh wishes, we could put the blowout um what do they call? Smart flood vents uh in the foundation.

337
01:56:43.520 --> 01:56:59.440
>> Smart vents. >> Smart vents. >> Smart vents. It's a flood vent that allows the water to to uh to permeate into and those could be up, you know, a little bit higher than the 14t floor. or say at 15. So that still it's not going to create a structural issue.

338
01:56:59.440 --> 01:57:14.639
>> So those were used on the brain a NOI filing I think last year or the year before to create that pass through. But as I was saying on the site visit yesterday, in that situation that was with a crawl space where I believe all that was under the house was gravel or

339
01:57:14.639 --> 01:57:32.080
you know some sort of sediment, soil, whatever under there is in this situation where you'll have a a garage saying you're going to have vehicles parked in there. My question is is there a situation where even when you have that you have the potential for

340
01:57:32.080 --> 01:57:52.880
contaminants to be brought back in? Is there anything that can be done in that sense? >> Just on that one, I I mean I understand how the velocity works and I understand, you know, blowout doors versus, you know, vents. I um the thing that complicates it I think a little bit is

341
01:57:52.880 --> 01:58:09.360
is the storage of things that naturally accumulate inside those garage areas. Um so I understand the need for parking. I need the desire for garages. Um but from that perspective that um that's a tough

342
01:58:09.360 --> 01:58:26.320
one to to I guess weigh against you know a detriment um to the area. So, um, thoughts. >> One of the commission members brought up yesterday of the electric car issue and having a electric car in a garage like

343
01:58:26.320 --> 01:58:43.760
that. And, uh, the electric uh, port would be on the upper the the parking spot that goes up towards the front door. That's going to be up at 20 ft is where the electric car plug is proposed for that parking spot. >> Um, I looked at your architecturals. I

344
01:58:43.760 --> 01:58:59.280
didn't see any mechanical rooms. Is this is the mechanics uh mechanicals going to be in the basement as well? >> If we put mechanicals, they would be elevated in the construction. So your typical heat pump water tank stands about 6 ft tall. So it would have to be

345
01:58:59.280 --> 01:59:28.080
on a 24T platform up to allow for that. But that's one of the high highest hardest things to locate in anywhere in a house because of the height requirements. They're about six feet tall. So um while Jim's thinking any comments on

346
01:59:28.080 --> 01:59:44.320
the deck steps landing is that all it seemed like in the filing it was proposed as pvious but I didn't catch >> uh narrative or anything. >> Yeah. The intent is to provide spacing between the boards 38ighs of an inch you had mentioned. That's a perfectly

347
01:59:44.320 --> 02:00:01.119
acceptable condition and what we had anticipated for the construction of the deck areas. Under the deck area, there'll be the inch and a half stone like we did over at 18 Old Orchard, which will allow any water that goes through the the deck planking to permeate without any erosion

348
02:00:01.119 --> 02:00:17.840
of any of the subs soil that's below the deck. So um the the other reason we did the swailes around is to eliminate gutters because gutters tend to concentrate water flow and cause more erosion than um so if the water falls freely into the

349
02:00:17.840 --> 02:00:35.440
stone swailes. They'll provide that u drainage and and m and percolation into the ground a lot better than creating a a turret from a gutter and a downspout. The other thing is the uh question came up in in Matt's braille on the swale

350
02:00:35.440 --> 02:00:52.159
that's the swale that's in with the plantings is designed only to handle the lawn area that's currently there. So that that that's the only water because all the water from the impervious surface of the structure will be taken care of with the

351
02:00:52.159 --> 02:01:08.159
stone around it. >> Right. It was the narrative where was talking about taking water from other properties. Is that meaning the other side, the east? Uh, what is that? Southern side of the yard. >> This particular property is the lowest grade property at Old Orchard Lane. Um,

352
02:01:08.159 --> 02:01:25.920
so naturally the water sheds off of all the rest of the properties. Now, most of the uh water is mitigated. 18 has much better mitigation now because we've added the stone um and and addressed a lot of the issues over here at 18. 18 is

353
02:01:25.920 --> 02:01:41.199
over here. Um, but there's still some of the water comes down the existing paved roadway to the the stone, but we we'll be mitigating a lot of that because the entire driveway will now be stone as opposed to the well, I don't know what's

354
02:01:41.199 --> 02:01:56.239
left there now. It's not G draft. It's pretty much dirt. Um, so this a lot of the the water that we mentioned as far as mitigating it. We're trying to funnel that into a some kind of a treatment before it gets either to the I call it

355
02:01:56.239 --> 02:02:13.920
the brook or the uh or into the ocean, but most of it runs down this way and it it it goes into the lawn pretty good. We're not having any any kind of uh active erosion at the time between Old Orchard and the uh stream. I don't recall and I know because I asked at the

356
02:02:13.920 --> 02:02:30.639
site visit any detail or anything on the parking spaces because initially I asked like is that going to be turf and you said it was going to be crushed stone. Is there any specification on that? Like does that itself have a storage volume? Are you going with a certain depth there or is that just going to be like a top dressing on dirt?

357
02:02:30.639 --> 02:02:47.920
>> Yeah, I would suggest a minimum of six inch depth. And yes, that does also store uh storm water runoff and does also promote uh infiltration as well. That another component to it that'll help with the storm water. >> And was that designed at 3/4 stone or

358
02:02:47.920 --> 02:03:04.480
something along those lines? What was your plan for the parking spaces? >> Uh, I would suggest 3/4 would be appropriate. >> Okay. >> Can I ask something? >> Yep. Are we allowed to um ask for sorry I said maintenance of these gravel

359
02:03:04.480 --> 02:03:20.880
swailes because I did notice on 18 that some of them have weeds going through them already. So is there a way to make sure that these are maintained clean weed free because then if they're not weed free are they going to drain the way that they're supposed to drain? Are they going to maintain? Are they going to

360
02:03:20.880 --> 02:03:36.080
>> It's a tossup. I think it I think more than likely the property owners are not going to want weeds growing out of there, but it can be sort of a double-edged sword. Like when we do a bio retention area, we want plants there because plants help with uptake. Um, but

361
02:03:36.080 --> 02:03:51.040
you could also have a situation where they're contributing to sedimentation and filling [clears throat] of the gravel. So, >> um, >> well, if there's not any other way to catch the water and if it fills up, then >> I think, like I said, you definitely

362
02:03:51.040 --> 02:04:05.520
want, and this was only for the swale, but I think you would include the parking spaces in that same condition, that you're mandating that they stay at a minimum 3/4 in gap graded stone and that if they get over time or through

363
02:04:05.520 --> 02:04:21.360
some incident, you know, filled with >> sediment or other material to the point that they no longer infiltrate that the commission can mandate that they be repaired. Um whether that's just from completely removing it and replacing it or whether it's through some process of

364
02:04:21.360 --> 02:04:37.760
screening or whatever. Um you know, you would have the ability to have that conditioned. You could throw a condition in there that the the areas have to be kept weed-free, but it's it's hard to >> just like maintained as >> I would say it's more important just to make sure that you're writing that

365
02:04:37.760 --> 02:04:55.440
they're maintained as something that is actually pertaining water in it, you know, after a rainstorm, then I think you can make a pretty good case that it's not infiltrating properly. >> Well, it might be worth asking, too. Perhaps they have a plan for this. Um,

366
02:04:55.440 --> 02:05:10.560
what kind of stone you're going to be planning on using? Is it going to be a wash stone? Is it going to be, you know, something that's going to have a lot of sediment on it that's going to accumulate in the bottom? What What's your plan there? >> No, all the stone that we use on site is a wash stone. Um, I use the inch and a

367
02:05:10.560 --> 02:05:28.080
half stone at 18 >> because it has a bigger spaces and and has more retention of water. And as as you're discussing this, I was thinking a base of inch and a half with a three quarter on top would give you a better um volume of storage. I'm going to refer

368
02:05:28.080 --> 02:05:45.760
to my engineering though. >> Yeah, I think for a special condition we would say minimum of 3/4 in and you're welcome to to do as you wish there. Um and I think yeah, I think that would that would suit your needs. I I I think

369
02:05:45.760 --> 02:06:01.440
I think there's a lot of good going on on this one and I understand that it's a existing um parcel. The you know the one thing that that still sticks with me is is the classification of what you just called a brook, right? You grew up in this area. You know what it is. You know

370
02:06:01.440 --> 02:06:16.560
that it's wet. Intermittent versus perennial. I I'm not comfortable voting on anything that doesn't line up with what our interpretation of it is currently. So if we do close tonight, if we do vote, if we do approve, I'd like

371
02:06:16.560 --> 02:06:33.840
that plan updated and remove the reference that kind of spins it in the wrong direction. So that's what that's what I would like to see done on the plan. So remove the reference to the intermittent stream because you don't have as far there's no proof in front of us that that's an intermittent stream.

372
02:06:33.840 --> 02:06:49.920
So if if we're tied to that on your application, then it's going to be my recommendation that we continue and and and require the work to be done to either accept that or or or deny it. >> Yeah, that's fine. >> Okay.

373
02:06:49.920 --> 02:07:05.440
>> So you want it changed from what intermittent to what just to be specific. >> Yeah. We got to remove the references to intermittent because it could be referenced somewhere else and you know >> talking stream of unknown status. >> Yeah. perennial stream is is is by

374
02:07:05.440 --> 02:07:22.560
default we we kind of go that direction. So >> stream >> stream >> stream. >> Yeah. >> Then then you have to deal with it with Grace Beach and tennis courts and 18 recently. And so >> yeah, I mean we've we've uh we've dealt

375
02:07:22.560 --> 02:07:39.199
with it with we dealt with it with the playground by essentially barely looking at it because you the whole thing was staying within a previously developed area. And the same thing with I think the the tennis courts. It's there's no change to the you know when you're not

376
02:07:39.199 --> 02:07:54.480
changing anything really on the site in terms of on you know ground conditions it's pretty easy to overlook something like that. But if we ever need to get to the bottom of exactly what that is, it's going to be, I think, a little more of a bear than you want to deal with on a

377
02:07:54.480 --> 02:08:09.440
single family house property. >> And and that's that's >> So what do you want to see personally on that? >> I want to see the >> stream of unknown status. Just say stream. >> It's just as long as it's open. We're not agreeing to any of it. That's that's that's my point.

378
02:08:09.440 --> 02:08:24.320
>> Okay. Um but on that point, Mark, you I mean you grew up in this area that stream comes from is it Baker A? >> It um >> under the hut. >> Is that is that where you guys are? >> It really does initiate at the storm

379
02:08:24.320 --> 02:08:42.880
water for what is now uh Route 3A. Um, understanding that Crescent Street was 3A and years ago the bypass of Crescent Street was the new 3A closer to the the ocean. That was before my time. But

380
02:08:42.880 --> 02:08:59.520
>> so there's no up there's no upgradient portion of that on the other side of Main Street that you >> that you can find that water accumulates. I would say the groundwater is pretty high. My father years ago said that that was a swamp when he was a kid and they put the road through there. But

381
02:08:59.520 --> 02:09:15.760
I can't tell. I don't know. I >> It could have been a mosquito control thing, you know, 100 years ago. >> Definitely was has been maintained in my lifetime as mosquito control by Plymouth County as a drainage ditch because it did accumulate water and track and of

382
02:09:15.760 --> 02:09:31.840
course the public park was there to mitigate the mosquitoes. They clean it out, but they do all that by hand. There's no machines involved. Um, but it does drain a very small wetland that's uh behind six old orchard lane, but it

383
02:09:31.840 --> 02:09:48.320
doesn't meet the requirements that and that's why it's hard to define because it doesn't have the the wershed. So, um, but the origin point is the storm drain system of 3A, which is catching water all the way probably from

384
02:09:48.320 --> 02:10:16.719
both ends of Crescent Street. um groundwater and um but at this point I think it's been too well developed to really pin it down as having any natural water source. >> Interesting. >> Is this separate now? This is gone

385
02:10:16.719 --> 02:10:32.320
bananas, right? >> That's gone bananas. This is gum bananas. And this was a previous >> Yeah. >> This isn't tied to that. >> That is that >> that is it. >> This is where it comes out of the ground. Right in their backyard basically. >> The ones that just had

386
02:10:32.320 --> 02:10:50.560
>> Yeah. >> So, okay. So, this >> So, we would be more over here, right? >> Yeah. >> There's a lot of water over there. >> Yeah. There's a big pond here.

387
02:10:50.560 --> 02:11:07.599
>> All right. Um, we also had a question on a red maple tree that we're dealing with, too. Um, it's near the mitigation area. Uh, he would like to remove that if possible. It's not in great shape. >> Um, >> Matt didn't want to do it administratively uh because it's within

388
02:11:07.599 --> 02:11:22.719
the resource area as opposed to being in the buffer zone. Um, but he would like to remove uh that maple tree. >> It's within your swale. Does the swell not go that way? >> Right. So I would assume that that if we're looking at the swale as a

389
02:11:22.719 --> 02:11:38.320
>> benefit that we would see that that tree would have to go through the >> couple um thoughts on this. Right. So the tree is definitely in striking distance of the existing house and probably would be in striking distance of the proposed house. Um it's not in

390
02:11:38.320 --> 02:11:53.679
the best of health. There's definitely some broken branches and some sign of decline. There might be some structural instability to the trunk. Um, I would say there's not really an issue with removing that as part of this project. I think when the commission makes you keep a tree that is

391
02:11:53.679 --> 02:12:09.119
potentially damaging to the structure, it's it's it's been done, >> but it's it's depending on the situation risky. I would say you wouldn't want ground disturbance. You wouldn't want to be grinding out the stump. And you may

392
02:12:09.119 --> 02:12:24.800
even like >> Mark had just suggested that as well. We could cut the tree, leave the stump, let it grow back. >> That's kind of what I was thinking is it's it's a beneficial species. It's a native species. It's a wetland species. If you flush cut it, it probably starts sprouting up and you might you either

393
02:12:24.800 --> 02:12:42.320
just let it bush out or you select the strongest leaders and then you'll end up with a tree again. >> Planting bed and that will suck up a lot of water. So, as part of having that in a swale, like red maples hold once it gets to be mature again, red

394
02:12:42.320 --> 02:12:57.520
maples, you know, they hold a lot of water just in the trunk itself. So, it's going to do a pretty good job of soaking storm water up. >> So, what height would you expect was acceptable? >> I don't really care as long as it's above ground. I mean, it's just a flush

395
02:12:57.520 --> 02:13:13.199
cut and let it let it pop back up. >> Is it not within the plain dimensions of the swale or is it within those? It is within it. Yes. >> Right. So, in order to create that swale, I assume you have to do some excavation. Correct. >> We don't need to remove the stump. >> You don't need to.

396
02:13:13.199 --> 02:13:27.440
>> Well, the swale was to lead back to that area, right? The swale was more >> there, too. It almost captures too. It's almost a little bit of a dam. So, leaving the stump there, keeping it slightly elevated helps capture that surface. Right. >> Great.

397
02:13:27.440 --> 02:13:45.360
>> All right. Any additional questions? So, are we agreeing that the concrete foundation is okay even though we had the discussion about the velocity zone and we're going to accept the door design is the pass through and >> I think they offered the um flood vents

398
02:13:45.360 --> 02:14:01.360
>> the vent thing. Yes, we're good with that. >> Yeah. I think we would want to make that as a as a condition just >> for safety. And we're talking on the the ocean side of the foundation, correct?

399
02:14:01.360 --> 02:14:17.679
>> Well, there's there's going to be a engineering recommendation. I think I think we just leave that to >> Okay, Mr. Grady. And I don't know if it's Do they have to be opposing? >> They're supposed to be on opposing or pass through walls. So, the suggestion

400
02:14:17.679 --> 02:14:34.480
here would be uh one on the back wall and one on the sidewall here. >> Um Yeah, they do make them for the garage door as well. So, yeah, my suggestion would be one in the back, one on the side, and it's one per 200 square feet if we were in the flood zone, which

401
02:14:34.480 --> 02:14:50.880
today we're elevated above it. >> Okay. >> All right. Any other questions, comments? We uh I'm sorry. Let's open this up to uh public discussion, please. >> Anybody from >> Find

402
02:14:50.880 --> 02:15:07.040
>> Thanks you guys. So, good luck, Mark. Um, so I I just this is a general question for the town really because it has to do with planning and the fact that we're what we're facing in terms of sea level rise. Um, I see the visone is

403
02:15:07.040 --> 02:15:24.560
13. Your your your slab is 135. When I look at the December 2025 Woods Hole Group um analysis for the Adena, you know, they're saying by by 2050 we're likely to have a 2.5

404
02:15:24.560 --> 02:15:41.440
rise in flood. Um that's not very far from now. And uh the Vzone um creates a whole another dimension to that that I think we need to start appreciating in terms of you know how crazy our weather

405
02:15:41.440 --> 02:15:58.400
has been. Um and I and I just wor I worry for you and this and this project um that it's not quite high enough. I think you know it's great to to talk about um vents and all that stuff. I when we're at the landing, I always open the back door of the boat shop to let

406
02:15:58.400 --> 02:16:13.840
the water out, you know, that kind of thing. But um but I don't live there. And um I think that it's really worth um the both the town and um and the applicant, you know, along this area to

407
02:16:13.840 --> 02:16:29.360
to really evaluate um the practicality of what we're facing and the and the idea of what we really need to do in order to be resilient um in the face of everybody ignoring the fact that we're

408
02:16:29.360 --> 02:16:46.719
creating higher sea level rise. Um, and I just wanted to I I did want to say um about the stream that I've been looking at that thing since 1981 um or so. It's been I've had fights with

409
02:16:46.719 --> 02:17:02.719
with people putting septic systems in the stream because they're digging down a couple of feet and the stream is running there right underground. And I do believe that it comes from across the street and probably from Smith's Lane. So, um I I I thank you for for

410
02:17:02.719 --> 02:17:19.439
addressing that and calling it a stream. Um it it um it it has been active for the entire time that I've been involved in conservation in the town. And um I think that we really need to appreciate um the fact that it runs all the time. So, thanks very much. Good luck, Mark.

411
02:17:19.439 --> 02:17:37.760
And um and you know, Rick, if you could like do do a little work on projections for sea level rise for us, we'd probably appreciate it. Thanks. Thank you. >> Thank you. [clears throat] >> Hearing no no other comments or

412
02:17:37.760 --> 02:17:54.960
questions. No, no other hands raised. Um does the commission feel that we're ready for a vote on this? Uh or is it continuence um the path? Well, we talked about about a lot of things and >> it sounds like you need to add some

413
02:17:54.960 --> 02:18:10.319
little tweaks to the plan and stuff like that to get it to where we've just discussed it going. So, should we continue this in order to get that plan back or what are you thinking, Matt? >> It's up to the commission. Um

414
02:18:10.319 --> 02:18:24.719
you they can either come back with some of the stuff as notes on the plan um or they can be in there as special conditions. You can require the plan be updated before orders of conditions are

415
02:18:24.719 --> 02:18:41.280
officially issued. Um I don't think much changes in terms of your your review within these things. Um, yeah, and to to Pine's point, that's yeah, I sort of agree on on all of that,

416
02:18:41.280 --> 02:18:58.559
but I think some of it comes down to builder beware, >> you know. Um, the commission does have the ability to to push back on situations they think are going to be, you know, clearly detrimental. And I I

417
02:18:58.559 --> 02:19:13.840
believe you do have the ability to factor in some of these projections. Um but at this point, what they're showing at least currently does meet those standards. So >> it's just on that note, I think, you know, we've had we've been around for a

418
02:19:13.840 --> 02:19:29.280
long enough time. We've had some filings where you have to think about the the land um subject to coastal flow and then subsidance, right? This is a single family lot. there's if we apply certain standards

419
02:19:29.280 --> 02:19:44.639
to that extent on something that was for you know whatever it was 70 units it's not the same thing this is a taking if we if we get into >> not allowing Mr. We vote to rebuild a house that exists currently. So, um,

420
02:19:44.639 --> 02:20:01.200
>> and it's not necessarily that as much as, and I think you're 100% right on that, but it wouldn't be that as much as saying in its current form >> that it doesn't meet the standards. Again, it's debatable as to whether it would or

421
02:20:01.200 --> 02:20:17.520
wouldn't because you could come back with a dwelling there that does meet the standards and does prepare for sea level rise in the velocity zone. >> You just probably can't park vehicles under it. >> So,

422
02:20:17.520 --> 02:20:33.520
>> all right. But at a base level, I think what's shown does meet the standards now and does provide some things to mitigate, you know, some of those concerns. >> I would like to see the plan updated before I approve anything so that way there's not any confusion on what should

423
02:20:33.520 --> 02:20:48.560
and shouldn't be done. >> Okay, >> that is my input. >> Yeah, that's general >> consensus. Could I share my punch list with you here? >> I'm sorry. I'm sorry. >> Could I share my punch list with you here? [laughter] >> So, we don't have a tool. >> Yeah. >> Yep. Um, we talked about the flood

424
02:20:48.560 --> 02:21:03.920
vents. Um, we'll label up the crush stone for the driveway and give you a little section of inch and a half for the base and 3/4 over that. Uh, we'll put a note on there to cut the maple, but to leave the stump. Uh, we'll put a note on there about the spacing on the

425
02:21:03.920 --> 02:21:21.520
deck. Um, I think that was >> you had parking spaces in addition to the drive driveway. Um yes, >> you may meant the parking spaces because I don't Is there a >> section of driveway that's you you do

426
02:21:21.520 --> 02:21:36.640
have proposed crushstone driveway? So you are modifying the driveway. So be both driveway and >> Yeah, I intend I meant driveway and parking space, >> right? >> Uh plan update stream. >> Oh yeah. Okay. [snorts] >> Did we get the placids?

427
02:21:36.640 --> 02:21:52.960
>> Thank you. On the fence, >> but to be maintained in perpetuity as well. Yeah. post. >> And then um Mark mentioned >> Well, you could do the post, but I think you prefer. >> Yeah, he'd like the fence to look. >> Mark mentioned the one and a half inch stone under the deck. Same thing, gap

428
02:21:52.960 --> 02:22:13.439
graded, washed, all that. >> Yep. >> Okay. And then maybe um the specification on I don't think you need a full detail on it but somewhere the specification on the parking spaces and the driveway in terms of the depth of the furvious stone.

429
02:22:13.439 --> 02:22:28.720
>> Yes. >> Yeah. We'll give you a little cross I started sketching up a little cross-section here already. So >> nice. >> Any other questions for us? >> No, I just wanted to make sure that we agreed on the items that you were looking for on the plan. That's >> the events.

430
02:22:28.720 --> 02:22:44.399
>> Three weeks. Sorry. Uh, I did get the flood vents in here. >> Vents on there first. >> Yeah, that was the first thing. >> Oh, that's right. That's the first thing you said. I checked it off. Nice. >> Do you think three weeks I think meetings at August 12th, correct? Would that be sufficient?

431
02:22:44.399 --> 02:23:01.359
>> These are very minor. This couple of days really I mean even if the commission was comfortable enough to have us submit it before issuing uh order of conditions, that would be fine too. Whatever you guys comfortable with. Okay. >> I think the consensus was that you wanted to see updates.

432
02:23:01.359 --> 02:23:17.120
>> And did you need to re label the stream on the plan? >> That's on the list. >> And you'd like it called stream, right? >> Stream. >> Okay. >> Non-discriminating. Okay. >> We don't We don't need to fight that. >> You didn't care about the of unknown status. You're >> no stream.

433
02:23:17.120 --> 02:23:32.720
>> I think Yeah, that says it all. >> Stream. Stream. >> It's a stream. >> Stream. >> It's a stream. It has water in it. >> Protected area. >> It'll be stream on the plan. And you'd still have a special condition that would specify the commission's not >> right >> calling it >> typifying the stream or confirming the status.

434
02:23:32.720 --> 02:23:48.080
>> Just to be clear, the paperwork on the just resubmit the paperwork that was line seven line or item seven item eight. Strike that out unless you're willing to prove to us. Just amend those two so that it doesn't say that there

435
02:23:48.080 --> 02:24:05.280
isn't one. Just just check that there is and and and I'm fine with it. Yeah, there were a handful of things for the administrative record I think that should be updated as well. >> So, just just one minor comment on this plan of yours. >> Um, it says on the bedroom floor it says

436
02:24:05.280 --> 02:24:24.399
first plan. >> Excuse me. >> This says first plan when it's the second. >> Well, you know, the architect was >> just minor. >> Yes. Thank you. That was

437
02:24:24.399 --> 02:24:41.600
>> All right. So, if there's nothing else, do we hear a motion to continue? >> So, I'll make that motion to continue August 12th. >> August 12. >> Okay. Second. >> All right. We have a motion for Maryland, second by Megan. All those in favor say I. I. >> Opposed. >> Abstain. All right. That motion to continue to August 12th.

438
02:24:41.600 --> 02:25:01.680
>> Thank you. >> Thank you. >> Thank you. >> Thank you. Have a good night. >> All right. So, we got to jump back. We're in action items >> on >> 11 speech. >> I'm gonna hit the bathroom real quick. >> All right, we're going to take a five minute.

439
02:25:01.680 --> 02:28:12.160
>> If you want, Justin can present. >> Well, let's let's take a five minute recess. >> We'll take a five minute break. Thank you. Turn your mic off if you want. Okay, we're back. Uh, I will now open a public meeting to discuss the request

440
02:28:12.160 --> 02:28:29.600
for determination of applicability for 11 Graves Beach submitted by Strong Tree Engineering on behalf of the applicant, the town of Kingston to remove and replace the existing tennis courts within the 100 foot buffer zone to inland wetland resource areas. Uh, where

441
02:28:29.600 --> 02:28:46.479
this is the first meeting on this proposal. Uh, we will hear an introduction from the applicant. >> Yep. Justin Lamro, strong tree engineer again for Susa Woodworth at the Kingston Rec Department. So, pretty straightforward project. We have a wetland on the other side of the the

442
02:28:46.479 --> 02:29:02.800
tracks here. This is Grace Beach Park. Um the tennis court shown in both the existing and proposed here and the uh basketball court which is outside uh buffer zones. But we are replacing the tennis court in the exact same

443
02:29:02.800 --> 02:29:19.439
footprint. Uh we'll remove the existing asphalt. We'll regrade just to get out some of the uh low spots in the in the court and then we'll repave. The fence will stay in place. Um and we're not adding any impervious. We have silt sock

444
02:29:19.439 --> 02:29:37.080
around the entire perimeter and we'll put silt silt sacks in the uh catch basins that are adjacent to the project. Matt, do you have any uh comments, please?

445
02:29:37.359 --> 02:29:57.840
>> Sure. Um I get into discussions of the stream and how it is referenced on several other filings. Um I wrote the work proposed in this filing is not within riverfront area because the riverfront area runs perpendicular

446
02:29:57.840 --> 02:30:14.800
to the stream ends where the stream ends instead of wrapping around the bottom. So this is a buffer zone only project because this the stream comes out of a culvert just to the you know just past where the court is. Proposed works

447
02:30:14.800 --> 02:30:29.840
limited to the area of the existing tennis court will not increase existing impervious surface or cause other disturbance within jurisdiction. Work is mostly outside of the 50- foot buffer zone with around 59 square ft of the court inside the 50ft buffer zone to the

448
02:30:29.840 --> 02:30:47.359
southern BBW. Thus, the work is mostly in accordance with KWPR 8.01c1 01C1 particularly and that the tennis court is not changing in size and has been placed as far back as has been in place as far back as our local aerial imagery shows. I think maybe the 1990s this was

449
02:30:47.359 --> 02:31:02.080
>> that sounds right. >> Yeah, >> I started working on the praise beach around 2004. Yeah, >> give or take. uh sediment silt sock at least 8 inches wide is proposed for ESC around the north east and half of the south boundary of the court as well as

450
02:31:02.080 --> 02:31:19.040
silt sack in the downslope catch basins. Um the RDA asked not only for a determination on the work but also regarding the resource area boundaries. The resource areas adjacent to this project are not clear-cut and would require significant effort to determine beyond the scope of a simple project consisting only of restoring an existing

451
02:31:19.040 --> 02:31:34.800
paved area for public benefit. So I wrote commission should decide if the proposed location and type of ESC is sufficient to protect nearby resource areas from effects of the proposed work. The commission should not affirm the wetland boundaries. Should issue a positive 2B determination stating that

452
02:31:34.800 --> 02:31:51.520
no boundaries are affirmed as part of this review. Otherwise the project appears to meet the standards of WPA and KWPR and should be approved through issuance of a negative3 determination. So unless you have other questions or concerns, it would be issuance of a

453
02:31:51.520 --> 02:32:08.319
positive 2B and negative three determination. >> Okay. Uh we'll open up for discussion. Um any questions from the commission? Um is there anybody from the public that would like to be heard? >> No,

454
02:32:08.319 --> 02:32:25.439
>> no, that's his hand thingy. It's rain. >> So Matt, it sounds like a pretty straightforward project whether just uh >> removing replacing tents. >> Probably even easier than >> it's a CPC project, right? >> It is. >> Correct. So yeah, why do we know this project? >> I was going to say this is probably

455
02:32:25.439 --> 02:32:43.040
easier than even the the uh playground one was. It's just it's >> put essentially repaving, but you are grading. You're removing and grading. It's just >> you're putting back exactly what's there. you're protecting down slope. It's It's very easy to

456
02:32:43.040 --> 02:32:58.720
>> Are you doing the restriping as well? Like the line painting? >> It It's not planned to re the parking lot or the >> parking. Oh, yeah. Yep. We're removing the asphalt and >> it'll be uh painted similar to Reed School, the blue.

457
02:32:58.720 --> 02:33:14.479
>> Have you been up there? >> I have. >> Yeah. >> Okay. So Matt's recommendation is a positive 2B and a negative 3A DOA to uh >> so move. >> Do we have a motion? We have a motion from Megan. Do we have a second? >> Second. >> Second by Marilyn. All those in favor say I. I

458
02:33:14.479 --> 02:33:32.240
>> oppose. Abstain. >> All right. That motion carries for positive 2B and a negative 3 DOA. >> Thank you very much. Good night. >> Thank you. >> What do you need? >> That motion expired. Oh, I'm sorry.

459
02:33:32.240 --> 02:33:47.840
>> Next. >> All right. So, we will uh I will now open a public meeting to discuss the request for a certificate of compliance for 63 Christmas Tree Lane submitted by the law offices of Sataryi Sugaras on

460
02:33:47.840 --> 02:34:04.000
behalf of the applicants Daniel R and Moren E. Rosen planter for construction of a single family dwelling and associated utilities within the 100 foot buffalo zone to inland wetland resource areas. Matt, can you uh brief us on this?

461
02:34:04.000 --> 02:34:21.439
>> Yep. Uh COC's appear to have been issued to this property in 2017. Uh but during a title search, it was discovered the COC's were never recorded at the registry of deeds. Uh sellers could not locate the original copies of the COC's. they were advised to refile uh using the

462
02:34:21.439 --> 02:34:40.319
2017 engineer certification and asbuilt plan. There were three special conditions in the OC's. One was conservation agent inspection of ESC before start work, two contact agent prior to any dewatering and three conservation posts at the 100 foot no disturbance zone to the vernal

463
02:34:40.319 --> 02:34:57.520
pool in perpetuity. During the July 16th site visit, we observed the posts in place as depicted on the Asbuilt plan. Um there was some like slight degradation of the posts and signs, but like they were still fine. It's just it should be noted and will be passed along

464
02:34:57.520 --> 02:35:13.840
to the new owners that they will need to be updated whenever they are not visible anymore or whenever they need to be made visible. Um, we did observe some dumping of minor dumping of things like uh keystone,

465
02:35:13.840 --> 02:35:29.200
gravel, uh, mulch and like the plastic bags with the mulch in them past the rear boundary of the yard, but not past the conservation posts. So, jurisdictional um should be removed, but not a big deal, and it would be easy enough to get those removed. Um, the

466
02:35:29.200 --> 02:35:44.399
2017 engineer certification states the project was built in compliance with the OC's. We verified the property was largely in compliance with the OC's during our site visit including connection of the rear roof downspouts to the infiltration system. Um there have been some changes made to the

467
02:35:44.399 --> 02:35:59.520
property since the 2017 as plan. Uh the conservation agent uh previous conservation agent approved replacement of the existing deck uh with a slightly larger footprint through administrative review in July of 2019. And then between

468
02:35:59.520 --> 02:36:16.319
March and October 2021, approximately 600 square foot stone patio and path connecting to the front driveway were added at ground level off the back deck. Um, approximately 200 f feet of that is within jurisdiction. It does not appear that this work was permitted, though it was done within the existing lawn area

469
02:36:16.319 --> 02:36:32.080
very close to the house. Um, it does appear that it would be permittable, likely through an RDA. Um, and we measured out it's approximately 11% uh impervious surface within jurisdiction. So, it it meets the standards on that. So, the commission

470
02:36:32.080 --> 02:36:47.040
could require retrospective permitting for the stone patio behind the house before issuing a COC. They may also just determine that it's not a huge deal. It's it's a little bit of stone within a turf area. um commission should require the removal of any dumping and the new owner should

471
02:36:47.040 --> 02:37:02.319
be reminded that dumping is not allowed as well as what I mentioned with the conservation posts. Um I think we can handle all that administratively with the new property owner and I would recommend issuance of COC's on this >> a recommendation of

472
02:37:02.319 --> 02:37:19.280
>> issuing COC's with everything we discussed being handled administratively. Okay. If the commission wishes, like I said, you can make any of that a requirement before a COC is issued and we can just kick this uh to another meeting. But I think I think we can get it handled. Yeah.

473
02:37:19.280 --> 02:37:36.880
>> All right. We'll open uh discussion up for the commission. Any questions from that? No. >> Is there anyone from the applicant like to be heard? >> I don't think so. >> Is there anyone from the public that would like to be heard? All right. Hearing none. Um

474
02:37:36.880 --> 02:37:52.000
what what's the what's the consensus? Do we are we prepared to issue the COC's? >> I would be ready to issue the COC and again in keeping with Matt's offer to handle the discussion administratively

475
02:37:52.000 --> 02:38:07.359
with the loose ends of cleaning up the dumping and and those items. >> Okay. So Matt, um what's the wording we want to say on that? um subject to the close out of the issues we discussed

476
02:38:07.359 --> 02:38:22.319
here. We're voting. >> Yeah, I would say your vote is to issue the COC's with the agent handling any of the other issues administratively. >> Perfect. All right. >> I'm going to abstain from it's in my neighborhood and could have preceded my own property.

477
02:38:22.319 --> 02:38:39.439
>> Forgot this was in your area. >> All right. So, we have a motion from Maryland. We have a second by >> second by Dot. Um Brian's abstaining. We'll take a a roll call. All those in favor say I. I >> opposed and one abstension. So this is a

478
02:38:39.439 --> 02:39:02.640
401 vote. Um just for clarification purposes, the unpermitted roughly 300 square feet of patio and walkway. Does the commission It's in the turf area, right? >> Yeah.

479
02:39:02.640 --> 02:39:17.120
>> So, >> anybody does anybody want to see a filing on that? >> No. >> It's a I think it's a wrong direction for us to want a filing on that one. We can do what if we want, but the turf is the worst that it could be, right? And anything less than that, it's almost

480
02:39:17.120 --> 02:39:34.800
like we they gave it back. So, we all generally >> I'd be fine. Maybe explain to them that anything else needs to start coming for us. >> Yeah. Yeah. >> Communicate that there's jurisdictionary, I guess. >> [clears throat] >> All right. I will now open a public meeting to discuss a request for

481
02:39:34.800 --> 02:39:52.800
determination of applicability for 48 Pond View Drive submitted by the applicant. Um Steven Haynes for removal of two trees within a 100 foot buffer zone to inland wet wetland resource area. Matt um is there anyone from the applicant?

482
02:39:52.800 --> 02:40:07.200
>> No. >> Okay. Were we expecting >> I don't know. Um, this is one that we did a administrative review site visit for a hazard tree that was clearly in striking distance of the house. Um, I approved that administrative removal

483
02:40:07.200 --> 02:40:22.960
with leaving 6 ft of trunk in place so that it was short enough that it wouldn't ever fall over and hit their fence. While we were there, uh, one of the property owners inquired about two trees behind the the yard. Um, and I

484
02:40:22.960 --> 02:40:37.920
said that I I wouldn't really approve those administratively. Um, or that I I think I might have said that I would approve those administratively with the requirement that 10 to 20 ft of trunk stay in place. Um, and said, "Well, that I don't like that." And I said, "Well,

485
02:40:37.920 --> 02:40:53.920
if you don't want that laid in play staying in place, you can file an RDA. You know, they are things that are within striking distance of if not the house, the rear yard area. I think there's a pool. Um I said you can bring

486
02:40:53.920 --> 02:41:11.520
it to the commission for um having them review it to be flush cut. So I don't know if they were planning on on being here to discuss it. >> Okay. Well, >> we have no applicant. I think we just um

487
02:41:11.520 --> 02:41:26.640
either dismiss it or continue. >> Just continue. >> Make a motion. >> Give one chance to come back and then we put it. >> All right. Do I hear a motion to continue to August 12th? >> I'll make that motion. >> Second. >> Motion by Maryland. Second, Megan. All

488
02:41:26.640 --> 02:41:42.479
those in favor say I. I. Oppose. Abstain. Okay. So, that motion carries. 5 Z4 continues to August 12th. Matt, could you make sure that they understand that if they're going to have something before us that they either need to

489
02:41:42.479 --> 02:41:59.280
cancel or not? >> And was that continued to August? >> August 12th. Thanks. >> All right. Now we're going to move on to enforcement 22 whopping road. Um, could you brief us? >> Um, before you do, I'm going to recuse myself. That's my neighbor.

490
02:41:59.280 --> 02:42:16.319
>> Um, >> well, oh, okay. I was just counting how many people we >> Yeah. So, uh, yes, 22 Whopping Road. I had noticed from Whopping Road, being familiar with 24 Whing Road, which was originally subdivided from 22, that

491
02:42:16.319 --> 02:42:33.359
there was some understory, what looked like understory mowing it or cutting. It looked like somebody was cutting the understory underneath the trees. Um, I could tell I knew the Jones River flowed through back there, so I figured it was somebody trying to just cut the understory, make sure they could see the river or something like that. So, I sent

492
02:42:33.359 --> 02:42:49.120
a notice of violation um and went out and saw the property after the homeowner contacted me. Um and then we had a commission site visit uh earlier this week, I believe. Um where we had several

493
02:42:49.120 --> 02:43:04.560
commissioners on site. Um it was more than um I had anticipated. There was a lot more mowing. Uh there was clearing with a big machine. like there was a lot of riverfront area and BBW that was uh

494
02:43:04.560 --> 02:43:19.359
directly impacted, directly mowed. Um you know, trees taken out in some areas. Um you know, there were areas of of upland within the riverfront area that had been cleared and really kind of disturbed in a way that there really

495
02:43:19.359 --> 02:43:34.640
wasn't vegetation left. Um, you had a bridge installed across the river and what I would call, I guess, stealing pools in the river built out of rock, sort of, um, dams essentially. Um,

496
02:43:34.640 --> 02:43:51.760
couple of culverts on either intermittent streams or ditches that lead to the river. Um, essentially in talking to the property owner, he was saying he was just trying to create like a picnic area back there that he could hang out with his family

497
02:43:51.760 --> 02:44:06.240
and um, I explained jurisdiction how extensive it was there and and the requirements for permitting and and he, you know, he said, "I I understand. I understand. I probably shouldn't have done this and I, you know, felt bad about it. Wants to make

498
02:44:06.240 --> 02:44:24.240
it right." in between the initial site visit and the commission site visit, he had already made some repairs. Like I there was a really sandy exposed dirt area near right on the bank of the river. Um and I said, "You're

499
02:44:24.240 --> 02:44:40.960
going to need erosion control on this." And by the time we got back, he had in his own way, he had used a down tree to create, you know, a >> a sort of backs stop and had used some of the shredded uh tree material, wood

500
02:44:40.960 --> 02:44:57.439
chips or whatever or leaf litter to cover the area so that it was a little more um stable. Um, there was a a what I think was intended to be like an ATV or dirt bike track that was cut close to 24

501
02:44:57.439 --> 02:45:13.279
whopping road back around to that area and there was again a big area of random clearing that when I asked what was the purpose for that, he said that wasn't supposed to happen. Um, so there's there's a lot going on back there. Property owners working on it. He has

502
02:45:13.279 --> 02:45:29.120
engaged uh Brad Holmes. So, I'm not sure if there's a signed contract or anything, but I know Brad has been to the property to look at it, as well as I know Pine Dubois and Jimmy Powell from JWR have gone out there to look at it cuz they know the property owner. Um, he wants to do the right thing. Um, he said

503
02:45:29.120 --> 02:45:44.479
he's also in touch with Wildlands Trust about and has been in the past about um some sort of a CR or something in that area. Um he said that Karen Gray from Wildland's Trust is supposed to come to the site I believe on the 27th and had

504
02:45:44.479 --> 02:46:00.880
asked if we could continue this discussion tonight so that the commission didn't make any decisions. Um I told him that it was important to get the commission on site to see things and that it wasn't likely the commission was going to make any big decisions in one meeting. um that typically the way these things were handled is that if you're

505
02:46:00.880 --> 02:46:16.720
working with somebody on a restoration plan, which I understand he is, that typically we would just continue it for a month or so to wait for that restoration plan before issuing an EO. Um so it was pretty bad, pretty egregious. Um

506
02:46:16.720 --> 02:46:34.160
but we do have a property owner who is willing to do the right thing and and get restoration going. And I think in this case, a lot of it is going to come down to conservation posts and letting things grow back naturally. There will be some areas that will need planting or

507
02:46:34.160 --> 02:46:51.439
seeding or some form like that. Um, but largely the work that was done there is easily undone. Um, I just sort of told him for now, don't don't really do much else to fix it. I said he was talking about removing the bridge and I said just leave that in place, leave the

508
02:46:51.439 --> 02:47:06.720
little check dams and everything in place until we have a plan to properly remove everything to make sure it's all done right. So, >> any questions from Matt? >> He did specify that he was not going to be here tonight. Um I think partially just out of

509
02:47:06.720 --> 02:47:22.880
>> I wasn't going to say fear, but he was pretty nervous about being here and speaking to the to the commission. And I said, "You don't have to be." I said if and you know I said if you can't have somebody here speaking for you and you're not comfortable with it I said I can pass on to the commission everything that I saw here and the commission typically in enforcement issues is just

510
02:47:22.880 --> 02:47:39.840
happy to hear that somebody's willing to make it right which he was. So um if anybody has any questions I can answer questions otherwise my recommendation would be to push this a month give him time to work with a wetland scientist on making this right. If you have any re

511
02:47:39.840 --> 02:47:56.920
any requirements as far as anything in terms of stability, we could do that as well. Um, you know, I think what he did was was okay. It's not the best, but >> it was a sincere effort. >> It was an effort

512
02:47:57.040 --> 02:48:13.840
>> questions from Matt. >> I don't think you really need anything from us at this point. Correct. >> Uh, just a motion to continue. I guess >> I'll make that motion if that's what you want. And we'll say a month. >> Yeah, which would be August 26th.

513
02:48:13.840 --> 02:48:34.160
>> Okay, we'll have a mo we have a motion to continue to August 26th. Do I have a second? >> Second. >> Second by Brian. All those in favor say I. I >> oppose. >> Abstain. That motion to continue. Um carries. >> It's a beautiful spot you got back

514
02:48:34.160 --> 02:48:50.319
there. Yeah, >> I like I like seeing people use their property because that's that's a good thing. But might have miss >> miss some uh >> I'm like I want this riverfront >> and we have commissioner um

515
02:48:50.319 --> 02:49:05.439
>> McFarland coming back. >> Yes. >> Okay. So Matt 19 Blair Drive continued from an earlier date. Uh would you brief us? >> Uh continuence. So the

516
02:49:05.439 --> 02:49:20.000
representative uh Paul Brogner reached out to CCM to Jason Bartner. Jason asked for specific materials in order to be able to give some feedback. Uh Mr. Brognner provided those materials. Jason's feedback was that

517
02:49:20.000 --> 02:49:37.359
largely um his opinion was that there would be no ability to approve a revetment there. Um >> no to approve a revet >> a revetment. No ability. >> No ability. >> That is his, you know, that that's

518
02:49:37.359 --> 02:49:52.319
that's largely what I took out of the the letter. It it, you know, said a lot of things. Um, I haven't fully gone through to prepare it all for the commission yet, but essentially after that, uh, Mr. Brogna asked, you know,

519
02:49:52.319 --> 02:50:07.680
for continuance so that he can work out, uh, some of that and have a site visit with, uh, Mr. Bertner um just so that he can actually see the site to because he's basing all this on aerial imagery and and plans and everything that it would be good for him to see the site.

520
02:50:07.680 --> 02:50:24.560
He might have the same exact feeling at that point. Then it's up to the applicant and how they want to go about things and then up to the commission how they want to handle it as well. Um, I know at one point, you know, the chair mentioned that, you know, you potentially will have a situation there

521
02:50:24.560 --> 02:50:39.439
where you have one unprotected property between two existing houses that predate those regulations. Um, but there are things that the the applicant can do to try to, you know, get at some of that or mitigate some of that. Um, so it's back on their court. They're going to try to

522
02:50:39.439 --> 02:50:55.680
schedule something with CZM to get down to that more. Uh, so my recommendation was to continue to August 12th. So, we have a recommendation to continue to August 12th. Do we have any questions from Matt or >> we all right? We're continuing to 12th. >> Do I have a motion to continue to August 12th?

523
02:50:55.680 --> 02:51:10.800
>> I'll make the motion. >> All right. Motion by Brian, second by Marilyn. All those in favor say I. I. >> I. >> Opposed? >> Abstain. So, that motion par carries 50. >> Six Prospect Street continued from an

524
02:51:10.800 --> 02:51:28.960
earlier date. Matt, do you have an update? >> Yeah. Um and just I guess procedurally I would caution the commission even discussing this one much. You know we have a situation where we've is we're issuing fines still. There's four different violations. Fines are being

525
02:51:28.960 --> 02:51:44.800
issued. Uh that's that's continuing. My understanding is that um Mr. E has appealed the initial batch of fines to the magistrate's office. I haven't received any word on that yet, but we'll see um what happens there. But it wouldn't surprise me if if something

526
02:51:44.800 --> 02:52:02.160
like this ends up in court one way or another. So, I would just caution the commission on on discussing this in open session and say that I'm still issuing fines and coordinating with town council >> and no update on on addressing the site

527
02:52:02.160 --> 02:52:18.160
conditions that um resulted in the fines in the first place. Nothing. Okay. So, no, no action. >> All right. Um, well, we don't need to continue something that hasn't been opened. Um, >> so you'll keep us in >> that will just be on

528
02:52:18.160 --> 02:52:34.640
>> the agenda going forward. Yeah. >> Unless you specifically want to kick it down to a particular date. It will just be on the agenda until it's >> keep it rolling. >> What I would ask is I would ask that you review the situation with council. I'm sure you have and make sure that um

529
02:52:34.640 --> 02:52:49.840
council doesn't have any direct guidance for us on this. >> Yeah. And I and I have and um if you know if we think that um executive session is something that would be needed um you know fitting into

530
02:52:49.840 --> 02:53:07.200
the specific reasons why you do that then we can definitely do that. But for now, we'll just we'll just keep continuing this and we'll keep um going until we hear something back in terms of any change, which I haven't in a while. Just my take on executive session is is

531
02:53:07.200 --> 02:53:21.600
everything we do is above board and it's in front and if it comes to a legal situation, then it's probably out of our hands and it becomes a you know a town leader um town council discussion. So yeah, we've done I think what you know

532
02:53:21.600 --> 02:53:42.880
the town bylaw requires and and you know just knowing that it's no update is is enough of an update for us I guess. Yep. >> Um Jones River Estates. Matt, can you brief us on that? >> Ask me the >> Yeah. So,

533
02:53:42.880 --> 02:53:59.200
in several situations, um, there have been developments that have gone poorly in Kingston that were not wrapped up by the developer. Um, particularly orders of conditions and COC's. There's a ton of them out there where they got a

534
02:53:59.200 --> 02:54:16.800
partial COC and then never followed up with a final once they got the final occupancy and and all that. It's a pattern. Um the Jones River Estates development was in progress when I started here. Um it went

535
02:54:16.800 --> 02:54:34.880
relatively poorly from a from a site management perspective. Um there weren't too many wetlands related issues there. Um but there were issues where one developer I think walked away from it and the other one finished it and it it was a little messy towards the end. Um,

536
02:54:34.880 --> 02:54:51.359
at this point the permit has expired and there is no COC on the project. So, um, I put together enforcement orders under KWPR and WPA to compel the

537
02:54:51.359 --> 02:55:07.120
applicant of record, which is the original developer on the project to file a COC as is required by the orders and conditions. Um, in this particular situation, the LLC that was used for,

538
02:55:07.120 --> 02:55:24.080
you know, building the project for getting the orders of conditions has not been dissolved. Um, hence just having you sign the enforcement orders and not going through the process of sending out a notice of violation, which then would likely result in the LLC being

539
02:55:24.080 --> 02:55:37.840
dissolved. Um, in this case, we do have the actual person in charge of the LLC, their name is on the the permit itself anyways. So, uh, we do have that, but it's sort of a two factor thing where you do have both

540
02:55:37.840 --> 02:55:54.960
entities still solvent. So, um, essentially what this does is it's to Donald Gillespie and Wellby Builders LLC and we are ordering the filing of a

541
02:55:54.960 --> 02:56:10.720
complete request for certificate of compliance for work performed under OC's issued under D and KWPR file number SEO 0370852 and that's the applicant of record for the project located at 1517 and 19 whopping road One of those is Dot's

542
02:56:10.720 --> 02:56:27.760
address. Um, but this is because the property was subdivided. So, the lot numbers that are listed here, lot numbers 46, map number 44, lots numbers 46, 461, and 462 have all been subdivided. Now, this is all the, you

543
02:56:27.760 --> 02:56:43.680
know, Captain Captain Jones Way and Barrowsbrook Circle. Um, these OC's were only relevant to, I believe, two of those house lots. Um, the rest of it was strictly for road and storm water

544
02:56:43.680 --> 02:56:59.439
layout, things like that. Um, so it's not necessarily a matter of it being a problem for every homeowner having to do their own thing like we've seen on a lot of these before. Um, but still we want to make sure the developer closes things up the way they're supposed to.

545
02:56:59.439 --> 02:57:16.479
>> Hey, I um appeared before the commission regarding my numbers, my um street number. on there and asked it be removed. >> Mhm. [clears throat] >> Uh I can only assume it was. Perhaps it wasn't, but it would be on the original papers. >> It was on the original papers, so that's

546
02:57:16.479 --> 02:57:32.479
why it's on here. Just But there should be nothing here that ties ties you to this. If you want to recuse yourself because you're in a butter to it or because your lot was included in this or no, whatever, you're welcome to, but you don't have to. >> I don't need to. Um, but what this says,

547
02:57:32.479 --> 02:57:49.279
it goes through facts um [snorts] detailing when the orders of conditions were issued, when they were extended, and when they um expired, and it talks about a request for a partial COC being dismissed given that the work the

548
02:57:49.279 --> 02:58:06.560
request was unnecessary. Um, and that was while work was still going on. That was in 2019. Um, and it says at this point the permit has expired. All work appears to complete and no RCOC has been filed. Remedial actions to be undertaken are the applicant shall file complete WPA and

549
02:58:06.560 --> 02:58:22.080
KWPR requests for certificate of compliance with the Kingston Conservation Commission for work performed under that file number by September 24th, 2026. Any certificates of compliance subsequently issued by the commission shall be recorded by the applicant at the Plymouth County Registry of Deeds within 30 days of

550
02:58:22.080 --> 02:58:38.399
issuance and does the usual failure to comply with that is $300 a day. So, if the commission has any questions, I can answer questions. Otherwise, I'd look for a motion to issue these enforcement orders as written, and I'd have you sign them tonight and we'll issue it tomorrow.

551
02:58:38.399 --> 02:58:54.640
>> Okay, I'll make that motion. >> Any questions for Matt first? >> All right. Perhaps we have >> because No, because it's crystal clear where we're heading. >> I don't question. >> No, we don't have any questions. >> We We're done with the questions.

552
02:58:54.640 --> 02:59:09.840
>> Do we No. >> Do we have a motion? I was trying. >> I know, but you steps. You got to step dancing too fast. All right. What do you What What do you What's your motion? >> My motion is >> is the enforcement order >> to issue the enforcement order. >> All right. We have a motion by Maryland.

553
02:59:09.840 --> 02:59:26.640
Do I have a second? >> Second. >> Second by Dot. All those in favor say I. I. Opposed. >> Abstain. Motion to issue the enforcement orders passes. 500. It's pretty contract. >> All right. Matt, do you have those ready

554
02:59:26.640 --> 02:59:41.520
to sign? >> Yes. There's two signature pages. >> Do you want just to pass the signature pages? >> Everybody's he read it. We're all good with the pages, right? >> There's one.

555
02:59:41.520 --> 02:59:56.160
>> There's two. >> Uh, date >> 27. >> 22nd. We are way ahead of time. >> It's Yeah. 7:22. >> Put another two on that. Oh jeez.

556
02:59:56.160 --> 03:00:19.279
>> There you go. Too many twos. >> It's not even. >> Okay. Um, so it looks like we're into the updates while we're signing. Matt, do you want to provide an update on 12 Alpine Run Road administrative approval?

557
03:00:19.279 --> 03:00:34.000
>> Yes. Uh, property was sold. uh new property owners wanted to remove three hazard trees uh within what was the 100 foot vernal pool envelope when the property was built um

558
03:00:34.000 --> 03:00:50.240
being 100 ft from mean high water. We approve or I approve the removal of two white pines and one oak within the 100t vertal pool envelope. I mandated the typical 10 to 20 feet of bull to

559
03:00:50.240 --> 03:01:06.240
remain on the two trees that were behind the house on the slope on the top of the slope that leads down towards the wetlands and vernal pool and the pine that was out in the lawn area. I said flush cut.

560
03:01:06.240 --> 03:01:21.040
>> Any questions from Matt? >> All right. How about ongoing projects? I'll give you nothing on really like general projects um other than um

561
03:01:21.040 --> 03:01:38.640
I issued a notice of violation today to the developer of the Barrowsbrook Village 40B. Um that's three Rivers Drive Sun I believe it's Sunset Circle. Um, this has been a sort of known

562
03:01:38.640 --> 03:01:54.479
problem for a long time that the the project was never fully finished and closed out. Um, either from the comprehensive permit standpoint, which is ZBA issue, or from a conservation commission issue. So, I realized that there was never a COC issued on it. Um,

563
03:01:54.479 --> 03:02:09.520
and there's there's major concerns there with um, you know, there was a bridge that was built, there were extensive storm water features that were installed there. Um, and there's supposed to be ongoing maintenance of all of that. And

564
03:02:09.520 --> 03:02:25.279
the permit was very specific on how this was all supposed to go. And [snorts] it was all supposed to be part of homeowners association maintenance documents. And the homeowners association would be responsible for all of this maintenance. Um, and from what I have gathered, the homeowners

565
03:02:25.279 --> 03:02:40.640
association was enacted but never funded like never transferred fully from the developer is is what I understand. Um, regardless, at this point, it's just that the developer never filed for a

566
03:02:40.640 --> 03:02:56.000
COC. The developer, as far as I can tell, still owns all of the open space land that was supposed to be preserved as part of this development. Um, some portions of this are only relative to the comprehensive permit and not the OC's, but some of them are related

567
03:02:56.000 --> 03:03:12.479
together because it is certain things that you know you can't really have compliance with the OC conditions unless you have a functional homeowners association. Um, so it might be messy in this particular one. Um, the LLC that that received the permit and built the

568
03:03:12.479 --> 03:03:27.840
development, Delwin LLC, was dissolved I think in 2019. Um, but again, the permit also has the name of the person responsible for the for a Delwin LLC, which was Peter Delprit. Um, so I sent a

569
03:03:27.840 --> 03:03:43.840
notice of violation to Peter Delprit today saying that he's in violation by not having filed for a COC and that there are issues there that likely need to be dealt with and that he should get in touch with my office um as soon as

570
03:03:43.840 --> 03:03:59.200
possible to discuss, you know, his plan for getting into compliance. and I said that this would be put on the September 23rd agenda um regardless of of whether he reaches out or not. So it gives him the time to come in and have conversations and talk about a plan

571
03:03:59.200 --> 03:04:18.720
forward or if there's nothing over that time period then in September it can be as simple as the commission having a meeting and I can give you more facts on it and you can vote to issue an enforcement order same as we did earlier. >> Questions? >> All right. Um, is there anything else,

572
03:04:18.720 --> 03:04:35.920
Matt? >> Uh, just signing another document that you approved earlier. It's on the green thing. This is the, uh, DOA for Reed Street. We were able to prepare it in advance in case the commission was interested in this.

573
03:04:35.920 --> 03:04:52.160
>> It's a single signature page, right? >> Yeah. Yeah. It's a combined permit. [clears throat] >> All right. Well, uh, the next meeting will be held on August 12th, 2026 starting at 6:30 p.m. The time is now 9:15.

574
03:04:52.160 --> 03:05:06.040
Uh, do I hear a motion to adjurnn? >> So moved. >> Move by Megan, second by second Brian. All those in favor say I. I. Opposed. >> All right, that motion carries.