WEBVTT

METADATA
Video-Count: 2
Video-1: youtube.com/watch?v=SjoKG8AWgj0
Video-2: youtube.com/watch?v=t4SSm66dILw

Part: 1

1
00:00:00.000 --> 00:02:30.720
--------- [BLANK_AUDIO] [BLANK_AUDIO] [BLANK_AUDIO] >> Sorry. the draft budget going into 
this fiscal year. As you know, there's a lot of moving parts in the budget with 
lots of different revenue streams and expenses, but I do want to preface this that this is 
a tight, tight budget year. And you're gonna kind of be seeing some of the factors that 
are affecting this budget. And with that, I'll turn it over to our CFO to kind 
of give us our first walkthrough. - Good morning. - Good morning. So I just 
wanted to start out saying we're gonna do the workshop presentation a little bit 
differently. We changed it up last year,

2
00:02:30.720 --> 00:03:06.080
we're changing it up again. We're going to 
start with the general funds this year and go into capital as time permits. And each 
person is gonna be presenting a different area, so I'm gonna let them introduce 
themselves as they come up to the podium. And we will have an opportunity to ask 
questions after every section, but if you want to ask something as we're moving along and 
it's important to you, please feel free. You don't need to wait till the end of the section, but we 
will have an opportunity to ask any questions. So all of the documents we'll 
be discussing, which is a lot,

3
00:03:06.080 --> 00:03:38.360
we put it in one book this year. - 
Thank you. - Thank you. - Are included, including the budget ads are in the back, and the 
full capital plan for the 10-year plan with the associated projects are in the back. We won't 
go over that in detail, but if you have any questions after you review the details of that, 
please feel free to reach out about that too. So we're gonna start with the trim timeline. 
So Florida law is very specific in defining the process and the timeline that we have to 
follow when adopting the budget and the ad

4
00:03:38.360 --> 00:04:08.960
valorem property tax millage rates. This official 
kickoff begins on July 1st each year and that kicks off with the certification by the property 
appraiser of taxable value. And the actual budget development process begins much earlier though in 
February internally staff are working on that and receiving requests from staff on the new budget 
year. We are required to hold two public hearings on the proposed budget and millage rates and 
the first hearing is scheduled for next Tuesday,

5
00:04:08.960 --> 00:04:39.120
July 21st at 6 p.m. and the second and final 
hearing will be on September 8th at 6 p.m. So we had things, again, as Dr. Legg said, our budget 
development this year. The biggest challenge that we have is continuing of the declining enrollment 
and I know Chris gave you a presentation and he has some slides that he's going to be talking 
about that further along in the presentation but

6
00:04:39.920 --> 00:05:12.160
you know we continue to have the hurdle 
of aligning our funding and resources to the available appropriations in order to balance 
the budget and as Dr. Legg says it has been very challenging this year And we'll go over some 
further details as we get into the summary ad. Other factors that continue to impact our 
budget are minimal increases in state funding, employee benefit costs, and the rising 
costs of materials, equipment, and supplies. The district is fortunate to have the 
salary referendum and the voted additional

7
00:05:12.160 --> 00:05:48.400
millage in order to provide additional 
salary support to eligible employees. So that was our positive and 
continues to be our positive. So the total tentative budget, and the budget 
is required to adopt the balance budget each year for all funds under its authority. So 
I know we talk a lot about the general fund, and it's the main and largest fund of the 
district. However, you have to approve a balanced budget for all funds, and all funds are 
included on this page. If you compare the prior

8
00:05:48.400 --> 00:06:19.600
year to this year, we are down about.9% 
total. And if you look across the lines, it's mainly related to capital projects, spend 
down that we've had, and large construction projects that we've spent down those bonds 
and proceeds and completing those projects, and then debt service payments that 
have also been reduced in the budget. The general fund has a slight increase of 2.3%, but this is mainly due to the additional 
revenue that's included in our budget for

9
00:06:19.600 --> 00:06:56.160
charter schools and FES. The district's actual 
funding from the state is down $2.1 million. All other funds that are listed below there 
are either allocated by law agreement or a restriction of use. So for example, the Internal 
Service Funds includes the health insurance fund and those funds need to be restricted 
for that use in that fund to provide the documentation that we need for the state.

10
00:06:56.160 --> 00:07:30.400
The next slide, four, we'll go into the 
actual budget summary ad. This includes the proposed millage levies, the revenues, 
expenditures, and fund balances by each fund. This form will be in the advertisement. 
It's required as part of the trim notice. So for the prior fiscal year, we adopted 
a budget that projected drawing down $13.5 million in the general fund. At this time, the 
fund balance that's included in the summary

11
00:07:30.400 --> 00:08:03.360
has a reduction of approximately $7 million. 
So we have spent down $7 million of reserves versus the projected 13.5 million. Although this 
outcome is $6.5 million better than expected, the district has not experienced an actual 
decline in fund balance in many years since I've been here. I did look at some prior 
budgets before I've been here and typically you did approve budgets that were spending 
down fund balance but that wasn't actually what happened and that was mainly due to 
our allocated positions and vacancies.

12
00:08:03.360 --> 00:08:39.760
As our vacancies continue to decline, we 
don't have as much remaining in budget to actual to be able to roll forward. So we 
are going to experience spend down this year. So 25-26 is not finalized yet. I believe this is 
the worst case scenario that you have here and it will continue to get better between the tentative 
and final budget. We have a lot of things that are accrued at year end that we look at expenditures. 
The biggest portion of our expenditures are posted which are salaries and benefits, but we still 
have to look at accrual. So we expect this number

13
00:08:39.760 --> 00:09:12.320
to be a little bit better once you see the final 
budget, and we don't expect it to be any worse. So if we look to the fund balance for the new 
fiscal year of '26, '27, we did balance that utilizing $10.4 million in reserves from the fund 
balance. And as we work through the closeout, as I said, We will continue to adjust revenue 
sources and look at expenditure requests. We'll look at budget to actuals. 
We continue to do those reviews to

14
00:09:12.320 --> 00:09:46.240
hopefully improve that final amount that you 
will see in the final budget in September. I did wanna point out that the fund balance 
amount included does continue to meet the board's goal of the 5% of expenditures. - 
That's my question. - Yeah. (laughing) - I knew that would be the big question. And we 
have really struggled like for the new year, 26, 27, we are right there at 5%. We cannot go 
below, we cannot draw down fund balance again. This is the last time. And again, the actual 
outcome when we get to this time next year

15
00:09:46.240 --> 00:10:19.040
may be better than projected, it typically 
is, but we have to plan and allocate and budget for all of our positions as if they 
were filled, right? And this is very close, I don't like being this close. I don't 
like drawing down on fund balance. So I'm very conservative in those areas. So 
we will continue to look at expenditures and everything through the year. And we, you 
know, at our 10-day count, look at our counts. Hopefully they're increasing and they'll 
continue to go down. But we -- on next year, this year will be about -- if we were to 
close today, which I know is going to be

16
00:10:19.040 --> 00:10:54.480
better than what we're projecting, you 
would have about a 5.3 percent reserve. But the new budget is right exactly at 5 
percent. and that's how we balanced it. And again, I talked about our actuals have 
typically trended better than budgeted amounts and any further drawdown though would 
go below our 5%. So we will continue to monitor the budget to actuals and 
provide updates to the board as they become available. - Thank you. - I have a 
quick question in the record. 'Cause last

17
00:10:54.480 --> 00:11:28.560
year I think we were at 6% for our reserve. 
And so with that 0.9% decrease for this year, I know you mentioned some of that had to do 
with capital projects and debt service, but do we foresee that in the next coming fiscal year 
that we would see another percentage decrease? I know that that's a bit far out to 
project, but is that something we need to be mindful of? - Yes, that's what 
I said. When we talk this time next year, if we draw down what we're projecting, which I 
hope won't be the case, - Yes, we would have to

18
00:11:28.560 --> 00:12:01.040
have serious discussions to be able to balance 
the budget. - For our reserves. - For our 5% reserves. - Thank you. - Yep. - I just wanted 
to clarify that for our listeners. - Yes, yes. - Can I ask you a quick question? - Sure. - If 
you don't mind. So is this tentative budget page, it's out there by any chance? Is anybody has-- 
- It will be posted by Thursday or Friday, it has to be. - Is there any way-- - Within 
two to five days of your tentative budget hearing. - Great. Is there any way possible to 
put a little start right next to the general fund? I just, you know, when people look at 2.3% 
increase, they automatically assume that,

19
00:12:01.040 --> 00:12:34.640
you know, we got all this funding that is 
coming in, $26 million. So is there any way possible that we can showcase that that 
is due to charter schools and FEFEs so that people can relay that that's money that is passed 
through, not an increase, per se? - We can't put anything in the budget summary that you see on 
page four. That is determined by trim process. and has specific requirements. We could add in, 
'cause we post online now, not in the newspaper, we could add some language at the bottom of 
the-- - Yeah, I think some clarification as

20
00:12:34.640 --> 00:13:05.440
to the 2.3% will go a long way for the 
community. - Yep, and that's the other thing I wanted to point out too. Included in our 
revenues is charter schools and FES. However, FES doesn't actually flow through to 
us. So when you see the third calc, you see a large, very large budget 
amendment taking those revenues back out. So right now we have a revenue and appropriation 
that equals each other to balance the budget, but that actually comes out where charter 
schools are a little bit different. We do

21
00:13:05.440 --> 00:13:37.360
receive those funds and then we disperse them to 
the charter schools. - I just wanna make sure the community understand that we just didn't see a 
$26 million increase. - Yes. - That's all. - Yep. Thank you, Mr. Hernandez. So the next page 
just details a little bit more general fund appropriations and this page will be included in 
the tentative budget book that you will see posted later today and have for next week. And basically 
this is just detailing that, you know, 90.7% of

22
00:13:37.360 --> 00:14:09.280
our appropriations are allocated at school level 
expenses and as we continue to celebrate our success as an A district, you know, we want to 
continue to prioritize our strategic plan and the goals when we do our budget development. 
>> Absolutely. >> So that was it on my slides. Is there any questions before I'm going to have 
Janie here come up next, our director of finance. Any other questions on those slides before we end it over? Good. Thank you. 
>> Thank you. >> Thank you.

23
00:14:09.280 --> 00:14:41.120
>> Good morning. >> Good morning. Thank you 
for having us. So I'm gonna go over a little bit of what Tammy touched on, but I'll go more 
in detail. So some information on our declining enrollment. When you look at the overall total of 
FTE that we are projecting for the year, including charter and FES, we are looking at an increase. 
the traditional district is projecting a 2,301

24
00:14:41.120 --> 00:15:20.240
FTE decrease. We hope on the 10 day count that 
is not what we see, but that is our projection. In this coming year, we do have two new 
charter schools opening, Matter Academy, Northwood Elementary School and 
Middle School. And the charters are expecting to see an increase of 
1,334. and FES were projecting 1,899. So a little bit more about FES. We continue to 
see this program increasing. And this coming year,

25
00:15:20.240 --> 00:15:56.080
we're expecting an increase of $16.5 
million of our FEFP funding going to FES. Like Tammy said, the FES is included in 
our original budget and in the third calc, we do remove that budget. The budget is 
$87.5 million. This is a net amount. So FES, the amount is $106.1 million and it's netted down 
with our state funded discretionary supplement,

26
00:15:56.080 --> 00:16:35.600
which is $18.5 million, which 
gets us back to the 87.5 million. Going into our employee benefit costs, this is 
a large portion of our benefits that we provide our employees for the 2026 calendar year. So 
the benefit costs are based on calendar year, so it will change in January this coming 
year. But for 2026, the calendar year was 9,500 and 4,000. $49 per employee and this 
includes medical life and EAP benefits.

27
00:16:37.200 --> 00:17:12.400
This past year the insurance committee has worked 
extensively on reviewing our expenditures and making planned design changes for the calendar 
year 2026 which we have seen a benefit into those changes. The team is continuing 
to evaluate for the 2027 year. And we do predict some more plan design changes 
and the anticipation of having a new vendor come on for the 2027 year, which 
we expect to help with the financial

28
00:17:12.400 --> 00:17:43.920
stability of the insurance fund. - That's 
good. - Is it expected to help employees? - Yeah. - Yeah. - And employees. - Because that's 
been an ongoing concern. - Concern. that we hear from employees. Is that access to providers? - 
The cost, it's gone up. - There are copayments and things. - We are hoping when we did 
the bid for the vendors, which will be, I think, later today for your approval, 
we do hope that the change will help to

29
00:17:43.920 --> 00:18:22.480
impact the employees and we'll be able to 
make plain design changes for them in mind. - Thank you for working on that. One benefit for this year is the Florida 
retirement rate, which we are all thankful for, but they have decreased the rate for this 
coming year, which did impact the district. The FRS expenses on this graph are for 
all funds, so not just general fund, they're all funds and we're predicting a decrease 
of 2.9 million dollars for the FRS retirement

30
00:18:22.480 --> 00:18:53.040
rates. And that reduction is overall that's not 
per employee rate and that's is that because we've had a reduction in allocation? So it will be a 
combination of a reduction in allocation and a reduction in the percentage. Okay. And then that 
rate is for every employee. The regular employee, yes. Yes, there are different rates. 
- Not special class, right, right, right. - And there are different rates for drop. So this is just regular class.

31
00:18:56.640 --> 00:19:27.200
Some FEFP funding changes. This year we 
did see an increase from the state for BSA, the base student allocation of $85. And 
then the total funds per unweighted FTE also increase by $257. But like Tammy mentioned, 
the overall, due to declining enrollment, the district is actually projecting a 
$2.1 million decrease in state funds. And

32
00:19:27.200 --> 00:20:01.280
within these funds includes a lot of restricted 
programs, such as safe schools, mental health, and academic acceleration, which was a new 
categorical that the state included last year. And those are fully funded, so we 
have to go back and add them up. Then going into a little bit about the 
millage that we levy and the resolution will be provided to you next week. The 
state requires, or the legislator sets,

33
00:20:01.280 --> 00:20:37.840
the state required local effort, and the 
district has that limited flexibility in setting the millage rate. State law requires 
the district to levy the full discretionary amount in order to receive the state education 
funding, which is, I'm sorry, $618 million. So within our millage levy, you can see a 
history. We have the capital outlay tax millage, which goes into our capital millage fund 
that the team will review later on. The

34
00:20:37.840 --> 00:21:09.120
general operations tax millage is set to 3.684 
and within this amount is our discretionary effort mill of 0.748. And then thankfully 
we do have our additional voted tax millage which you will also refer to as referendum 
funds of our one mill for the total of 6.84. - But even then, it's gone down. - Yeah. - It's 
still lower than last time. - It's still rolled

35
00:21:09.120 --> 00:21:45.360
back, yeah. - It is, yes. - 6.2 last time, now 
it's 6.18. - And the property value has to deal with that since our property value continues 
to increase our smillage is able to decrease, so it is. - Yeah, but I think though in that 
same regard, If that were the full case, we would have seen an increase in the 
RLE in like 2008 and we didn't. Right? Because there was a housing bust. 
So I feel like that's a little bit, yeah. >> Still every year rolls back. 
>> Yeah. And so the next slide you can

36
00:21:45.360 --> 00:22:15.520
see year over year that we are seeing a 
decrease of.09 mill for this coming year. And under this proposed millage rate the owner 
of a $350,000 home after the deduction of the homestead exemption would pay $2009.80 
which is a decrease of $29.25 compared to

37
00:22:16.720 --> 00:22:47.840
last year and that's if their 
property value stayed the same. So one thing that we are very happy that 
our citizens have voted for is the salary referendum revenue and thankfully that was 
approved in August of 2022 and this will be on the ballot in November of 2026. 
And one thing that we just want to set

38
00:22:48.480 --> 00:23:20.560
and make others aware is if this does not get 
approve this could be a reduction of an average of 12% for the eligible employees that are part of 
this program and those employees include teachers, bus drivers, food and nutrition staff, custodians, 
ASAP employees, IAs and with this funding the district has been able to increase the starting 
teachers salaries by $3,000 with an average

39
00:23:20.560 --> 00:23:58.000
teacher supplement of $6,050. In the projected 
revenue for this coming year is $67.7 million. In this I can speak for my department. I have 
seen a benefit of these funds for my staff and retaining the staff because we're able to be 
more compatible to salaries around the state. We always appreciate, we always express our 
appreciation to the voters for that but I

40
00:23:58.000 --> 00:24:31.120
also want to emphasize something that I think 
sometimes people miss is that we do have that citizens oversight committee and they do meet 
and analyze and ensure that we're spending the money the way that we said we were going to 
spend it so we do have people separate from the district that continue to meet and look 
at it for our voters, our taxpayers. And they do ask very good questions about what we're 
spending our funds on. Thank you. And then the

41
00:24:31.120 --> 00:25:01.920
next slide is our staffing allocations. This 
is going to be the comparison of all funds, which I know Kevin and his team also 
presented back a few board meetings ago, but the overall decrease for staffing is 476.12, 
and the general fund decreases 235 allocations. >> Madam Chair, on this slide, I just wanted to 
point out something just to draw your attention

42
00:25:01.920 --> 00:25:36.960
to you because it's a trend line that's 
underneath the -- kind of the surface, but it it pops up in the budget. If you look 
at, you know, most, the staffing reductions are a result of the declining enrollment, but 
you'll see one line item in specifically that you see a pretty significant increase in 
staffing, and that's our ESC population. While we have a declining enrollment in our 
overall population, we have a straight up arrow in kind of our ESC population, 
and the intensity of needs that they

43
00:25:38.080 --> 00:26:09.520
need to be serviced as well. We've 
made it a priority of this district over the last 18 months to ensure that our 
classrooms are focused on instruction and we provide support and the necessary services 
for our students and we continue to do so. But I wanted to emphasize those, 
the revenue that's created through the ESC allocation does nowhere near 
cover the cost of the ESC services. If you read in between the lines of what I'm 
saying is, we have an ESC population that is

44
00:26:09.520 --> 00:26:43.120
growing and we don't see it slowing down and 
it's an expensive prop, expensive to do and it has effects throughout our whole district. So, 
you know, and then I may not have a specific question on it, but we do have one line item with 
increasing allocations and that is specifically to service our ESC population because of the 
needs that they have and the growing population. And what I'm hearing from our colleagues around 
the state, and I don't have the data here to show

45
00:26:43.120 --> 00:27:16.960
it, but I can just say anecdotally what 
I'm hearing from other superintendents, we're not alone that the ESC population is 
significantly growing in our schools. So I just wanna make that aware 'cause it is 
adding an additional layer of complexity as we staff our schools, as we go into the 
classrooms and we make sure that we provide the level of service students need while 
at the same time focusing on academics. And finding people to fill those positions has 
been challenging too. And that's a great point too, because what I see on the health side of 
the House is about a 15% growth year over year.

46
00:27:16.960 --> 00:27:49.840
So that will continue. At least the trend is that it will continue to actually showcase in 
these numbers, probably a higher rate. I just also wanted to point out that the state 
did provide a declining enrollment supplement to a lot of districts that originally when I 
looked at it, I thought we would be eligible for because of our declining enrollment and we 
did not receive that because our weighted FTE had gone up and they based it on weighted FTE 
which has to do with our disabled students and

47
00:27:49.840 --> 00:28:20.920
other factors for those higher factor students. 
So it was a little bit disappointing that that's the number they used but we were not eligible 
for that because our weighted FTE had gone up even though our unweighted went down. - 
Did they also end up factoring in, like if we're a rural district to that too, I couldn't 
remember if they tied it to that piece as well. - They do that in every calc, but we 
don't ever qualify. - Yeah, I know. I wasn't sure if it was or or an A. - Yeah. - Yeah.

48
00:28:20.920 --> 00:28:51.680
- Are there any other questions? 
- I do. - Okay. - On page 10, when you talk about those limited, I just want 
to-- it's kind of a comment. Those limited funds that are restricted for those specific 
purposes like mental health, safe schools, and academic acceleration options, correct me 
if I'm wrong, but they'll give us some money, but we still-- it's never enough, so we 
still have to fund extra for that, right? I see Ms. Taylor shaking. OK. I just 
wanted to point that out because I know every budget student and I do point that 
out. And it's-- I know especially safe schools,

49
00:28:51.680 --> 00:29:29.280
that's something that we're constantly 
having to put extra money into. So while it looks like we might have an increase, 
we really don't. Chief Baumister I know works hard in trying to find other resources and 
grants to help supplement that. Well we'll move on to the capital plan and I will welcome 
Chris. Good morning Mr. William. Good morning. Good morning. So kicking off the capital plan for 
this coming year and so we In putting together

50
00:29:29.280 --> 00:30:02.480
a capital plan every year, there's several goals 
that we take a look at in looking at projects for the capital plan, and those are outlined on this 
next page. And so we're always seeking to be very proactive with our capital plan. You know, in the 
past you've seen districts who are well behind in keeping up with HVAC or whatever the case may 
be, but we really try to develop a proactive, comprehensive capital plan that we're taking 
forecasting what our needs are and trying to

51
00:30:02.480 --> 00:30:34.880
meet those needs each and every year. Also, we're 
seeking to build cost effective facilities for the long term, not just the short term. Of course, 
our goal is to ensure that our facilities meet the needs of not only the students but also the staff. 
And then developing a working plan where we're balancing the priorities of what we need with the 
available resources that we have. Our team also collaborates with the instructional departments 
and works to find solutions to improve the design

52
00:30:34.880 --> 00:31:09.920
of our new schools and then of course we're always 
seeking to provide safe and secure schools. In looking at figuring out what are the needs at each 
and every school. So of course we're looking at the overall school as a whole and with that we're 
have an eye to what and condition of each of the facilities are and keeping that in mind when was 
the last time they were renovated, et cetera. We are also reviewing each of the building 
systems at the schools, whether it be electrical,

53
00:31:09.920 --> 00:31:43.680
plumbing, HVAC, whatever the case, and as needed 
we come in and do individual site assessments for those systems. And then we always, again, are 
looking at what our existing capacity and -- are at each and every school and looking at where 
our future growth is going to be and trying to make sure we're ahead of that as well. And then 
we enlist professional consultants, of course, as needed. In looking at -- when we're looking 
at projects and what projects are going to be

54
00:31:43.680 --> 00:32:18.240
included on our capital plan, some of the criteria 
we take a look at, of course, projects that best going to serve the needs of our students. That's 
absolutely the biggest criteria. Of course we're including projects that we need to do to bring 
schools in line with ADA compliance and health and safety projects. Of course we're always looking to 
enhance our educational technology at our schools, especially our older schools. We want to 
provide -- we always strive to provide

55
00:32:18.240 --> 00:32:55.120
comparable facilities. Of course it's you know 
we're building brand-new schools so it's also trying to keep up our older schools with those 
whether it's technology or just the look and appearance of those schools. Of course we're 
ensuring that mandates are addressed in our capital plan and we use best design practices 
for the intended use of each and every school. And then as As far as priorities, putting 
together the capital plan, of course, we prioritize student learning and success, 
and as well as college and career readiness.

56
00:32:55.120 --> 00:33:29.280
So if there's a project that we need for 
CTE, of course, those kind of things are prioritized. We're also looking for projects that 
are going to reduce our maintenance and operating costs over the long term. We -- as I mentioned, 
we're looking at doing technology enhancements. another priority, and then again, what facility 
needs. Of course, if something's down or broken, of course, we're going to address that 
and make that a priority. And then, again, we're looking at what is our current enrollment 
and what our future enrollment is and prioritizing

57
00:33:30.560 --> 00:34:03.840
things that we need to 
mitigate over capacity schools. looking at the year that we just completed, 25-26, some significant milestones. The Kirkland Ranch 
KH gymnasium was just completed. The Pasco High School classroom wing and new brand new 
cafeteria was completed this past year. Of course, we completed the conversion 
of of Chasco K8 with combining Calusa,

58
00:34:03.840 --> 00:34:40.800
Chasco Elementary and Chasco Middle into Chasco 
K8. Built a brand new school at West Sever Hills Elementary and then also opened the brand new 
Skybrook K8. In looking ahead to this coming year, our major projects, continuing to work on Cypress 
Elementary's, the full school renovation there. That's nearing completion hopefully in the 
next few months that'll be finished. Also continuing to work on Gulf Middle School and 
the complete renovation kind of new facility

59
00:34:40.800 --> 00:35:14.400
out at Gulf Middle School. We just started 
the Kirkland Ranch K-8 wing and so that's under construction. Also Two Rivers K-8 is under 
construction now. The new high School triple-o is hopefully about to be under construction 
so that's coming soon as well. Also we have several athletics complex renovations in 
in process Hudson High School, Land O'Lakes High School as well as Pasco High School. 
You've probably seen Pasco High. It's it's

60
00:35:14.400 --> 00:35:48.560
well along in the process so excited to see 
that. And also school furniture refreshes which we're doing a much better job at now and 
so we're year by year we're tackling those and so you see those Centennial Middle, Pasco 
K8, Pasco High School, Paul R. Smith Middle, sorry Paul R. Smith K8, Pineview Middle 
School and San Antonio Elementary School. That's great. I always like to present our ADM 
projection maps for the coming So these are

61
00:35:49.600 --> 00:36:22.240
based on our projections for this coming 
year. And so these are actual numbers, but they're what we're projecting for the 
elementary, middle, and high school outlook for this coming year. So if you look at elementary 
schools, you certainly see a lot of green, which means green is under capacity. The darker 
the green, the more under capacity they are. And so as Janie referred to, declining enrollment. 
So that has an impact on this map as well as the

62
00:36:22.240 --> 00:36:55.040
facilities we've built the last 20 years in 
catching up with some of our overcapacity challenges around the county. So you see the 
west side, the central, mostly under capacity. Odessa Elementary is still a little bit over 
capacity. And then kind of on the east side where West the chapel on up into along the I-75 
corridor that's our greatest challenge right now with the growth that is happening still 
on that side of the county. And so with two

63
00:36:55.040 --> 00:37:34.720
rivers K-8 coming online in a couple of years 
that'll have a significant impact on helping with capacity in that region and West the 
chapel as well as the new wing at Kirkland Ranch K8 will also help this map with some of the 
slightly over capacity schools like Wiregrass, West of Chapel Elementary, 
San Antonio Elementary, etc. Looking at the middle school map again similar 
Westside Central in good shape as far as capacity

64
00:37:34.720 --> 00:38:09.680
under capacity Seven Springs is little bit just 
over capacity. Certainly Wesley Chapel again with the growth that continues to happen there. Weitman 
Middle and John Long Middle over capacity. We anticipate again the new Kirkland Ranch K-8 wing 
to help us with the capacity at Weitman Middle. Two rivers K-8 will be a zone school but we 
anticipate that be some choice available in that

65
00:38:09.680 --> 00:38:41.440
school so that may have some impact on Waiteman 
Middle and John Long as well. And then also Janie mentioned the new charter along County Line Road 
which is not too far from John Long Middle and Waiteman remains to be seen whether that 
has any impact or not. And then the high school map. Again you can kind of see the 
54-56 corridor is where the challenge is

66
00:38:41.440 --> 00:39:11.760
here with high school. Mitchell High still over 
capacity but again Mitchell's not in a growing area so that tends to remain consistently 
at around 110%. Sun like and line of likes a bit over but our biggest challenge is Westlake 
Chapel high and Wiregrass Ranch high significantly over. But again the new high school triple O is 
right smack dab in between those two schools.

67
00:39:11.760 --> 00:39:44.480
So we anticipate that new school which will 
come online in 2028 having significant impact on the capacity of those schools and 
reducing the overcrowded conditions at those two schools. That's a huge jump 
at Sunlink isn't it from last year? That's like when in decrease I mean yes, yeah, 
that's great. Yes So we do also of course have additional school sites planned for the future to 
help us with as Growth continues and wherever we

68
00:39:44.480 --> 00:40:16.800
feel like that's popping up. We we are blessed to 
have school sites in the bank for for the future Any questions on those maps or future. I'm just seeing what Dr. Lang has mentioned 
before about the high schools, you know, strong enrollment by our middle 
school and elementary, you know,

69
00:40:16.800 --> 00:40:50.960
revisiting ways to get students in. Well, and 
one of the concerns in this, you know, in this probably a discussion for another day is that you 
know we're seeing that it's birth rate and so that what my concern is here and it is that these 
numbers will just go up meaning up in grades so while we have lower kindergarten class that 
means the following years will be a lower K and first we don't know how how much that will 
continue to where where the new where the new norm is but we we are seeing and we'll see 
that when we do our 20-day count actually but

70
00:40:50.960 --> 00:41:25.120
we're the early numbers showing us that we're 
having smaller kindergarteners coming in. So numbers. You know and as I mentioned before 
it's causing us we're in a position now that we've not been in before because we've we've 
been very proactive and in building building building and now we still may need to build. 
Yeah. But we are trying to be very careful in looking at do we need to brand-new school 
maybe there's opportunity to build a wing and

71
00:41:25.120 --> 00:41:59.280
not build a huge new school. You know just 
being strategic in those kind of decisions. Yeah because we've got a lot of space in 
our central middle schools too. Correct. Yes. All right I'm gonna turn it over to 
Randy who's going to continue our capital plan presentation. Thank you. Thank you. Thank 
you. Good morning. Good morning, how are you? So today I'm going to talk about projected 
capital revenue and what impacts that.

72
00:42:01.360 --> 00:42:35.040
When we see an increase in tax rolls, that's 
going to increase the millage revenue. So we are looking at an increase of 5.3%, which will 
generate about $101.2 million in revenue this year. impact fee collections are projected to 
be 48.5 million. Those collections have been decreasing due to offsetting credits for 
our construction that we do and declining

73
00:42:35.040 --> 00:43:05.200
building permits. Penny for Pasco collections are 
projected to increase with collections. There's a very high collection rate on the penny per 
pass go. We're anticipating $51.9 million in revenue which is the highest level since 
the penny has been in place. For penny three, we just wanted to note that that 
collection started in January of 2025.

74
00:43:05.200 --> 00:43:42.920
>> Could I make a comment? >> Of course. up to the local millage saying that it's going 
to increase 5.3%. I want people to realize some of that is due to new home construction. So 
it's not that your people's homes, individual homes have gone up that much. It's the total 
collection of current homes plus the new homes that were constructed this year, which brings in 
more students. So I just wanted to point that out.

75
00:43:42.920 --> 00:44:24.800
>> Okay, so sources of funds 
for capital projects where we actually get the money from. A large 
portion of it comes from impact fees. Our millage, as we said, the challenge with the 
millage is the proportionate chair of the charter schools, which we'll get into on the next slide. 
This year though, some good news. We got a state appropriation restricted to Pasco High School 
athletics of $5.5 million. So that will help

76
00:44:24.800 --> 00:44:58.560
in the construction of Pasco and the updating of 
Pasco, one of the oldest schools in our district. impacts to our capital budget. Charter schools currently this year fiscal year 27 
will receive 80% of our PICO. Next year they are state mandated to receive 100% of that PICO. 
This year we have a new fund, COPS 2026A,

77
00:44:58.560 --> 00:45:37.200
which is refunding three previous COPS funds that 
we had as an effort to save some money there. Unfortunately, our capital costs are outpacing 
our revenues, but our current debt, which will be reduced this year as Janie and Tammy spoke 
to. We have no more computer leases so that'll be removed from capital. John will also speak 
to that. We have three bus leases that'll go

78
00:45:37.200 --> 00:46:19.720
through 2029 and then we'll be done with that. 
So there is a reduction there in expense. expansion of charter schools, more charter schools 
coming in, we're anticipating that to continue. And yeah, pretty much that. >> Can you 
help me understand what you said about PICO because it was my understanding 
we haven't gotten PICO in a long time. So I was just confused when you said you 
went from 80 percent, I believe 200 when.

79
00:46:19.720 --> 00:46:51.200
>> Oh, okay. That's why I was confused. >> Okay. 
>> We haven't had that for a year. >> I was like, I think she just swapped it. >> I'm sorry. >> 
Yes, capital out. >> Okay. >> My handwritten notes was wrong. >> Okay. >> Thank 
you. >> Thank you. >> And John, we'll come up and finish the last of the couple. 
>> Good morning. Good morning. Good morning.

80
00:46:51.200 --> 00:47:23.120
How y'all doing? Good morning. My name is 
John Rettman. I'm the accounting manager for budget and capital. I will be giving a 
brief overview of the capital budget summary. This slide here, it shows our revenue. 
The projected carryover is what we are rolling forward from last year. The projected 
revenue is what we're estimating to receive for this fiscal year. Right now we are 
estimating $225 million for this year.

81
00:47:24.800 --> 00:48:01.120
This slide shows our transfers for the 
fiscal year. Right now we are showing $91 million with majority of our transfers 
going towards debt service payments. Here we are showing our construction projects, 
our new school remodels and major renovations. Majority of the budgets in this section is going towards new schools and remodels as 
mentioned in the previous slides.

82
00:48:01.120 --> 00:48:38.960
This is our maintenance project. This is mostly 
replacements, equipment replacements, preventive maintenance. One of the projects that is included 
in this section is the according indoor projects. To date, 644 walls have been built, replacing 
the cording indoors for a more conducive learning environment. - That's great. - We anticipate 
this to be the final year of the construction. - That's great. - The next two slides shows other capital 
projects. Some of them are funded by

83
00:48:38.960 --> 00:49:15.840
Penny Three to include athletic renovations at 
Hudson High School and Landa Lakes High School. We also show a budget for buses which we 
are estimating to purchase 28 this year. >> Are they replacements for 
buses mostly or? Yes, okay. >> For this slide we show equipment and 
technology. Software is also included in

84
00:49:15.840 --> 00:49:54.480
this budget. One of the things that I want 
to highlight is our computer budget. That's a little over $9 million. This budget will be 
used for our one-to-one computer pilot program at Wendell Crean, Angeline Academy of Innovation, 
and Kirkland Ranch Academy of Innovation. This slide shows -- summarizes our total 
revenue and total appropriations broken out by the different funding sources that we have. And as Randy mentioned, we no 
longer have computer leases. We

85
00:49:54.480 --> 00:50:31.040
now have bus leases. And we have 
three years remaining for those. >> And not shown in this presentation, 
but it can be found in your booklets after page 40 of the summary of the 
10-year plan as well as our 10-year projected appropriations by cost 
center. Are there any questions? >> We probably have more questions after I have more time. >> Yes, thank you. >> I need a digest-- 
>> Yeah. >> Yes. - I think a lot of times you've

86
00:50:31.040 --> 00:51:01.360
given us a figure of, what the balanced capital 
is, but what our true need for capital is over what budget did. Did we do that this year or 
not? - I'm not sure what you're referring to. - Well, I guess on the 10 year 
plan, sometimes they've said, if we really did everything we needed to 
do, we would have a shortage of. But that's

87
00:51:01.360 --> 00:51:31.440
when we've gone into a more detailed 10-year plan 
budget. So we might not have that figure. - Yeah, we have some of those things still in 
the out years. Like you said, in Penny, if we did everything in there, that it 
does not become balanced in the out years. So we do have to reprioritize each year what 
we're approving and putting in the five-year plan. And like to say, it's always shifting 
priorities, what comes up. The one great example is the walls when we prioritize that, we 
may have to move something else off. And again,

88
00:51:31.440 --> 00:52:03.440
it depends on the funding source too of what's 
allowed in those funding sources. So we do have some leftover roll forward buddy and petty, 
but there are some restricted uses in there. Millage seems to always, because it can be, 
it's the most flexible source of funding. So usually it's spent down to the most. 
And then we have some very restricted sources like impact fees and other things. 
But I know if we go with the out years, you're correct. And we could give you that 
amount of just unfunded needs of the out

89
00:52:03.440 --> 00:52:35.760
years we have. We call it the holding block out 
there with way out in the 10 to 15 years of a holding block where we place those projects 
that can't be funded in the current plan. - Yeah, I guess my point was not 
the exact figure but that we do have more capital needs than we have 
furniture. - Yeah, we have furniture. >> Any other questions? >> I had a question about 
the buses and so I don't know if this is for you or potentially Dr. Armando or someone else in 
transportation. So for purchasing 28 buses,

90
00:52:35.760 --> 00:53:07.600
the goal is to then move away from leasing 
completely, right? So we're going to finish out our leasing and purchase 28. >> We've 
already moved away from -- it's just the remaining payments on those buses. The 
buses were longer terms on the computer, so we just have the remaining payments 
just like if you had your car payment we still have to keep paying on those but we have 
already moved away I believe three years ago. We've moved away from leasing anymore 
so everything is a new purchase now. But like I say it is a replacement schedule. 
We're not expanding the fleet. >> Just wanted

91
00:53:07.600 --> 00:53:41.578
to make sure I was understanding how 
both of those numbers correlate. Thank you. >> You're welcome. >> Anything else? 
>> No. >> The moment. >> No. >> All right. Thank you for your time. And again, we hope to 
have the tentative budget book hosted by the end of the day today so you can review that. 
If there's any questions when you see that, the ads will go out Thursday or Friday on the 
website. We'll add that footnote in that you requested. And if there's anything else, 
please feel free to reach out. Thank you. Thank you. Thank you. Okay, that concludes 
the workshop. We have about nine minutes.

Part: 2

1
00:00:00.000 --> 00:00:32.720
silence all electronic devices. The agenda 
for the school board meeting is published and available at least one week prior to the 
board meeting. Any member of the public who wishes to speak on an agenda item requiring 
board action will have an opportunity to do so prior to final action being taken. Please fill 
out a green speaking request card available in the lobby. During the appropriate public comment 
portion of the meeting names will be called in the order in which they were received. Any member of 
the public wishing to speak to a non-agenda matter

2
00:00:32.720 --> 00:01:06.800
of relevance to the school district will have an 
opportunity to speak at the end of the meeting. Please fill out a pink speaking request card 
available in the lobby. Names will be called in the order in which they were received. Please 
note that for speakers to address the board on either agenda items or non-agenda matters, their 
speaker request form must be submitted prior to the commencement of public comment on agenda 
items. We welcome members of the public to attend our meetings and we respect the public's right to 
speak to the board. We appreciate your interest

3
00:01:06.800 --> 00:01:42.280
in Pasco County Schools. Our vision statement 
is all our students achieve success in college, career, and life and the thought for the day 
is from Mr. Hernandez. Thank you Madam Chair. Education is one of the greatest investments a 
community can make in its future. As we gather today, let us remember that every vote we take, 
every conversation we have, has the potential to shape a child's future. May we live with wisdom, 
listen with respect, and remain steadfast in our commitment to providing exceptional educational 
opportunities and a brighter future for every

4
00:01:42.280 --> 00:02:44.280
student we serve. Thank You Mr. Hernandez. 
Please stand for the Pledge of Allegiance. I pledge allegiance to the flag of the 
United States of America and to the republic for which it stands, one nation, under God, 
indivisible, with liberty and justice for all. Please let the record reflect that 
all board members are present. At this time, I'd like to ask for a 
moment of silence for personal reflection. Thank you. The draft minutes of the June 
16, 2026 board meeting were provided to

5
00:02:44.280 --> 00:03:18.360
board members in advance of this meeting for 
their review and consideration. May I have a motion to approve the regular meeting minutes for 
June 16th as written. So moved approval. Second. It's motion by Mrs. Armstrong, second by Mrs. 
Harding. Any discussion? I almost said they're on. Okay all in favor? Aye. Opposed? Motion carries. 
It's Superintendent, do you have any agenda items?

6
00:03:18.960 --> 00:03:49.160
Okay, thank you. That brings us to public comment 
on agenda items only. I do not see any green cards. - No green cards, so there'll be 
no public comment on agenda items. I will say that any let's talk comments that we may 
have received through the online platform will be made a part of the record. - Thank you. That 
brings us to United School of Employees at Pasco. I see Mr. Larson is here. Good morning. Good 
morning. There are a couple of agenda items

7
00:03:49.760 --> 00:04:20.840
that I wanted to comment on this morning. Item 
13.3 is the advertisement of the 26-27 proposed tentative budget. And of course we just had the 
budget review during the workshop. USEP is aware that this year, just like every year, the budget 
is going to be extremely tight. We also know that it is imperative to prioritize properly 
compensating employees for the wonderful work

8
00:04:20.840 --> 00:04:56.320
that they have been doing with our children that 
has resulted in our district being in a district. We look forward to continuing the collective 
bargaining process to find positive outcomes for all employees, many of whom are 
working multiple jobs to make ends meet. I'd also like to address agenda item 13.9, which 
is the RFP for management services for our group health insurance. While we recognize that 
this agenda item by itself does not actually

9
00:04:56.320 --> 00:05:28.600
represent any specific benefit plan changes, we 
do believe that this is a positive step forward. And we look forward to working collaboratively 
with district staff on potential improvements to the health insurance plan design and benefit 
options through the insurance committee. Thank you for your time. - Thank you, Mr. Larson. 
This brings us to board member committee reports. Mrs. Wright, did you have any committees? - Yes, 
I did, thank you. So I attended the, my apologies,

10
00:05:28.600 --> 00:06:03.920
I attended the FSBA leadership services 
committee. I'm sorry, I'm struggling with the microphone today. I attended the FSBA Leadership 
Services Committee that was on July 15th at 9 a.m. Joe McGee, the FSBA Director of Advocacy and 
Legislative Services, and Tina Pinkenson, the Director of Leadership Services, provided an 
update on recently enacted education legislation. This is one of the sessions, though, too, that 
you can also go view on the FSBA website, and it is eligible for certified board member training. 
if you want to go back and view it. It was a lot

11
00:06:03.920 --> 00:06:37.760
of heavy topics. I really kind of just picked 
the two main ones that had the most discussion. And Mrs. Armstrong, I know you're very passionate 
about this so I'll pause for any questions too. So one of the big topics of conversation was student 
athletics because of the two primary legislation changes that came along with that, one of which 
being the Teddy Bridgewater Act. And so I know some of these things we've been following since 
we were in Tallahassee, But what ended up passing, really the new law directs the Florida High 
School Athletic Association to adopt bylaws

12
00:06:37.760 --> 00:07:08.640
allowing head coaches to use up to $15,000 
of their own personal funds each year to support student athlete welfare. However, all 
of that will be subject to reporting requirements and safeguards against recruiting. The reason why 
this came about, it was inspired by a former NFL quarterback in Miami high school football 
coach, who was suspended after using his own money to provide meals, transportation, and 
recovery services for student athletes in need.

13
00:07:09.480 --> 00:07:39.480
So this piece, which would be FHSAA bylaws, is 
then also accompanied by the Senate Bill 538, which then allows school boards to adopt local 
policies as it relates to booster clubs and other organizations to provide funding for athletic 
coaches, extracurricular sponsors, however, we would need extensive guardrails for 
that. And so the big topic of conversation

14
00:07:39.480 --> 00:08:13.400
is that while some of this legislation can expand 
opportunities, we also have to be very careful that we don't create any sort of inequities 
across the district and that we also remain in compliance with federal law, particularly 
Title IX. So I just wanna pause because that was There's a very meaty conversation, so if 
there's any questions about any of that. I know that it came up in part of conversation 
just in a booster club meeting last night. And where I was very clear, like, let's just take 
a pause. We all have some things we have to work

15
00:08:13.400 --> 00:08:48.000
through and understand before we can truly 
actually move forward on that legislation. The other topic of conversation within that 
committee meeting that was largely focused on was the School Board Member Bill of Rights. And a lot 
of that language was about timely access to public records that board members are entitled to view. 
And then many school board members actually shared that they're not voting on job descriptions or 
salary ranges. And it seems that that issue right there is probably why some of the discussions 
that they're having or maybe tension that they're

16
00:08:48.000 --> 00:09:20.560
having regarding appointments could be solved 
just by fulfilling that statutory requirement. It also provided a definition specifically 
for appointments and that good cause was narrowed to individual materially fabricated 
or exaggerated their credentials or background, does not meet the minimum qualifications for the 
position or their licensing was revoked by another state. So we also discussed that the minimum 
qualifications could extend beyond education and

17
00:09:20.560 --> 00:09:54.400
experience should there be a statutory eligibility 
requirement for employment that would disqualify them. So there's a lot of discussion around those 
things, what that really means, and that it was very narrow to appointment that's outlined 
in chapter 1012. And then the last part is that the legislation prohibits any school district 
from requiring or incentivizing employees to sign non-disclosure or confidentiality agreements that 
would violate statute. So with that being said,

18
00:09:54.400 --> 00:10:28.160
all stakeholders are still expected to abide by 
FERPA, HIPAA and all of our public records laws. So again, very meaty committee meeting. And if 
you want to view it yourself, it will be available later on the FSPA website. So that's it for me for 
committees. And then advocacy will meet September 17th. - Thank you. Mrs. Harding. - I had none. 
- I had none. - I have none. I had none either. Mine don't usually meet over the summer. Is it 
so? Dr. Legg? - Thank you, Madam Chair. I wanted

19
00:10:28.160 --> 00:11:00.320
to just kind of give an update. We're kind of at 
that unique point in the school year where we're closer to the start of the school year than we 
are from the end of the last year's school year. So I wanted to take just a moment to set the stage 
of kind of where we are and where we're going. Last year here in Pasco, we had a historic 
year. Last year for the first time since 2009, we became an A-rated district. And I think 
that's something to celebrate. And for the first time since 2004 officially, we have no D or 
F schools anywhere in Pasco County. And that is

20
00:11:00.920 --> 00:11:35.160
something to be very proud of. But I also wanted 
to kind of give you a deeper look at the numbers, like where do we rank in the school? Did the boat, 
did everybody rise? And did we just kind of stay the same? Last year we were ranked 39th in the 
state and we've rose to 25th in the state in terms of overall student achievement. So while the state 
is slowly getting better, we are improving faster than those around us. This accomplishments, 
these accomplishments are worth celebrating. But I wanna make a note that they're 
behind us now. Like we have to move on.

21
00:11:35.160 --> 00:12:07.040
Those things or celebrations are yesterday. 
And yesterday is over and today is here and a new school year is about to begin. And that is 
what we're focusing on. We can't be satisfied with where we are because we have so much 
yet to do. We have so much yet to accomplish. I wanted to set something aware, to put it on 
your radar. And looking at the statewide numbers, only 11 school districts throughout the state 
of Florida had a 70% on the grading scale

22
00:12:08.480 --> 00:12:45.920
in Florida. We want to be a top 10 district. So 
what does that mean that we have to get to 70%? This is not just an aspirational goal. This 
is what our students deserve. This is what our community deserves. This is what our community 
expects. They expect our students to be focused on academics. We know that we have a challenge before 
us. But what I want to be clear and just kind of take a breath and look at-- many folks are not 
realizing-- they look at the statute. The state statutes require the school grading scale increase 
and it will increase by five percentage points

23
00:12:45.920 --> 00:13:20.400
which means 70% becomes the new benchmark for an 
A. So that is that is our minimal new goal minimal new goal going in. This last year we increased 
our statewide score by five percentage points. We can do it again. We will do it again. 
Our kids deserve it. Our kids deserve that and and that's a daunting task to think about 
but but the task is before us because our kids deserve a high quality education. Success will 
require us to be to have intentional focus

24
00:13:20.960 --> 00:13:57.320
and intentionality has really been my word with 
with our principals. Our work with Will Center on two key concepts and they were our two key 
concepts for the last 18 months I'll be going in going in going into the new year and that is 
student achievement and removing distractions. And you'll see that in some of our presentations 
today that that is a priority removing distractions to allow our teachers to teach. One 
lesson that became abundantly clear last year for me is that parent engagement is essential. 
It is essential. The overwhelming majority of

25
00:13:57.320 --> 00:14:31.440
our families are engaged and supportive of 
academic excellence. They're in our schools, they're volunteering, they're helping our 
teachers, they're working with our principals, they're working at our schools, they're 
creating partnerships supporting our schools. But it can't be optional. It has to be all of 
our parents. All of our parents have to engage and support our students. We are there to educate 
our students. We are not there to parent our students. That is the parents job. Why do I say 
this? Because we will keep our focus and we will

26
00:14:31.440 --> 00:15:01.440
keep supporting our truancy court and we won't 
force it. We brought it on mid-year last year, we are starting this year already focused on it, 
communicating that attendance is not an option. Attendance is a requirement. We will enforce 
attendance requirements because our students deserve, our taxpayers are paying for an education 
and they deserve to be in school. We will continue to expect that our students come ready to learn. 
We'll continue to allow our principals to do

27
00:15:01.440 --> 00:15:32.160
graded homework if they feel it's deserved in 
their classrooms and have structures to do that, to engage parents at their home that education 
is important. And without being just so direct, it's not our job for our teachers to change 
diapers and to for our students need to become school potty trained, ready to have academics. It 
is not our job of our teachers to be that parent, but it's to be that educator. We will also 
have focus like we had on behaviors. We will

28
00:15:32.160 --> 00:16:02.760
not allow one student's disruption to disrupt the 
other students in the classroom. That is just not acceptable. Too much is at stake for all the other 
students. Their future is at risk. We cannot allow disruptions in the classroom. And we will continue 
to support our teachers. We will continue to support and assist those students in the proper 
setting that they need to be in if disruption is occurring. Why do I say that? is because that 
is the expectation of our community. We have shown

29
00:16:02.760 --> 00:16:37.800
and demonstrated this year with intentional focus, 
academic excellence can be achieved. It can be achieved. We have achieved it. We must hold onto 
it, we must expand it, and we must rise even more. I'm excited because I see great things happening 
in our schools. I see great opportunities. And in sports, momentum is contagious. When you start 
winning, you win more. We had a good year last year, but we're going to have even a better year 
this year. So as you see some of the proposals

30
00:16:37.800 --> 00:17:09.000
and discussions that we're having, I just want 
to remind the board of the vision that we have, student achievement and removing distractions. 
And we're going to keep moving that forward. I just want to thank this board for their support, 
because without this board, we would not have risen to 25th in the state. We would not have 
been in a district. We would not have been able to remove all the DNF schools. Now is the 
time to work together to stay focused on what is important. And that is our students and that is 
removing distractions in our schools. With that,

31
00:17:09.000 --> 00:17:39.680
thank you, Madam Chair. - Thank you, Dr. Legg. 
Mr. Shibley. - I don't have anything to add other than the addendum in item 11.1. - Thank you. 
Ms. Taylor. - I just wanted to point out also item 13.3 includes the budget amounts for the 
tentative hearing advertisements as discussed in the workshop earlier today. The public notice 
and budget ad will be posted on the district's website, which will be available according to the 
Department of Revenue Trim Compliance by Friday,

32
00:17:39.680 --> 00:18:12.360
July 24th. The school board is only approving the 
budget ads this evening. The public hearing to set the millage rates and adopt the tentative 
budget will be held next Tuesday, July 28th. The actual proposed millage rate has been rolled 
back by the state and is a decrease from the prior year of.090 mills down to 6.184 from 6.274 
mills. This includes the voted additional millage and the basic discretionary operating millage 
is set by the legislator and must be levied in

33
00:18:12.360 --> 00:18:43.400
order to receive $619 million in state funding. 
And finally, the budget includes $87.6 million appropriated to family empowerment scholarships 
and $107 million for charter schools. - Thank you. Dr. Legg, I had a couple of questions on that. 
I was gonna pull the item to ask them, would you prefer I just ask now? - Yes, if you want, is it 
for the CFO? - Yeah. - Yeah, absolutely. Please go ahead. - Okay. 'Cause then I won't need to pull 
the item. Ms. Taylor, you touched on some of this,

34
00:18:43.400 --> 00:19:18.160
But could you also explain, well, that this is 
a tentative millage, so it could still change, right? And Dr. Lee. - At this point after 
it's advertised, it would have to be re-advertised. So that's why we're approving the 
advertisements now. - Right, yes. - Okay. - Yeah, we're just voting on the advertisement. - Yeah, 
I just wanted to clarify this for the public. And then my other question, if you want me 
to, is if you could explain, and I know I ask this every year, the rollback because it's 
very confusing to people. So if you could

35
00:19:18.160 --> 00:19:50.640
please explain a little bit about that 
decrease. >> Yeah, so the rollback rate is 6.149 and is a millage rate that would generate 
the same amount of property tax from the existing property tax rolls which was generated last 
year. So because we are generating more, we have to advertise as an increase. >> We've 
actually had 6.184 which is a.57% increase over the prior year. >> That's an increase in 
the total but for the individual-- we're still

36
00:19:50.640 --> 00:20:23.320
rolling back. We're not capitalizing on the-- 
>> No. >> Yeah. >> But if you use the same exact millage rate that we-- so they calculate what that 
millage rate would have equated to if they-- so they would have rolled it back to 6.149 And if the 
amount we're adopting, which is 6.184, is more, we have to advertise as an increase, which is a 0.57% 
increase. - Thank you. - Thank you. - Did anybody else have anything? - No, thank you for asking 
that. - Okay. Deputy Superintendent Ms. Coon. -

37
00:20:25.800 --> 00:20:58.080
Good morning. I just wanted to point out that we 
do have Jordan Wise from Ajax Building Company here for 12.3 on consent agenda. That's the 
guaranteed maximum for high school triple O. It's not the full, we'll be back later for that. 
But just wanted to recognize them for being here. And then I'd also like to turn over to Dr. 
Romano to give an operations update. - Nice, thank you. - Thank you. - Madam Chair, before 
Dr. Romano jumps in, we wanted to have Dr. Romano to come 'cause a lot of, there's a misconception 
that by a very few people out there, that summer

38
00:20:58.080 --> 00:21:35.000
is slow in the school district. - That's in 
my board report. Dr. Romano will here to show that there and I know the board is aware of this 
but kind of some of the things that are happening during the summer that many people think oh it's 
a summer summertime is slow at the school district office and She'll kind of show you some of the 
things that are happening behind the scenes. Thank you. Good morning. Good morning Good morning board 
chair school board members superintendent leg and Attorney meeker superintendent staff and of course 
the community this morning. I'd like to provide a brief operations update Highlighting the work 
taking place across our operations departments

39
00:21:35.000 --> 00:22:10.080
to ensure students have safe schools reliable 
transportation Nutritious meals and facilities that support high quality learning. I'm gonna 
begin with maintenance and facilities Each summer our maintenance and facilities team works against 
the clock as you know to prepare our schools for the first day of classes While students are 
enjoying their break, hundreds of projects are underway behind the scenes to ensure our campuses 
are safe, comfortable, and ready for learning. One of our signature initiatives that you've heard 
today already continues to be the installation of

40
00:22:10.080 --> 00:22:48.120
permanent pod walls, replacing aging accordion 
partitions with permanent classroom walls to improve safety, reduce noise, and create 
better instructional environments. In 2025, 112 pod walls were completed with 389 additional 
walls scheduled to be completed in 2026. And our final year we have 352 planned 
in 2027 representing a district wide investment of 1,153 permanent classroom walls. 
In your folder, it's purple, you have a flyer

41
00:22:48.120 --> 00:23:21.840
that shows you the status, a status report for our 
pod wall so you can see what has been completed. Thank you. What they're still working on in our 
in our final year and 2027 what that looks like. Beyond our pod walls our team is completing 
dozens of additional summer improvement projects across the district including HVAC and chiller 
replacements and control system upgrades to improve indoor comfort and reliability. That 
included 13 new boiler systems this summer.

42
00:23:22.560 --> 00:23:54.800
Plumbing improvements including water main valves, 
kitchen grease tanks, floor drains and floor sinks, flooring replacements and cafeterias, 
kitchens and serving lines, mechanical system repairs including our air handlers, 13 boiler 
system replacements and different piping systems, campus paving and infrastructure improvements 
which you've probably seen as you've been out in the community in our different school sites. 
These projects might not always be visible to our students and families right they go on behind 
the scenes but they're essential to providing

43
00:23:54.800 --> 00:24:30.560
safe reliable and well-maintained learning 
environments for every school in Pasco County. I just want to say thank you to our maintenance 
and facilities employees for their tremendous amount of work this summer and they accomplish 
things every single summer but this summer has been just an order a lot of different projects 
it's been a significant an extra ordinary so want to reach out and say thank you to them publicly. 
Their dedication ensures when students return next month, I can't believe it, they walk into schools 
that are ready to support teaching and learning

44
00:24:30.560 --> 00:25:03.280
from day one. So thank you to them. Next I'll talk 
a little bit about food and nutrition services. So our food and nutrition services team continues 
to make remarkable impact every day. During the last school year they serve more than 23,500 
breakfast and 41,400 lunches every single day, supported by over 680 dedicated employees. It's 
pretty incredible, right? Who ensure that students receive nutritious meals that fuel learning. That 
commitment continues throughout the summer. I

45
00:25:03.280 --> 00:25:38.120
know many of us have been to our summer feeding 
sites. This year, our summer feeding program is operating 41 feeding sites across Pasco County. To 
date, the team has served over 48,000 breakfasts and 62,000 lunches providing more than 111,000 
meals to children. Meals are available through partnerships with our libraries, YMCA, locations, 
daycare centers, parks and recreation facilities, aquatic centers, mobiles, bus stop locations, and 
if you haven't been to one of those, pretty neat,

46
00:25:38.120 --> 00:26:13.520
and curbside meal distribution in our rural 
communities, ensuring students continue to have access to healthy meals even when school is not in 
session. And in your folder, you have a flyer on, we call it the FNS Fun Facts. So you'll be able 
to see that and have data right at your hands. Our planning department continues to 
monitor enrollment trends as you heard earlier today and strategically aligns 
facilities with future student growth. The greatest enrollment growth remains of 
course in the eastern portion of Pasco County, particularly in the Southeast. To meet this 
demand, as you know, construction continues on

47
00:26:13.520 --> 00:26:45.440
the Two Rivers K8 and our new high school triple 
O, both scheduled to open in August of 2028. In addition, a new classroom wing at Kirkland 
Ranch K8 will open in August of 2027, providing additional capacity in one of our fastest growing 
areas. At the same time, we continue to evaluate opportunities to improve efficiency in areas 
experiencing stable or declining enrollment, including the successful transition this year 
to Paul R. Smith K8. Next on the transportation.

48
00:26:46.680 --> 00:27:18.680
Transportation continues to make progress as we 
prepare for the start of the 26-27 school year. Last year, through the use of GPS data, route 
analysis and continuous reviews of all of our operational data and transportation, we improved 
on-time performance across all grade levels. High school on-time arrivals increased from 73% 
to 92%. Middle school improved from 72 to 95. and elementary schools improve from 81 to 
86. We also increase the routing efficiency

49
00:27:18.680 --> 00:28:00.600
by reducing the number of daily routes from 297 
to 294 during the school year. As we prepare for the first day of school this year, I'm pleased 
to report that we've made even more progress. Today, we are scheduled to begin the school 
year operating with 293 routes. So last year we had 294, this year we'll have 293, Reflecting 
continued improvements in route efficiency and staffing even more importantly. We are beginning 
the year with only 17 route driver vacancies This

50
00:28:00.600 --> 00:28:33.600
is supported by 24 relief drivers and 12 driver 
trainees currently in our July training class In addition more than 20 applicants are already in 
the pipeline for our August training class Giving us a little confidence that staffing will continue 
to improve this school year Thank you Just to give a comparison. Can you get the do you know the 
exact number where we were about this time last year? So last year we began the school year with 
62 vacancies in our bus drivers. Yeah, see I said

51
00:28:33.600 --> 00:29:07.920
63 I was wow - Big deal, big difference. - Big, 
big huge deal. We've stayed intentional and on it and amazing staff, amazing collaboration. So 
I just wanna say thank you. Huge shout out to our transportation team, but also our human resource 
department partners, Mary Falk and her team. They have an amazing partnership and they've just 
stayed really intentional around that. So I will keep you updated on things as we progress forward 
into August so we can stay intentional and on

52
00:29:07.920 --> 00:29:42.720
track with it and don't take our eyes off of it, 
right? Next I'll move on to construction services. We continue to deliver projects that will 
benefit students for decades to come. In your flyer you have a construction services project 
flyer. You've seen it before. I just wanted to reiterate so you could have it all in one place 
and see the different projects that are occurring. Current work, they're very, very busy, includes 
major school replacement, classroom additions, athletic facility improvements, which you 
heard about earlier, and the construction of future schools that will support our growing 
community. And lastly, I wanted to mention our

53
00:29:42.720 --> 00:30:18.200
furniture refresh program. It continues to 
modernize learning environments across the district by replacing aging classroom furniture in 
schools throughout Pasco County. You also have a furniture refresh flyer that's in your folder so 
you can see what schools are being addressed. And at this time, I'd like to share a brief one minute 
video thanks to our communications department Andy done in my mark heart Mike Carlson who helped 
put this video together just highlighting the outstanding work of our operations department 
this departments this summer thank you [MUSIC]

54
00:31:22.760 --> 00:32:21.800
(upbeat music) (up [Music] So in closing, I hope you enjoyed the update 
and the video. Operations really is about creating the conditions for student success. 
Oftentimes, they operate behind the scenes, but their work does not go unnoticed. So whether 
it's maintaining safe schools, serving healthy meals, transporting students safely, planning for 
future growth, or building exceptional learning

55
00:32:21.800 --> 00:32:59.520
environments, every member of our operation 
teams plays a really important role in learning, in building those learning environments. So I just 
wanna say thank you to our dedicated employees for their commitment to the excellence and the 
service that they provide. And thank you for the opportunity to provide this update. - Thank you. - 
Thank you. - Thank you. - Thank you. - That was a great update, thank you. - Again, we're not quiet 
in the summer, very busy. Deputy Superintendent Dr. or Mrs. Cohen did you have anything else? 
I'm sorry. Okay Dr. Ayl. Yes I did just want to give a brief overview of our IB and Advanced 
Placement exams. We did receive those results from

56
00:32:59.520 --> 00:33:35.800
this past 25- 26 school year. Overall for the IB 
program for exams there we saw an increase of 14% of exams taken by students. The pass rate was 
78%. It was a decline from 84% the previous year. Ultimately, we had 58 students who received the 
IB diploma. They earned over 2100 college credits, which was a savings to families of a half million 
dollars. I also want to highlight Land O'Lakes

57
00:33:35.800 --> 00:34:10.920
High School. They had a 100% pass rate in 
their standards level anthropology course. That's awesome. And then for advanced placement, 
as you know, we are continually requesting high schools looking at students, 
putting them in more rigorous courses. The total number of exams taken last year 
increased 9% from 14,000 to over 15,000 exams. The total number of individual students taking 
the exams increased by 5%, and then the percent of

58
00:34:10.920 --> 00:34:48.120
scores that received a three-year higher increased 
by 4%, going from 65% to 69%. Ultimately, overall, over 32,000 college credits were earned, which 
was a savings of 7.8 million to families. Additionally, with the capstone diploma piece, 
overall, with all of the different levels, we did see an increase. The total scholar designation 
increased 17.3% from 2300 students to 2700. We do

59
00:34:48.120 --> 00:35:23.600
believe, as Florida Bright Futures is awarded for 
the AP scholars designation, we will continue to see an increase in that area. So I just wanted 
to provide a broad overview of that. >> Thank you. >> And we will have Cambridge results coming 
out on August 11th. >> That's great. >> Just one clarification on the AP exams taken. The handout 
says 9% increase, I think. >> That was for participation. >> Right, okay. I was thinking you 
said something about 5%. >> Yeah, the actual that

60
00:35:23.600 --> 00:36:12.200
passed, the exam was increase of 5%. Oh and 
okay because we have 4% so it's 5%. Okay. Thank you Dr. Iles. I was just looking it 
over to see if I had any more questions. Okay so we have no expulsion recommendations 
which brings us to the consent agenda. Does any board member have any item they wish to remove. I just want to make a comment on 13.9 if you're 
mine. We can pull that then. That would be great. So and I already asked my questions about 
13.3 so if I could get a motion to approve

61
00:36:12.200 --> 00:36:45.840
the consent agenda and all consent agenda items 
including addenda or revisions as recommended by the superintendent with the exception of item 
13.9. Motion by Mr. Hernandez, second by Mrs. Harding, all in favor? Aye. Opposed? Okay motion 
carries. That brings us to item 15. Make sure I have my pages. He has to make his comments on 
13. Yeah, well that's what item 15 is. Sorry.

62
00:36:46.440 --> 00:37:18.120
Item 15 is me going back to item 13.9. I think 
you guys have done that too far. Thank you. So, Mr. Hernandez. Yeah, and again, thank 
you Madam Chair. And this is just a comment. I wrote something down and I just want to make 
sure that I can share with my colleagues here. And also to, you know, it's not easy to perform, 
especially after so many years, a group health insurance change, right? Especially a carrier. So 
I would like to express my sincere gratitude to everyone who participated in this election process 
of our new self-funded health insurance program.

63
00:37:18.720 --> 00:37:52.200
This is never an easy decision for those that have 
served through this process. You know that this process requires countless hours of analytics 
or analysis, thoughtful discussion, careful evaluation, and a commitment to asking difficult 
questions. While decisions of this magnitude can never come 100% certainty, and we know that 
right at the end this is health insurance, they can be made with confidence when 
they are grounded in diligence, integrity, and in the best interest on those we serve. 
I'm truly grateful for the consultant that we

64
00:37:52.200 --> 00:38:25.000
selected through this process, the professionalism 
of the team, the expertise, and the collaboration demonstrated throughout this process. Every member 
of the selection committee invested their time and knowledge to ensure that the best informed 
decisions were made. level of commitment, recognition and appreciation. On behalf of the 
board, personally myself, I want to personally thank each and everyone for the dedication, the 
willingness to engage in respectful dialogue and your unwavering focus on finding the best path 
forward. I feel confident that because of the work

65
00:38:25.000 --> 00:38:59.720
and the care that each brought to this effort, 
we have positioned ourselves well for the future. And I just want to say thank you to Kevin and the 
rest of the team great job on that end like I said it's not easy but I do think that this election 
process was very well made the process was tight and quite honestly I do think that ultimately 
the process bear what we kind of knew through the process that we needed something different 
we needed to engage probably a carrier that can engage in the community and I do believe that 
the carrier was ultimately selected not only

66
00:39:00.360 --> 00:39:36.320
it's engaged through the process but it also 
is going to engage in the community which is something we haven't seen in the past. So I 
just want to say thank you. Hopefully too it will help relieve some of the burdens that we've 
been, that has helped the staff. Yep. And thank you Mr. Hernandez for your knowledge and your 
help with that as well because I know thank you. Months and months maybe a couple years ago you 
brought up we need to look at this again so thank you. I also was gonna thank you for your 
leadership in this area. Do you want to make a motion? A motion-- I'm sorry. I just made a motion 
to approve it. Second. All in favor? Aye. Opposed?

67
00:39:36.320 --> 00:40:09.880
Motion carries. So item 13.9 is approved. That 
brings us to miscellaneous action items. So I need a motion to approve the student progression 
plan for 2026, 2027. So moved, approval. Second. Motion to approve by Mrs. Armstrong. 
Second by Mrs. Wright. Any discussion? No, we haven't had a lot of discussion. OK, so 
all in favor? Aye. Opposed? Motion carries. This brings us to individual board member reports. 
If you don't mind, Mrs. Wright, I'll start at that

68
00:40:09.880 --> 00:40:44.480
end again. Yes, thank you. Hopefully, I won't 
struggle with my microphone as much this time. I appreciate everybody's comments in terms of 
how summer is not quiet. And I really want to take a few moments to shout out some of our staff 
that's been hard at work. Specifically our admin staff at our school sites and our 245 employees, 
they've been very busy preparing for the new year. And I know that it takes a lot of time from our 
teams to get our schools ready for students and for families. Specifically when we were 
talking about maintenance, I was at a school yesterday and we had to put chairs down on 
the floor. And as I'm looking around, I'm like,

69
00:40:44.480 --> 00:41:17.120
this floor could be a mirror. It was so shiny. And 
I was like very peculiar about moving that chair, to cause streaks in their new wax. So I appreciate 
our maintenance team. Major shout out to our director of FNS, Stephanie Spiknall and her entire 
team for working with our school site teams to get information out about CEP and the free and reduced 
lunch applications nice and early so that we're prepared for the new school year. And also working 
with our FNS teams throughout the summer to make sure our students that are in need are still 
fed. I know that that's a huge lift and they do a

70
00:41:17.120 --> 00:41:50.000
really great job making it very efficient. I also 
wanna give a shout out to Mary Falk and her team as well for the updated info about Teach Pasco 
Paid Pathway. This is a really great opportunity for our non-instructional employees who wanna earn 
their bachelor's degree in education and become teachers. You do have a pathway for this where we 
will work with you providing tuition assistance and the ability to continue receiving your 
regular pay while completing internship hours. I love that we do this because we're investing and 
our own employees who are already invested in us

71
00:41:50.000 --> 00:42:20.120
and it helps us really grow our own. I also wanted 
to give a shout out to our communications and marketing department and I haven't said anything 
to them about this beforehand. So back in June, they did a session with some students at 
the YMCA for marketing and storytelling. And they might not know this, but the YMCA was 
like a second home to me growing up and we were there on scholarship, played a lot of sports, 
I volunteered there, I worked in the kids' room,

72
00:42:20.120 --> 00:42:54.560
and it really has a special place in my heart. 
But I got a text message from the YMCA staff, and they just gave major kudos to how our 
staff interacted with the students, and they specifically wanted to know if Mr. Testoni always 
walks around like the president is about to walk in the room. And he does, he does always walk 
around like that. And I also wanted to thank them for their continued partnership with Johns Hopkins 
and John Hopkins generosity. Their community outreach team recently contacted me for support 
for their October fund run in Wesley Chapel.

73
00:42:54.560 --> 00:43:29.640
And I've looped in Dr. Zeci for that so we can 
continue to partner with them in meaningful ways. I also had the opportunity to provide 
a legislative update at the Florida PTA convention out in Orlando. And I got to spend time 
with our parent leaders from across the state. And it was especially great to see some faces from 
our Pasco County Council PTA. And we also have someone new on the statewide board of directors as 
well. And so as we really recognize our staff who works hard over the summer, our parent volunteers 
actually also work over the summer. They do a lot

74
00:43:29.640 --> 00:44:05.200
to prepare our schools for back to school and 
teacher appreciation events right in that first week of planning. And in that same vein, don't 
forget to renew your volunteer application. I also wanted to recognize the Pasco Education 
Foundation's back to school supply drive for Y supplies. My kiddos and I, we were able to 
drop off some supplies that we gathered from our neighbors and we dropped it off at one 
of those Walmart locations. And so you can also drop off supplies at any other time as well 
that can be added to the Y supply center. So just

75
00:44:05.200 --> 00:44:41.240
huge thanks to the Pasco Education 
Foundation for that. And then this part I'm gonna show my true West Pasco 
colors. I saw an opportunity for families for Monster Jam. This also goes along with 
the Pasco Education Foundation for every ticket that you purchase. Two dollars will 
go back to the Pasco Education Foundation. So Monster Jam is a staple in our household, so you 
know, check it out. And lastly, major thanks to Mrs. Harding on her Public Servant of the Year 
Award too Chamber of Commerce, so congratulations.

76
00:44:41.760 --> 00:45:14.120
And that's it for me, Chair. - Thank you. Mrs. 
Harding? - Yeah. So I have the privilege of serving on Pasco County's Commission on Human 
Trafficking and one of the projects that I have been honored to help lead is the development of 
the Comprehensive Human Trafficking Awareness Training for Pasco County Schools. This training 
was created to ensure that our district meets the state requirement and that all school employees 
receive annual training on this critical topic. And we've also shared this training with all of 
our charter schools as well. I know you guys have heard me talk about it, but I wanted to give you 
guys a little update on it. This training launched

77
00:45:14.120 --> 00:45:45.840
at the beginning of last month, and to date we've 
had 671 employees successfully complete it. That's during summer. So we've had pre and post data. In 
addition to this training, we've partnered with the USF TIP Lab to evaluate this effectiveness. 
Staff members complete both the pre-training and post-training survey to measure changes in 
their knowledge, awareness, and confidence in recognizing and responding to potential signs of 
human trafficking. those the difficult and often emotional topic the feedback from our employees 
has been over mill overwhelmingly positive and I'd like to share a few comments from 
staff members that highlight the impact that

78
00:45:45.840 --> 00:46:17.360
this training is already having. One staff member 
said that the part of the training they found most valuable in her professional role was learning the 
warning signs and indicators of human trafficking that may appear in the school setting. As an 
educator it was especially helpful to better understand behavioral emotional and attendance 
related red flags that could signal a student that may be at risk. Another comment that was 
made was, "I would rate the overall quality of this training as excellent. The content 
was well organized, clearly presented and aligned with the practical realities educators 
face. The structure made the material easy to

79
00:46:17.360 --> 00:46:50.320
follow while addressing a complex and sensitive 
topics in the appropriate link level of depth." USF is also going to administer follow-up surveys 
at the three and six month mark to help measure the long-term impacts of this training. They will 
analyze the results and share that data with us, giving us valuable insight on how this training 
is increasing awareness and preparedness among our staff. I want to give I want to extend a heartfelt 
thank you to Mrs. Kuhn for her tremendous work in helping bring this project to life so thank you 
Mrs. Kuhn and I'd like to recognize Dr. Iles, Mrs. Musselwhite and Mr. Chasen and Student 
Services for their partnership and support

80
00:46:50.320 --> 00:47:27.200
and helping get this launched as well throughout 
this process so thank you very much. I'm really excited to see more and more of the results 
and I'll keep you guys updated as we go. I know this was mentioned earlier Dr. Lang I'm 
going to reiterate a few things if that's okay. While we've celebrated this achievement 
several times it is now official right if the grades came out and I would like to take 
a moment to once again recognize our students, teachers, staff, school leaders, and families 
that is now official that Pasco County Schools is a rated school district. This accomplishment 
is the result of years of hard work, dedication, and unwavering commitment to student success. It 
reflects the countless hours our teachers spend

81
00:47:27.200 --> 00:47:57.840
planning engaging lessons in the leadership of 
our administrators, the support of our staff, the perseverance of our students, and the 
partnership of our families and community. This achievement truly belongs to every person who 
has played a role in helping our students succeed. But as we move through the school year, I 
would ask, and Dr. Leguir already mentioned, that you continue to provide the board with 
updates of the progress that we're making, the interventions and strategies being implemented 
to maintain our A rating, and the areas where we will still opportunities to improve. While we 
should be absolutely celebrating this historic

82
00:47:57.840 --> 00:48:34.960
milestone we also recognize that the continuous 
improvement is what will keep us moving forward as well as the areas that we need to continue to 
work on and A rating is not the finish line as you mentioned it is a foundation we will continue 
to build upon as we strive to provide the best education for every student. Congratulations again 
to our students, teachers, staff, school leaders and families. Thank you for your dedication, 
your resilience and your unwavering commitment to making Pasco County Schools a district 
where our entire community can be proud of. I also wanted to provide a brief update to 
my peers. I know in the past I brought up wanting to create a financial transparency 
dashboard. This continues to be a priority of mine

83
00:48:34.960 --> 00:49:09.920
because I do believe that our community deserves 
some pictures and clear accessible and easy to understand information how this district resources 
are being utilized. And so I know Mrs. Taylor and her team have been working really hard on this 
and I'm so grateful. They have sent me some preliminary things to look at and I a follow-up 
meeting scheduled with staff in the coming weeks to review the progress that has been made to see 
what has been developed thus far and I appreciate the work that has already gone into this project 
and I look forward to continuing our collaboration so that's that's my report thank you. Thank you. 
Mrs. Armstrong. All right well I really appreciate

84
00:49:09.920 --> 00:49:44.680
all the staff comments and my school board members 
comments about everything that district staff has done over the summer. It really is amazing how 
much goes on because I do get that question a lot. It's a district you know there's a little bit 
slower now aren't they and I said no not really because also including that is the budget as 
well as everything else that was mentioned. But I'd also want to mention that the teachers they don't get the whole summer off. Most of them 
are out there during professional development,

85
00:49:44.680 --> 00:50:20.440
they're doing advanced planning for the school 
year to make sure they get off to a strong start. So while we hope they had a very nice, took some 
family time to recharge their their batteries, we do recognize that a lot of them are 
doing professional development and planning. Something that I got to do that was fun. I went 
out to the EMC, which is on the coast where we take the kids out to learn all about what happens 
out in the Gulf and what happens right along the

86
00:50:20.440 --> 00:50:55.600
coast. And they're working currently on the Durney 
Key, which is an island that's a short boat ride off of our EMC. They're able to take students out 
to Durney Key because of two pontoon boats that were provided by the Restore Act funds. And so 
what's going on out there, especially high school kids are going out there, They're doing surveys 
of the plants and animals on the key. They're restoring the native plants and helping get rid of 
the invasive plants, while still maintaining it as

87
00:50:55.600 --> 00:51:29.680
a place for recreation, because a lot of boaters 
do use that for recreation. And along those lines, there's a plan to put out oyster domes along the 
island. That's going to help prevent erosions. It's also going to help promote the growth 
of oysters. It helps purify the water. So along with -- I went out to my Rotary Club 
that did -- Rotary did do a grant to support this effort. So we had a work evening after we 
visited the island making oyster domes, pouring

88
00:51:29.680 --> 00:52:02.560
concrete, all that was involved in putting 
the molds together, pouring the concrete, doing what has to be done and seeing the finished 
products. They've managed to get all the students involved in that. High school kids are very 
involved in making the domes. In fact, we had one daughter from a member that was out there, had 
been out there a lot of the summer donating time, volunteering time, so she was helping us know 
exactly how to build these oyster domes. And then

89
00:52:02.560 --> 00:52:41.200
the younger students are having the experience 
of actually cementing oyster shells onto the dome to help promote some more growth. So it's a very 
great project. All the data they're collecting is being shared out there. I know the University of 
South Florida, I think, is looking at that data. So it's an amazing learning experience for the 
kids. And it was just fun to see everything that goes out, goes on out the EMC. So that was my 
fun experience this summer at the school system.

90
00:52:41.880 --> 00:53:14.160
Thank you, Mrs. Armstrong. Mr. Hernandez. 
Thank you, Madam Chair. I also like to take a moment to recognize and thank everyone across our 
district for what has been an extraordinary year. Take time to enjoy it as well. Sometimes we look 
ahead, but we need to take time to enjoy it. and now having to maintain an A-rated 
district status is a tremendous accomplishment and a lot of tremendous work that got into 
it. Moving from a 39th to 25th in the state is more than just an improvement in 
ranking. It reflects the dedication,

91
00:53:14.160 --> 00:53:50.960
the perseverance, and the unwavering commitment 
of our teachers, support staff, administrators, students, and families. While we should absolutely 
celebrate his achievement, we also recognize that excellence is not a destination but it is a 
marathon. As our superintendent commented our responsibility is to continue building on 
this momentum and never become complacent. I also want to acknowledge the incredible 
work of our transportation department. Beginning the school year with only 17 vacancies 
is a tremendous and remarkable achievement

92
00:53:50.960 --> 00:54:29.280
especially considering the work for challenges 
that the district faces across the state and that we continue to face. That progress 
is the result of intentional planning, strong leadership, and a team committed 
to ensuring our students arrive at school safely and on time. I'd like to express my 
appreciation for today's budget workshop. The transparency, clarity, and thoughtful 
discussion provided a strong understanding of our financial position and the priorities ahead. 
Responsible stewardship of taxpayers dollars is one of the most important responsibilities that 
we all have. And I have and I appreciate the work

93
00:54:29.280 --> 00:55:01.160
that went into presenting the information 
in such clear and comprehensive manner. Thank you to everyone who has contributed 
to this success. We have much to be proud of but even more to strive for. I look forward to 
witness where this journey will take the district as we serve our students, support employees 
and strengthen our community. And for her award and her ongoing commitment and contributions to 
our community. Thank you. I met with the leader

94
00:55:01.160 --> 00:55:35.840
of Discovery Academy of Science Charter School of 
Pinellas because they will be coming to Pasco and wanted to build relationships so they just shared 
a little bit about what they're going to offer for our Pasco students. I also have talked to 
staff about the family exit surveys and asked for updates to see if data shows any families leaving 
any schools due to lack of transportation and and or if they are leaving the district for that 
reason and where they're going are they going to other zone schools so I know they're looking into 
that I know we have a new process in place to get

95
00:55:35.840 --> 00:56:07.040
more surveys completed which I am pleased about 
and I'm hopeful that the information we see helps us make decisions going forward now as we prepare 
for 2627. I know it seems like old news now but we haven't met since the grades were released so 
I too feel compelled to say congratulations to our students, families, teachers, support, 
staff, administrators, and our leaders. Earning an A district grade is an accomplishment 
that reflects years of hard work, a commitment to

96
00:56:07.040 --> 00:56:41.000
continuous improvement, and a shared belief that 
every child deserves a high-quality education. I am especially pleased that we have no DRF 
schools. While school grades are only one measure of success and never tell the complete story 
of a school, they are an important benchmark for our community and a reflection of the 
progress being made across our district. These results did not happen overnight. They 
are a product of dedicated educators who show up every day to support students, bus drivers who 
safely transport our children, paraprofessionals

97
00:56:41.000 --> 00:57:11.640
who provide critical assistance, and countless 
employees working behind the scenes to ensure our schools operate successfully and safely 
and our teachers have the resources they need. I also wanna thank our community. The Pasco County 
Schools salary referendum that the Pasco citizens supported in 2022 has helped us remain 
competitive in attracting and retaining high quality teachers and non-administrator staff. 
When our community voted to invest in our schools,

98
00:57:11.640 --> 00:57:47.760
they invested in people. And these results are 
a reminder that investing in people matters. There is still work to be due and we 
will never stop striving to improve. But tonight I wanna thank everyone who played a 
role in the success. Thank you to your commitment, to our students, and for helping make Pasco 
County Schools a district we can all be proud of. I also wanna thank staff for meeting with 
the USF team about possible partnerships to provide more opportunities for students. We 
have so many wonderful community partners who

99
00:57:47.760 --> 00:58:19.040
invest in the future of our students. So 
thank you for our team. You know, we get, I'm sure you all do, we get people reaching 
out to us all the time and I feel I pass a lot of things on to Dr. Zeci. And I appreciate that 
there's always follow up on that. So thank you. And one thing I just wanted to revisit, We talked 
about it last spring maybe, is trying to maybe have workshop on a non-school board meeting 
day. And so I just wanted to follow up and

100
00:58:19.040 --> 00:58:57.000
see if maybe -- I know it's hard with everyone's 
schedules, but I know there's some topics that sometimes we want to have longer discussions on, 
so I just wanted to kind of put it on the radar again. Sure. And just as a follow-up to that, and 
I hope that sounds like I make an excuse here, the challenge has been is getting everybody's 
schedule together and that work for everyone. You know our board assistant will continue to kind 
of try to coordinate your schedule So I don't want to put it back on the team, you know But it is the 
biggest hurdle is just getting everyone's skin. So is everyone still interested in that maybe if 
it works? Yeah Yeah, I've been interested Yes,

101
00:58:57.000 --> 00:59:33.480
thank you, I think that's all I had do you have 
any other new business? Okay attorney meeker Yes one matter for the board as you may recall 
during the last board meeting I had requested a closed litigation session in order to get 
advice from the board on some litigation strategy today After that we probably noticed a closed 
litigation session and today I would like for the board to take a recess from this meeting so we 
can have that closed litigation session and then of course After the session we will reconvene 
the meeting just for public notice purposes

102
00:59:34.360 --> 01:00:09.640
that the closed litigation session will include 
all board members, myself, and the superintendent, and that it should probably -- I would say it 
would take hopefully no longer than an hour, but again, it depends on questions from the 
board. And this will be on the matter of ISA minor plaintiff versus the District School 
Board of Pasco County. The case number It's going to be 2025 CA003723 CAAXES. And that is a case 
that's in the circuit court of the six judicial

103
01:00:09.640 --> 01:00:46.000
circuit in Infor, Pasco County, Florida. So if it 
is okay with the board, I would request that we recess the school board meeting so that we 
can conduct a closed litigation session at this time. >> Okay. I just wanted to clarify for 
the public. recess the meeting so we will have to clear the room to have that, but then we will 
reconvene and we will have our public comment. I know I've got four cards here, so we are not 
ignoring you. We will come back and finish the meeting. So at this time, I'm going to go 